IDOT contract 62W71 bid tabulation
Section 2024-952-RS,SW. Let by Illinois DOT on January 17, 2025, Cook, District 01. 5 bids received; low bid $1,098,089 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 93
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $1,098,089 | Low |
| 2 | K-Five Construction Corporation | $1,239,031 | +13% |
| 3 | Builders Paving, LLC | $1,297,424 | +18% |
| 4 | Schroeder Asphalt Services, Inc. | $1,310,263 | +19% |
| 5 | Plote Construction, Inc. | $1,331,450 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. K-Five Construction Corporation | 3. Builders Paving, LLC | 4. Schroeder Asphalt Services, Inc. | 5. Plote Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $5,900.00 | $4,534.84 | $10,000 | $8,500.00 | $5,000.00 |
| 2 | Serv instl GR MT MTR (X1400150) | EACH | 1 | $3,129.94 | $3,129.94 | $3,725.00 | $3,600.00 | $3,129.94 |
| 3 | Ped signal post 10 FT (X1400367) | EACH | 1 | $1,320.22 | $1,320.22 | $1,385.00 | $1,500.00 | $1,320.22 |
| 4 | Detectable warn SPL (X4240800) | SF | 340 | $35.00 | $55.00 | $55.00 | $52.00 | $45.00 |
| 5 | CC&G RMVL repl < = 10 (X4400501) | LF | 127 | $61.00 | $65.00 | $85.00 | $105.00 | $95.00 |
| 6 | CC&G RMVL repl > 10FT (X4400503) | LF | 2,319 | $47.50 | $55.00 | $60.00 | $83.00 | $75.00 |
| 7 | SS cleaned 12 (X5537800) | LF | 975 | $3.00 | $3.00 | $3.00 | $3.50 | $1.00 |
| 8 | FR & lids adjust SPL (X6030310) | EACH | 50 | $1,150.00 | $1,150.00 | $1,150.00 | $1,300.00 | $1,150.00 |
| 9 | Accessible ped signal (X8760200) | EACH | 4 | $1,949.86 | $1,949.86 | $2,410.00 | $2,300.00 | $1,949.86 |
| 10 | Conc FDN TY A 12D (X8780012) | LF | 4 | $303.16 | $303.16 | $435.00 | $355.00 | $303.16 |
| 11 | Drainage STR cleaned (Z0018500) | EACH | 65 | $350.00 | $350.00 | $350.00 | $400.00 | $330.00 |
| 12 | Temp info signing (Z0030850) | SF | 110 | $15.00 | $16.00 | $18.00 | $22.00 | $20.00 |
| 13 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $735.00 | $735.00 | $1,008.00 | $1,000.00 | $735.00 |
| 14 | Earth excavation (20200100) | CY | 40 | $70.00 | $65.00 | $100.00 | $80.00 | $100.00 |
| 15 | Topsoil F & P 4 (21101615) | SY | 357 | $5.00 | $7.00 | $12.50 | $6.00 | $0.10 |
| 16 | Nitrogen fert nutr (25000400) | LB | 2.80 | $5.00 | $4.00 | $5.00 | $6.00 | $1.00 |
| 17 | Phosphorus fert nutr (25000500) | LB | 2.80 | $5.00 | $4.00 | $5.00 | $6.00 | $1.00 |
| 18 | Potassium fert nutr (25000600) | LB | 2.80 | $5.00 | $4.00 | $5.00 | $6.00 | $1.00 |
| 19 | Sodding salt tolerant (25200110) | SY | 357 | $30.00 | $19.00 | $25.50 | $35.00 | $28.00 |
| 20 | Supple watering (25200200) | UNIT | 3 | $100.00 | $0.01 | $40.00 | $110.00 | $1.00 |
| 21 | Agg subgrade impr 12 (30300112) | SY | 21 | $25.00 | $187.14 | $200.00 | $45.00 | $65.00 |
| 22 | HMA base cse 8 (35501316) | SY | 106 | $84.00 | $91.67 | $140.00 | $110.00 | $130.00 |
| 23 | Bit matls tack CT (40600290) | LB | 14,262 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 24 | Long joint sealant (40600370) | LF | 10,373 | $2.17 | $2.49 | $2.65 | $2.80 | $2.48 |
| 25 | Mix CR JTS flangewys (40600400) | TON | 32 | $440.00 | $50.00 | $785.00 | $300.00 | $125.00 |
| 26 | HMA surf rem butt JT (40600982) | SY | 439 | $15.00 | $1.00 | $10.00 | $8.00 | $22.50 |
| 27 | HMA repl over patch (40601005) | TON | 241 | $100.00 | $70.00 | $45.00 | $185.00 | $300.00 |
| 28 | P HMA BC IL-4.75 N50 (40603200) | TON | 872 | $127.00 | $129.06 | $105.00 | $112.00 | $135.00 |
| 29 | HMA SC IL-9.5 D N50 (40604060) | TON | 8 | $150.00 | $209.27 | $700.00 | $120.00 | $350.00 |
| 30 | HMA SC IL-9.5 D N70 (40604062) | TON | 1,775 | $103.00 | $92.21 | $90.00 | $96.00 | $100.00 |
| 31 | Protective coat (42001300) | SY | 983 | $0.01 | $3.00 | $3.00 | $0.15 | $0.10 |
| 32 | PCC driveway pavt 6 (42300200) | SY | 25 | $157.00 | $145.00 | $145.00 | $210.00 | $190.00 |
| 33 | PCC driveway pavt 8 (42300400) | SY | 27 | $180.00 | $185.00 | $185.00 | $210.00 | $190.00 |
| 34 | PC conc sidewalk 5 (42400200) | SF | 4,588 | $10.75 | $15.00 | $15.00 | $11.25 | $10.00 |
| 35 | HMA surf rem 2 1/4 (44000158) | SY | 21,128 | $2.20 | $5.50 | $5.40 | $2.75 | $2.85 |
| 36 | Drive pavement rem (44000200) | SY | 156 | $7.25 | $30.00 | $30.00 | $20.00 | $60.00 |
| 37 | Sidewalk rem (44000600) | SF | 4,588 | $1.30 | $5.00 | $7.00 | $4.50 | $4.00 |
| 38 | HMA RM OV patch 3 1/4 (44002213) | SY | 1,324 | $5.00 | $0.01 | $2.00 | $15.50 | $1.00 |
| 39 | Median removal (44003100) | SF | 21 | $22.25 | $5.00 | $5.00 | $54.00 | $48.00 |
| 40 | CL D patch T1 10 (44201761) | SY | 55 | $50.00 | $54.00 | $50.00 | $120.00 | $147.00 |
| 41 | CL D patch T2 10 (44201765) | SY | 381 | $50.00 | $54.00 | $35.00 | $115.00 | $147.00 |
| 42 | CL D patch T3 10 (44201769) | SY | 269 | $50.00 | $54.00 | $30.00 | $110.00 | $147.00 |
| 43 | CL D patch T4 10 (44201771) | SY | 446 | $50.00 | $54.00 | $25.00 | $105.00 | $147.00 |
| 44 | CB reconst (60252800) | EACH | 8 | $1,450.00 | $1,450.00 | $1,450.00 | $1,650.00 | $1,450.00 |
| 45 | Man reconst (60257900) | EACH | 1 | $1,650.00 | $1,650.00 | $1,650.00 | $1,850.00 | $1,650.00 |
| 46 | Inlets reconst (60262700) | EACH | 7 | $1,000.00 | $1,000.00 | $1,000.00 | $1,100.00 | $1,000.00 |
| 47 | Valve box adj (60266600) | EACH | 4 | $425.00 | $425.00 | $425.00 | $475.00 | $425.00 |
| 48 | FR & grates adjust (60300105) | EACH | 6 | $450.00 | $450.00 | $450.00 | $550.00 | $450.00 |
| 49 | FR & lids adjust (60300305) | EACH | 21 | $550.00 | $550.00 | $550.00 | $605.00 | $550.00 |
| 50 | FR & lids T1 OL (60406000) | EACH | 8 | $450.00 | $450.00 | $450.00 | $515.00 | $450.00 |
| 51 | FR & lids T1 CL (60406100) | EACH | 14 | $450.00 | $450.00 | $450.00 | $515.00 | $450.00 |
| 52 | Conc med TSB6.12 (60619600) | SF | 21 | $30.00 | $25.00 | $25.00 | $52.00 | $46.00 |
| 53 | Non SPL waste disposl (66900200) | CY | 40 | $70.00 | $65.00 | $165.00 | $105.00 | $125.00 |
| 54 | Soil disposal analy (66900530) | EACH | 3 | $1,625.00 | $1,450.00 | $1,625.00 | $1,800.00 | $1,625.00 |
| 55 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,100.00 | $3,400.00 | $3,800.00 | $3,400.00 |
| 56 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,200.00 | $500.00 | $600.00 | $500.00 |
| 57 | Reg sub mon (66901006) | CAL DAY | 10 | $700.00 | $680.00 | $700.00 | $900.00 | $700.00 |
| 58 | Engr field office A (67000400) | CAL MO | 12 | $2,500.00 | $3,300.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 59 | Mobilization (67100100) | LS | 1 | $68,000 | $74,350 | $145,000 | $40,000 | $77,000 |
| 60 | TR cont & prot 701606 (70102625) | LS | 1 | $81,000 | $107,014 | $55,000 | $30,000 | $21,000 |
| 61 | TR cont & prot 701611 (70102634) | LS | 1 | $1.00 | $1.00 | $1.00 | $100.00 | $1.00 |
| 62 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $1.00 | $100.00 | $1.00 |
| 63 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $2,000.00 | $3,700.00 | $100.00 | $5,200.00 |
| 64 | Short term pavt mking (70300100) | LF | 2,303 | $0.01 | $1.00 | $2.50 | $2.00 | $1.25 |
| 65 | SHRT TRM pavt MK rem (70300150) | SF | 768 | $1.00 | $2.00 | $0.01 | $3.00 | $5.00 |
| 66 | Temp PVT MK LTR & sym paint (70300211) | SF | 576 | $0.01 | $0.01 | $0.01 | $2.00 | $0.01 |
| 67 | Temp PVT MK line 4 - paint (70300221) | LF | 7,216 | $0.01 | $0.01 | $0.01 | $0.55 | $0.01 |
| 68 | Temp PVT MK line 6 - paint (70300241) | LF | 455 | $0.01 | $0.01 | $0.01 | $0.60 | $0.01 |
| 69 | Temp PVT MK line 24 - paint (70300281) | LF | 12,723 | $0.01 | $0.01 | $0.01 | $1.75 | $0.01 |
| 70 | Reloc sin pan assy TA (72400500) | EACH | 1 | $150.00 | $1,750.00 | $1,000.00 | $200.00 | $100.00 |
| 71 | THPL PVT MK LTR & sym (78000100) | SF | 192 | $4.00 | $4.15 | $4.00 | $4.40 | $4.15 |
| 72 | THPL PVT MK line 4 (78000200) | LF | 2,406 | $0.95 | $0.70 | $0.95 | $1.15 | $0.70 |
| 73 | THPL PVT MK line 6 (78000400) | LF | 152 | $1.15 | $1.05 | $1.15 | $1.35 | $1.05 |
| 74 | THPL PVT MK line 24 (78000650) | LF | 4,241 | $4.15 | $4.15 | $4.15 | $4.70 | $4.15 |
| 75 | Raised refl pavt MKR (78100100) | EACH | 30 | $165.00 | $155.00 | $165.00 | $185.00 | $155.00 |
| 76 | Raised ref PVT MK rem (78300200) | EACH | 30 | $20.00 | $5.00 | $15.00 | $80.00 | $20.00 |
| 77 | PVT MKG rem WTR blast (78300202) | SF | 190 | $18.50 | $16.50 | $20.00 | $12.00 | $22.50 |
| 78 | Undrgrd C galvs 2 (81028200) | LF | 11 | $55.97 | $55.97 | $180.00 | $53.00 | $55.97 |
| 79 | Main EX TR sig instal (85000200) | EACH | 1 | $1,870.89 | $1,870.89 | $7,500.00 | $2,150.00 | $1,870.89 |
| 80 | Elcbl C signal 14 2C (87301215) | LF | 186 | $3.89 | $3.89 | $3.30 | $4.40 | $3.89 |
| 81 | Elcbl C signal 14 3C (87301225) | LF | 140 | $4.02 | $4.02 | $3.45 | $4.50 | $4.02 |
| 82 | Elcbl C lead 14 1PR (87301305) | LF | 691 | $4.00 | $4.00 | $3.45 | $4.50 | $4.00 |
| 83 | Elcbl C serv 6 2C (87301805) | LF | 25 | $5.15 | $5.15 | $5.10 | $5.75 | $5.15 |
| 84 | Elcbl C egrdc 6 1C (87301900) | LF | 41 | $8.93 | $8.93 | $4.00 | $10.00 | $8.93 |
| 85 | Conc FDN TY A (87800100) | LF | 4 | $321.86 | $321.86 | $460.00 | $355.00 | $321.86 |
| 86 | Drill EX handhole (87900200) | EACH | 1 | $962.94 | $962.94 | $460.00 | $1,100.00 | $962.94 |
| 87 | Inductive loop detect (88500100) | EACH | 2 | $203.12 | $203.12 | $225.00 | $230.00 | $203.12 |
| 88 | Det loop T1 (88600100) | LF | 303 | $35.90 | $35.90 | $47.00 | $41.00 | $35.90 |
| 89 | Reloc EX ped sig head (89500200) | EACH | 1 | $489.72 | $489.72 | $330.00 | $600.00 | $489.72 |
| 90 | Mod EX contr (89502200) | EACH | 1 | $992.72 | $992.72 | $1,310.00 | $1,125.00 | $992.72 |
| 91 | Rem elcbl FR con (89502300) | LF | 196 | $2.34 | $2.34 | $2.80 | $3.00 | $2.34 |
| 92 | Remov EX TS equip (89502375) | EACH | 1 | $935.44 | $935.44 | $500.00 | $1,050.00 | $935.44 |
| 93 | Remov EX conc FDN (89502385) | EACH | 1 | $990.44 | $990.44 | $500.00 | $1,210.00 | $990.44 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.