IDOT contract 62X59 bid tabulation

Section 2024-1017-RS. Let by Illinois DOT on June 13, 2025, Kane, District 01. 2 bids received; low bid $2,838,180 by Plote Construction, Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
142
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Plote Construction, Inc.$2,838,180Low
2Builders Paving, LLC$3,042,002+7.0%
IDOT contract 62X59: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Plote Construction, Inc.2. Builders Paving, LLC
1Constructn layout SPL (X0320050)LS1$20,000$19,000
2EM veh P S LSC 20 3C (X0324085)LF1,183$2.75$2.80
3Cellular modem (X0325922)EACH1$7,000.00$7,100.00
4Rem & rein bric paver (X0327611)SF1,180$14.00$14.00
5Centracs lic expnsn (X0328020)EACH4$15,025$15,500
6Serv instl GR MT MTR (X1400150)EACH1$5,240.00$5,400.00
7Lyr II datalink SWTCH (X1400216)EACH4$6,700.00$6,800.00
8Term fiber in cabinet (X1400217)EACH40$215.00$220.00
9Ped signal post 10 FT (X1400367)EACH4$2,150.00$2,200.00
10Ped signal post 5 FT (X1400378)EACH3$1,775.00$1,800.00
11Temporary ramp SPL (X4060995)SY375$10.00$36.00
12CC&G RMVL repl < = 10 (X4400501)LF200$69.00$72.00
13CC&G RMVL repl > 10FT (X4400503)LF3,063$62.00$66.00
14SS cleaned 12 (X5537800)LF300$1.00$3.00
15FR & lids adjust SPL (X6030310)EACH66$1,100.00$1,300.00
16Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,700.00$3,800.00
17Temp info signing (X7200061)SF366.80$17.00$18.00
18Intercept EX conduit (X8100863)EACH1$830.00$900.00
19Fac T super P cab SP (X8570233)EACH2$32,000$35,000
20Uninter power sup SPL (X8620200)EACH1$7,200.00$7,600.00
21FO CBL CDT 12F SGL MD (X8710013)LF4,870$2.00$2.00
22FO interct center 24P (X8710070)EACH4$1,900.00$2,000.00
23Splice fiber in cab (X8710317)EACH16$500.00$440.00
24Accessible ped signal (X8760200)EACH22$2,300.00$2,300.00
25Conc FDN TY A 12D (X8780012)LF40$425.00$430.00
26LED SF lens cover (X8809005)EACH13$560.00$570.00
27Temp TR signal timing (X8900104)EACH2$630.00$640.00
28Remv CBL from conduit (X8950508)LF18$1.00$2.00
29Drainage STR cleaned (Z0018500)EACH50$310.00$350.00
30RE-optimize TR sig sys 1 (Z0033044)EACH1$750.00$800.00
31Optim traf signal sys (Z0033056)EACH1$3,850.00$4,000.00
32Temp TR signal timing (Z0073510)EACH1$630.00$700.00
33Earth excavation (20200100)CY255$50.00$80.00
34Geotech fab F/GR stab (21001000)SY32$15.00$9.00
35Topsoil F & P 4 (21101615)SY1,174$0.10$8.00
36Sodding salt tolerant (25200110)SY1,174$27.00$16.00
37Supple watering (25200200)UNIT17.60$0.10$1.00
38Agg subgrade improve (30300001)CY11$60.00$230.00
39Agg subgrade impr 12 (30300112)SY128$40.00$52.00
40HMA base cse 8 (35501316)SY112$135.00$120.00
41HMA BC wid 13 (35600728)SY128$150.00$135.00
42Bit matls PR CT (40600275)LB287$0.01$1.00
43Bit matls tack CT (40600290)LB21,978$0.01$0.01
44Long joint sealant (40600370)LF13,739$3.75$4.09
45Mix CR JTS flangewys (40600400)TON49$150.00$650.00
46HMA surf rem butt JT (40600982)SY421$25.00$15.00
47HMA BC IL-9.5 N70 (40602985)TON2,273$85.00$87.00
48HMA BC IL-19.0 N90 (40603090)TON1,536$86.00$89.00
49HMA SC IL-9.5 D N50 (40604060)TON13$400.00$325.00
50HMA SC IL-9.5 D N70 (40604062)TON3,012$96.00$94.00
51Protective coat (42001300)SY2,356$0.01$0.01
52PC conc sidewalk 5 (42400200)SF14,235$10.00$8.20
53Detectable warnings (42400800)SF684$42.00$42.00
54Pavement rem (44000100)SY209$40.00$55.00
55HMA surf rem 3 3/4 (44000164)SY32,474$5.00$8.00
56Sidewalk rem (44000600)SF14,165$3.00$2.20
57Median removal (44003100)SF2,524$6.00$5.25
58Median removal (PD) (44003510)SF2,226$2.00$3.00
59CL D patch T1 10 (44201761)SY100$150.00$100.00
60CL D patch T2 10 (44201765)SY500$140.00$95.00
61CL D patch T3 10 (44201769)SY300$120.00$92.00
62CL D patch T4 10 (44201771)SY250$115.00$88.00
63CB adjust (60250200)EACH5$750.00$500.00
64CB adj new T1F OL (60250400)EACH2$1,000.00$1,200.00
65CB adj new T1F CL (60250500)EACH1$1,000.00$1,200.00
66CB reconst (60252800)EACH5$1,650.00$1,500.00
67Man adjust (60255500)EACH2$750.00$600.00
68Man reconst (60257900)EACH2$1,900.00$1,900.00
69FR & grates adjust (60300105)EACH17$750.00$500.00
70FR & lids adjust (60300305)EACH5$750.00$600.00
71FR & lids T1 ADA compl OL (60406001)EACH1$450.00$800.00
72Comb CC&G TB6.12 (60603800)LF220$55.00$56.00
73Conc median surf 4 (60618300)SF1,442$10.00$9.50
74Non SPL waste disposl (66900200)CY255$85.00$120.00
75Soil disposal analy (66900530)EACH3$1,100.00$1,050.00
76Reg sub P-const plan (66901001)LS1$4,900.00$5,200.00
77Reg sub F con report (66901003)LS1$500.00$500.00
78Reg sub mon (66901006)CAL DAY16$700.00$700.00
79Mobilization (67100100)LS1$134,200$175,000
80TR cont & prot 701501 (70102620)LS1$8,000.00$4,500.00
81TR cont & prot 701606 (70102625)LS1$8,000.00$7,500.00
82TR cont & prot 701601 (70102630)LS1$8,000.00$4,999.67
83TR cont & prot 701611 (70102634)LS1$8,000.00$5,000.00
84TR cont & prot 701701 (70102635)LS1$8,000.00$5,000.00
85TR cont & prot 701801 (70102640)LS1$12,000$15,000
86Short term pavt mking (70300100)LF23,370$0.10$1.25
87SHRT TRM pavt MK rem (70300150)SF9,747$0.10$1.00
88Temp PVT MK LTR & sym paint (70300211)SF1,548$0.01$1.50
89Temp PVT MK line 4 - paint (70300221)LF27,321$0.01$0.25
90Temp PVT MK line 6 - paint (70300241)LF2,952$0.01$0.38
91Temp PVT MK line 8 - paint (70300251)LF1,443$0.01$0.50
92Temp PVT MK line 12 - paint (70300261)LF7,161$0.01$0.75
93Temp PVT MK line 24 - paint (70300281)LF1,536$0.01$1.50
94Temp PVT MK L4 T4 tape (70307120)LF5,843$1.90$2.00
95Sign panel T1 (72000100)SF25$50.00$50.00
96THPL PVT MK LTR & sym (78000100)SF516$5.00$5.00
97THPL PVT MK line 4 (78000200)LF9,107$0.71$0.71
98THPL PVT MK line 6 (78000400)LF984$1.15$1.15
99THPL PVT MK line 8 (78000500)LF481$1.45$1.45
100THPL PVT MK line 12 (78000600)LF2,387$2.30$2.30
101THPL PVT MK line 24 (78000650)LF512$5.00$5.00
102Raised refl pavt MKR (78100100)EACH380$40.00$40.00
103Raised ref PVT MK rem (78300200)EACH380$10.00$22.00
104PVT MKG rem WTR blast (78300202)SF7,775$1.00$1.00
105Undrgrd C galvs 2 (81028200)LF4,835$22.00$22.00
106Undrgrd C galvs 3 (81028220)LF174$55.00$54.00
107Undrgrd C galvs 4 (81028240)LF347$60.00$60.00
108Handhole (81400100)EACH15$2,100.00$2,100.00
109HD handhole (81400200)EACH1$3,600.00$3,550.00
110DBL handhole (81400300)EACH1$4,300.00$4,300.00
111Main EX TR sig instal (85000200)EACH4$1,700.00$1,800.00
112Elcbl C tracer 14 1C (87300925)LF4,870$1.00$0.85
113Elcbl C signal 14 2C (87301215)LF2,994$1.10$1.10
114Elcbl C signal 14 3C (87301225)LF3,550$1.20$1.30
115Elcbl C signal 14 5C (87301245)LF2,102$1.75$1.60
116Elcbl C signal 14 7C (87301255)LF200$1.90$2.10
117Elcbl C lead 14 1PR (87301305)LF4,083$1.20$1.20
118Elcbl C serv 6 2C (87301805)LF87$3.00$3.00
119Elcbl C egrdc 6 1C (87301900)LF1,355$2.00$1.70
120TS post galvs 16 (87502500)EACH4$2,700.00$2,700.00
121S maa & P 14 (87700110)EACH1$15,000$15,500
122S maa & P 16 (87700120)EACH1$15,100$15,500
123S maa & P 24 (87700160)EACH1$16,300$17,000
124Conc FDN TY A (87800100)LF20$410.00$410.00
125Conc FDN TY C (87800150)LF4$700.00$700.00
126Conc FDN TY E 30D (87800400)LF30$410.00$410.00
127Drill EX handhole (87900200)EACH13$830.00$850.00
128SH LED 1F 3S mam (88030020)EACH6$925.00$920.00
129SH LED 1F 3S BM (88030050)EACH7$810.00$820.00
130Ped SH LED 1F BM CDT (88102717)EACH10$700.00$690.00
131TS backplate L F plas (88200410)EACH6$230.00$240.00
132Inductive loop detect (88500100)EACH12$550.00$540.00
133Det loop T1 (88600100)LF1,017$30.00$30.00
134Light detector (88700200)EACH6$1,800.00$1,850.00
135Light detector amp (88700300)EACH3$3,100.00$3,200.00
136Temp TR sig install (89000100)EACH1$64,000$73,000
137Reloc EX ped sig head (89500200)EACH4$700.00$700.00
138Reloc EX TS post (89501150)EACH3$1,700.00$1,700.00
139Mod EX contr (89502200)EACH2$2,000.00$2,100.00
140Remov EX TS equip (89502375)EACH3$3,200.00$3,200.00
141Remov EX handhole (89502380)EACH6$610.00$620.00
142Remov EX conc FDN (89502385)EACH10$550.00$560.00
IDOT contract 62X59: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy