IDOT contract 62X15 bid tabulation
Section 2024-990-RS,SW. Let by Illinois DOT on January 17, 2025, Cook, District 01. 5 bids received; low bid $1,483,000 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 101
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $1,483,000 | Low |
| 2 | Builders Paving, LLC | $1,532,388 | +3.0% |
| 3 | Plote Construction, Inc. | $1,545,864 | +4.0% |
| 4 | Schroeder Asphalt Services, Inc. | $1,646,133 | +11% |
| 5 | R. W. Dunteman Company | $1,733,129 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Builders Paving, LLC | 3. Plote Construction, Inc. | 4. Schroeder Asphalt Services, Inc. | 5. R. W. Dunteman Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $10,000 | $6,000.00 | $6,500.00 | $10,000 | $6,500.00 |
| 2 | Ped signal post 10 FT (X1400367) | EACH | 4 | $1,206.00 | $1,200.00 | $1,206.08 | $1,500.00 | $1,206.08 |
| 3 | Rem EX ped push buttn (X1400423) | EACH | 6 | $65.00 | $65.00 | $64.45 | $100.00 | $64.45 |
| 4 | Rebld EX HD handhole (X1400450) | EACH | 3 | $2,850.00 | $2,850.00 | $2,850.12 | $3,150.00 | $2,850.12 |
| 5 | Rem & R-E block wall (X1700087) | LS | 1 | $3,000.00 | $4,000.00 | $3,950.00 | $5,000.00 | $3,950.00 |
| 6 | Temporary ramp SPL (X4060995) | SY | 477 | $37.00 | $60.00 | $1.00 | $25.00 | $20.55 |
| 7 | CC&G RMVL repl < = 10 (X4400501) | LF | 74 | $58.00 | $57.00 | $60.00 | $85.80 | $97.40 |
| 8 | CC&G RMVL repl > 10FT (X4400503) | LF | 2,367 | $48.50 | $57.00 | $58.00 | $85.80 | $75.65 |
| 9 | SS cleaned 12 (X5537800) | LF | 918 | $3.00 | $2.50 | $1.00 | $4.00 | $3.00 |
| 10 | FR & lids adjust SPL (X6030310) | EACH | 30 | $1,150.00 | $1,050.00 | $1,150.00 | $1,250.00 | $1,150.00 |
| 11 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,300.00 | $3,750.00 | $3,500.00 | $3,000.00 | $3,000.00 |
| 12 | Intercept EX conduit (X8100863) | EACH | 1 | $660.00 | $660.00 | $660.52 | $750.00 | $660.52 |
| 13 | Accessible ped signal (X8760200) | EACH | 10 | $1,904.00 | $1,900.00 | $1,904.72 | $2,175.00 | $1,904.72 |
| 14 | Conc FDN TY A 12D (X8780012) | LF | 16 | $311.00 | $310.00 | $311.70 | $360.00 | $311.70 |
| 15 | Det loop repl (X8860105) | LF | 1,463 | $25.00 | $25.00 | $25.18 | $30.00 | $25.18 |
| 16 | Gas valve adjusted (Z0001110) | EACH | 10 | $450.00 | $450.00 | $450.00 | $500.00 | $450.00 |
| 17 | Drainage STR cleaned (Z0018500) | EACH | 51 | $330.00 | $330.00 | $330.00 | $400.00 | $330.00 |
| 18 | Temp info signing (Z0030850) | SF | 121 | $20.00 | $14.00 | $20.00 | $22.00 | $20.00 |
| 19 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 2 | $900.00 | $900.00 | $900.00 | $1,100.00 | $900.00 |
| 20 | RR prot liability ins (Z0048665) | LS | 1 | $7,500.00 | $5,000.00 | $6,000.00 | $3,500.00 | $5,000.00 |
| 21 | Nitrogen fert nutr (20101400) | LB | 3 | $5.00 | $6.00 | $6.00 | $8.00 | $6.00 |
| 22 | Phosphorus fert nutr (20101500) | LB | 3 | $5.00 | $6.00 | $6.00 | $8.00 | $6.00 |
| 23 | Potassium fert nutr (20101600) | LB | 3 | $5.00 | $6.00 | $6.00 | $8.00 | $6.00 |
| 24 | Earth excavation (20200100) | CY | 41 | $55.00 | $75.00 | $90.00 | $66.00 | $69.48 |
| 25 | Topsoil F & P 4 (21101615) | SY | 63 | $0.01 | $19.00 | $19.00 | $23.00 | $19.00 |
| 26 | Seeding CL 1B (25000115) | ACRE | 0.10 | $13,500 | $9,000.00 | $9,000.00 | $11,000 | $9,000.00 |
| 27 | Sodding salt tolerant (25200110) | SY | 63 | $124.00 | $77.00 | $77.00 | $85.00 | $77.00 |
| 28 | Supple watering (25200200) | UNIT | 3.20 | $100.00 | $50.00 | $1.00 | $58.00 | $50.00 |
| 29 | Temp eros contr seed (28000250) | LB | 17.60 | $10.00 | $20.00 | $20.00 | $25.00 | $20.00 |
| 30 | HMA base cse 8 (35501316) | SY | 53 | $150.00 | $80.00 | $100.00 | $115.00 | $85.00 |
| 31 | Bit matls tack CT (40600290) | LB | 19,192 | $0.01 | $0.01 | $1.65 | $0.01 | $0.01 |
| 32 | Long joint sealant (40600370) | LF | 19,684 | $2.65 | $3.25 | $2.67 | $3.10 | $3.45 |
| 33 | Mix CR JTS flangewys (40600400) | TON | 54 | $50.00 | $300.00 | $120.00 | $300.00 | $244.50 |
| 34 | HMA surf rem butt JT (40600982) | SY | 675 | $10.00 | $20.00 | $1.00 | $8.00 | $26.05 |
| 35 | HMA BC IL-9.5 N70 (40602985) | TON | 1,658 | $105.00 | $74.00 | $95.00 | $95.00 | $101.90 |
| 36 | HMA SC IL-9.5 D N50 (40604060) | TON | 10 | $320.00 | $300.00 | $400.00 | $125.00 | $211.35 |
| 37 | HMA SC IL-9.5 D N70 (40604062) | TON | 3,465 | $115.00 | $73.00 | $95.00 | $95.00 | $100.25 |
| 38 | Protective coat (42001300) | SY | 1,096 | $1.00 | $0.01 | $0.10 | $0.11 | $1.00 |
| 39 | PC conc sidewalk 5 (42400200) | SF | 2,541 | $14.50 | $10.00 | $17.00 | $10.73 | $9.50 |
| 40 | Detectable warnings (42400800) | SF | 293 | $42.00 | $40.00 | $45.00 | $44.00 | $39.00 |
| 41 | HMA surf rem 1 3/4 (44000156) | SY | 20,649 | $3.00 | $3.00 | $2.15 | $3.30 | $3.15 |
| 42 | HMA surf rem 3 3/4 (44000164) | SY | 14,706 | $6.00 | $6.00 | $4.15 | $4.25 | $6.55 |
| 43 | Drive pavement rem (44000200) | SY | 99 | $75.00 | $45.00 | $65.00 | $20.00 | $28.00 |
| 44 | Sidewalk rem (44000600) | SF | 2,410 | $1.00 | $6.00 | $3.25 | $3.30 | $2.50 |
| 45 | CL D patch T1 8 (44201737) | SY | 16 | $26.00 | $100.00 | $45.00 | $90.00 | $148.65 |
| 46 | CL D patch T2 8 (44201741) | SY | 604 | $26.00 | $40.00 | $45.00 | $85.00 | $97.40 |
| 47 | CL D patch T3 8 (44201745) | SY | 88 | $26.00 | $40.00 | $45.00 | $83.00 | $88.65 |
| 48 | CL D patch T4 8 (44201747) | SY | 440 | $26.00 | $40.00 | $45.00 | $82.00 | $77.65 |
| 49 | CL D patch T1 10 (44201761) | SY | 14 | $32.50 | $125.00 | $150.00 | $115.00 | $201.50 |
| 50 | CL D patch T2 10 (44201765) | SY | 205 | $32.50 | $50.00 | $150.00 | $110.00 | $112.95 |
| 51 | CL D patch T3 10 (44201769) | SY | 123 | $32.50 | $50.00 | $150.00 | $105.00 | $101.15 |
| 52 | CL D patch T4 10 (44201771) | SY | 82 | $32.50 | $50.00 | $150.00 | $103.00 | $94.80 |
| 53 | Water valves adjust (56109210) | EACH | 5 | $550.00 | $550.00 | $550.00 | $600.00 | $550.00 |
| 54 | CB reconst (60252800) | EACH | 1 | $1,450.00 | $1,250.00 | $1,450.00 | $1,650.00 | $1,450.00 |
| 55 | Man reconst (60257900) | EACH | 1 | $1,650.00 | $1,450.00 | $1,650.00 | $1,850.00 | $1,650.00 |
| 56 | Inlets reconst (60262700) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,150.00 | $1,000.00 |
| 57 | FR & grates adjust (60300105) | EACH | 20 | $450.00 | $450.00 | $450.00 | $500.00 | $450.00 |
| 58 | FR & lids adjust (60300305) | EACH | 7 | $550.00 | $550.00 | $550.00 | $610.00 | $550.00 |
| 59 | Valve box frames adj (60300405) | EACH | 5 | $425.00 | $425.00 | $425.00 | $475.00 | $425.00 |
| 60 | FR & grates T24 (60404950) | EACH | 1 | $585.00 | $585.00 | $585.00 | $630.00 | $585.00 |
| 61 | FR & lids T1 CL (60406100) | EACH | 16 | $450.00 | $450.00 | $450.00 | $500.00 | $450.00 |
| 62 | Non SPL waste disposl (66900200) | CY | 41 | $100.00 | $135.00 | $115.00 | $71.50 | $98.75 |
| 63 | Soil disposal analy (66900530) | EACH | 4 | $1,450.00 | $1,575.00 | $1,575.00 | $1,750.00 | $1,575.00 |
| 64 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $3,400.00 | $3,400.00 | $3,000.00 | $3,400.00 |
| 65 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $500.00 | $500.00 | $2,450.00 | $500.00 |
| 66 | Reg sub mon (66901006) | CAL DAY | 8 | $680.00 | $700.00 | $700.00 | $1,150.00 | $700.00 |
| 67 | Mobilization (67100100) | LS | 1 | $69,066 | $139,473 | $90,000 | $30,000 | $101,001 |
| 68 | TR cont & prot 701606 (70102625) | LS | 1 | $7,000.00 | $105,000 | $65,000 | $35,000 | $36,000 |
| 69 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $10,865 |
| 70 | TR cont & prot 701611 (70102634) | LS | 1 | $500.00 | $1.00 | $1,000.00 | $1.00 | $11,775 |
| 71 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $38,600 |
| 72 | TR cont & prot 701801 (70102640) | LS | 1 | $4,900.00 | $1.00 | $4,900.00 | $1.00 | $8,875.00 |
| 73 | Short term pavt mking (70300100) | LF | 6,396 | $1.50 | $2.00 | $2.25 | $2.00 | $1.00 |
| 74 | SHRT TRM pavt MK rem (70300150) | SF | 2,132 | $2.50 | $0.01 | $2.20 | $3.00 | $2.54 |
| 75 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,720 | $0.01 | $0.01 | $0.01 | $1.20 | $0.01 |
| 76 | Temp PVT MK line 4 - paint (70300221) | LF | 33,908 | $0.01 | $0.01 | $0.01 | $0.33 | $0.01 |
| 77 | Temp PVT MK line 6 - paint (70300241) | LF | 4,198 | $0.01 | $0.01 | $0.01 | $0.45 | $0.01 |
| 78 | Temp PVT MK line 12 - paint (70300261) | LF | 2,640 | $0.01 | $0.01 | $0.01 | $1.12 | $0.01 |
| 79 | Temp PVT MK line 24 - paint (70300281) | LF | 1,890 | $0.01 | $0.01 | $0.01 | $1.70 | $0.01 |
| 80 | THPL PVT MK LTR & sym (78000100) | SF | 860 | $4.00 | $4.65 | $4.00 | $5.10 | $4.65 |
| 81 | THPL PVT MK line 4 (78000200) | LF | 16,954 | $0.67 | $0.70 | $0.67 | $0.90 | $0.70 |
| 82 | THPL PVT MK line 6 (78000400) | LF | 2,099 | $1.00 | $0.85 | $1.00 | $1.25 | $0.85 |
| 83 | THPL PVT MK line 12 (78000600) | LF | 1,320 | $2.00 | $2.65 | $2.00 | $2.80 | $2.65 |
| 84 | THPL PVT MK line 24 (78000650) | LF | 945 | $4.00 | $4.65 | $4.00 | $5.10 | $4.65 |
| 85 | Raised refl pavt MKR (78100100) | EACH | 498 | $43.50 | $31.00 | $33.00 | $44.00 | $31.00 |
| 86 | Raised ref PVT MK rem (78300200) | EACH | 286 | $5.00 | $12.00 | $15.00 | $12.00 | $16.84 |
| 87 | PVT MKG rem WTR blast (78300202) | SF | 10,770 | $0.01 | $1.00 | $0.01 | $2.80 | $0.01 |
| 88 | Undrgrd C galvs 2 (81028200) | LF | 61 | $104.82 | $105.00 | $104.82 | $58.20 | $104.82 |
| 89 | HD handhole (81400200) | EACH | 1 | $4,933.00 | $5,000.00 | $4,933.20 | $6,000.00 | $4,933.20 |
| 90 | Main EX TR sig instal (85000200) | EACH | 2 | $1,413.00 | $1,500.00 | $1,413.75 | $1,700.00 | $1,413.75 |
| 91 | Elcbl C signal 14 2C (87301215) | LF | 752 | $4.58 | $4.60 | $4.58 | $5.10 | $4.58 |
| 92 | Elcbl C signal 14 3C (87301225) | LF | 487 | $4.74 | $4.75 | $4.74 | $5.25 | $4.74 |
| 93 | Elcbl C lead 14 1PR (87301305) | LF | 364 | $4.73 | $4.75 | $4.73 | $5.25 | $4.73 |
| 94 | Elcbl C egrdc 6 1C (87301900) | LF | 40 | $5.15 | $5.15 | $5.15 | $5.80 | $5.15 |
| 95 | Drill EX handhole (87900200) | EACH | 5 | $400.00 | $400.00 | $400.08 | $450.00 | $400.08 |
| 96 | Ped SH LED 1F BM CDT (88102717) | EACH | 2 | $635.00 | $635.00 | $634.60 | $710.00 | $634.60 |
| 97 | Det loop T1 (88600100) | LF | 105 | $25.00 | $25.00 | $25.18 | $28.00 | $25.18 |
| 98 | Reloc EX ped sig head (89500200) | EACH | 4 | $351.00 | $350.00 | $351.37 | $1,350.00 | $351.37 |
| 99 | Rem & RE elcbl FR con (89502350) | LF | 107 | $4.00 | $4.00 | $4.12 | $4.75 | $4.12 |
| 100 | Rebuild EX handhole (89502376) | EACH | 5 | $2,845.00 | $2,900.00 | $2,843.92 | $3,200.00 | $2,843.92 |
| 101 | Remov EX handhole (89502380) | EACH | 1 | $580.00 | $580.00 | $577.98 | $650.00 | $577.98 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.