Section 24R. Let by Illinois DOT on June 13, 2025, Jodaviess, District 02. 2 bids received; low bid $31,655,626 by Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 226
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. | $31,655,626 | Low |
| 2 | Martin & Company Excavating | $32,227,491 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. | 2. Martin & Company Excavating |
|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $250,000 | $45,000 |
| 2 | Cros sonic log A duct (X0320051) | LF | 132 | $30.00 | $65.00 |
| 3 | Cros sonic log test (X0320052) | EACH | 2 | $7,000.00 | $2,500.00 |
| 4 | STRM mit bank cred (X0328017) | EACH | 1,486.78 | $78.00 | $90.00 |
| 5 | WL mit bank cred (X0328022) | EACH | 0.65 | $50,000 | $65,000 |
| 6 | Rem EX septic tank (X0488100) | EACH | 1 | $1,500.00 | $3,400.00 |
| 7 | Geotechnical reinf (X2100104) | SY | 128,100 | $2.00 | $4.20 |
| 8 | Temp pavt removal (X4400110) | SY | 5,724 | $10.00 | $6.65 |
| 9 | HMA surf rem-long JT (X4401196) | SY | 2,386 | $13.50 | $13.60 |
| 10 | Conc rem spec (X5012502) | CY | 89.50 | $35.00 | $466.00 |
| 11 | Box culvert removal (X5400005) | LF | 194 | $45.00 | $121.00 |
| 12 | Drop box no.1 (X5420201) | EACH | 1 | $15,600 | $10,500 |
| 13 | Drop box no.2 (X5420202) | EACH | 1 | $62,000 | $31,300 |
| 14 | Drop box no.3 (X5420203) | EACH | 1 | $7,400.00 | $5,800.00 |
| 15 | Drop box no.4 (X5420204) | EACH | 1 | $8,300.00 | $6,800.00 |
| 16 | Drop box no.5 (X5420205) | EACH | 1 | $17,000 | $11,900 |
| 17 | Drop box no.6 (X5420206) | EACH | 1 | $27,000 | $23,000 |
| 18 | Drop box no.7 (X5420207) | EACH | 1 | $26,000 | $21,000 |
| 19 | Drop box no.8 (X5420208) | EACH | 1 | $20,000 | $18,000 |
| 20 | Drop box no.9 (X5420209) | EACH | 1 | $13,640 | $15,300 |
| 21 | Travers pipe grate SP (X5429311) | LF | 897 | $100.00 | $205.00 |
| 22 | Temp storm sewer 15 (X550A615) | LF | 235 | $80.00 | $89.00 |
| 23 | Abandon EX culvert (X5509912) | EACH | 2 | $27,000 | $42,000 |
| 24 | Inlets TB W/SPL F&G (X6024502) | EACH | 1 | $5,800.00 | $2,400.00 |
| 25 | Fill exist wells (X6050220) | EACH | 1 | $5,276.73 | $2,200.00 |
| 26 | Linear delin panels 6 (X6350206) | EACH | 8 | $125.00 | $90.00 |
| 27 | Grdrail refl TY C SPL (X7820007) | EACH | 122 | $65.00 | $65.00 |
| 28 | Construction layout (Z0013798) | LS | 1 | $80,000 | $110,000 |
| 29 | Earth ditch berm (Z0019800) | EACH | 4 | $1,000.00 | $8,500.00 |
| 30 | Property markers (Z0025505) | EACH | 20 | $155.00 | $175.00 |
| 31 | Temp pavement (Z0062456) | SY | 5,724 | $77.00 | $41.99 |
| 32 | Settlement platforms (Z0065100) | EACH | 4 | $4,000.00 | $12,000 |
| 33 | Earth excavation (20200100) | CY | 306,050 | $17.00 | $14.65 |
| 34 | Rock excavation (20200200) | CY | 107,715 | $24.00 | $37.30 |
| 35 | Rem & disp uns matl (20201200) | CY | 10,793 | $10.00 | $29.30 |
| 36 | Trench backfill (20800150) | CY | 2,605 | $43.00 | $46.00 |
| 37 | Topsoil exc & plac (21101505) | CY | 32,395 | $13.00 | $28.00 |
| 38 | Topsoil F & P 6 (21101625) | SY | 31,003 | $4.00 | $6.60 |
| 39 | Explor trench 52 (21301052) | LF | 2,200 | $12.00 | $41.00 |
| 40 | Seeding CL 1A (25000110) | ACRE | 1 | $4,000.00 | $3,400.00 |
| 41 | Seeding CL 2A (25000210) | ACRE | 27.75 | $2,390.00 | $4,000.00 |
| 42 | Seeding CL 4 (25000310) | ACRE | 22.25 | $2,400.00 | $3,400.00 |
| 43 | Seeding CL 4B (25000314) | ACRE | 0.50 | $5,100.00 | $7,000.00 |
| 44 | Seeding CL 5B (25000324) | ACRE | 0.50 | $4,100.00 | $5,500.00 |
| 45 | Nitrogen fert nutr (25000400) | LB | 4,590 | $4.00 | $2.00 |
| 46 | Phosphorus fert nutr (25000500) | LB | 4,590 | $4.00 | $2.00 |
| 47 | Potassium fert nutr (25000600) | LB | 4,590 | $4.00 | $2.00 |
| 48 | Mowing (25000750) | ACRE | 28.75 | $315.00 | $600.00 |
| 49 | Mulch method 3 (25100125) | ACRE | 77.75 | $3,780.00 | $4,000.00 |
| 50 | Erosion contr blanket (25100630) | SY | 10,134 | $1.42 | $1.60 |
| 51 | Turf reinf mat (25100900) | SY | 17,041 | $8.00 | $9.00 |
| 52 | Temp eros contr seed (28000250) | LB | 4,999 | $6.00 | $3.00 |
| 53 | Temp ditch checks (28000305) | LF | 950 | $13.00 | $5.00 |
| 54 | Perimeter eros bar (28000400) | LF | 45,255 | $1.85 | $4.50 |
| 55 | Inlet & pipe protect (28000500) | EACH | 23 | $340.00 | $400.00 |
| 56 | Stone riprap CL A4 (28100107) | SY | 786 | $64.00 | $69.00 |
| 57 | Stone riprap CL A5 (28100109) | SY | 4,212 | $70.00 | $77.00 |
| 58 | Filter fabric (28200200) | SY | 4,998 | $2.50 | $6.00 |
| 59 | Agg subgrade impr 12 (30300112) | SY | 39,248 | $15.00 | $14.30 |
| 60 | Agg subgrade impr 18 (30300118) | SY | 37,834 | $22.00 | $21.45 |
| 61 | Agg subgrade impr 24 (30300124) | SY | 16,753 | $28.00 | $28.60 |
| 62 | Agg subgrade impr 27 (30300127) | SY | 1,195 | $32.00 | $32.18 |
| 63 | Agg subgrade impr 30 (30300130) | SY | 9,561 | $35.00 | $35.75 |
| 64 | Agg subgrade impr 36 (30300136) | SY | 547 | $42.00 | $42.91 |
| 65 | Sub gran mat C (31102000) | CY | 1,889 | $178.00 | $43.20 |
| 66 | Sub gran mat C 6 (31102300) | SY | 15,232 | $9.00 | $7.81 |
| 67 | Agg base cse B 8 (35102000) | SY | 4,287 | $11.00 | $9.54 |
| 68 | Aggregate-temp access (40201000) | TON | 240 | $30.00 | $28.00 |
| 69 | Bit matls PR CT (40600275) | LB | 267,219 | $0.80 | $1.00 |
| 70 | Bit matls tack CT (40600290) | LB | 32,477 | $0.65 | $0.10 |
| 71 | P bit matls tack CT (40600295) | LB | 34,069 | $0.65 | $0.10 |
| 72 | Long joint sealant (40600370) | LF | 65,516 | $3.12 | $4.11 |
| 73 | Matl transfer device (40600405) | TON | 39,301 | $4.95 | $4.99 |
| 74 | Temporary ramp (40600990) | SY | 100 | $48.00 | $7.00 |
| 75 | HMA SC IL-9.5FG C N50 (40604000) | TON | 4,199 | $84.00 | $92.30 |
| 76 | HMA pavt FD 6 3/4 (40701816) | SY | 6,339 | $38.00 | $35.30 |
| 77 | HMA pavt FD 9 1/2 (40701871) | SY | 69,369 | $51.00 | $49.48 |
| 78 | Incidental HMA surf (40800050) | TON | 1,013 | $155.00 | $122.00 |
| 79 | Pavement rem (44000100) | SY | 63,817 | $18.80 | $11.70 |
| 80 | Gutter rem (44000400) | LF | 342 | $5.00 | $6.00 |
| 81 | Comb curb gutter rem (44000500) | LF | 540 | $5.00 | $6.60 |
| 82 | Paved SHLD removal (44004250) | SY | 12,682 | $8.70 | $11.00 |
| 83 | CL D patch T1 4 (44201690) | SY | 150 | $205.00 | $54.40 |
| 84 | CL D patch T2 4 (44201692) | SY | 150 | $140.00 | $54.40 |
| 85 | CL D patch T3 4 (44201694) | SY | 150 | $100.00 | $54.40 |
| 86 | CL D patch T4 4 (44201696) | SY | 150 | $100.00 | $54.40 |
| 87 | Aggregate SHLDS A (48100100) | TON | 508 | $46.00 | $28.00 |
| 88 | HMA shoulders 6 (48203021) | SY | 37,487 | $34.00 | $33.26 |
| 89 | Rem exist struct (50100100) | EACH | 1 | $195,000 | $96,000 |
| 90 | Rem exist struct N1 (50100300) | EACH | 1 | $6,400.00 | $14,500 |
| 91 | Rem exist struct N2 (50100400) | EACH | 1 | $12,750 | $11,500 |
| 92 | Rem exist struct N3 (50100500) | EACH | 1 | $12,750 | $12,000 |
| 93 | Rem exist struct N4 (50100600) | EACH | 1 | $12,750 | $11,500 |
| 94 | Rem exist struct N5 (50100700) | EACH | 1 | $8,500.00 | $2,500.00 |
| 95 | Rem exist struct N6 (50100800) | EACH | 1 | $8,500.00 | $11,500 |
| 96 | Rem exist struct N7 (50100900) | EACH | 1 | $8,500.00 | $11,500 |
| 97 | Rem exist struct N8 (50101000) | EACH | 1 | $12,750 | $12,500 |
| 98 | Rem exist struct N9 (50101100) | EACH | 1 | $10,600 | $14,000 |
| 99 | Rem exist struct N10 (50101200) | EACH | 1 | $12,750 | $17,500 |
| 100 | Rem exist struct N11 (50101300) | EACH | 1 | $4,300.00 | $3,000.00 |
| 101 | Conc headwall removal (50104400) | EACH | 1 | $1,600.00 | $1,000.00 |
| 102 | Pipe culvert remov (50105220) | LF | 301 | $18.00 | $16.00 |
| 103 | Structure excavation (50200100) | CY | 220 | $28.00 | $66.00 |
| 104 | Rock exc struct (50200400) | CY | 411 | $50.00 | $88.30 |
| 105 | Floor drains (50300100) | EACH | 8 | $650.00 | $1,350.00 |
| 106 | Conc struct (50300225) | CY | 190.60 | $1,350.00 | $1,260.00 |
| 107 | Conc sup-STR (50300255) | CY | 342.10 | $1,700.00 | $1,460.00 |
| 108 | BR deck grooving (50300260) | SY | 1,106 | $10.00 | $24.00 |
| 109 | Protective coat (50300300) | SY | 1,380 | $2.80 | $5.00 |
| 110 | Conc supstr app slab (50301350) | CY | 119.10 | $600.00 | $966.00 |
| 111 | F & E P P con I-BM 48 (50401005) | LF | 1,193 | $680.00 | $645.00 |
| 112 | Reinforcement bars (50800105) | LB | 13,000 | $4.00 | $2.44 |
| 113 | Reinf bars, epoxy CTD (50800205) | LB | 165,460 | $2.00 | $2.47 |
| 114 | Fur STL pile HP14X73 (51201800) | LF | 460 | $71.00 | $121.00 |
| 115 | Driving piles (51202305) | LF | 460 | $0.10 | $5.00 |
| 116 | Test pile ST HP14X73 (51203800) | EACH | 2 | $8,500.00 | $9,200.00 |
| 117 | Pile shoes (51204650) | EACH | 12 | $175.00 | $300.00 |
| 118 | Name plates (51500100) | EACH | 1 | $600.00 | $1,650.00 |
| 119 | Drilled shaft in soil (51603000) | CY | 33.10 | $1,025.00 | $900.00 |
| 120 | Drilled shaft in rock (51604000) | CY | 21.40 | $2,600.00 | $2,210.00 |
| 121 | Temp soil reten systm (52200020) | SF | 9,631 | $80.00 | $63.00 |
| 122 | Expan bolts 3/4 (54002020) | EACH | 18 | $75.00 | $90.00 |
| 123 | P cul CL A 1 24 (542A0229) | LF | 110 | $140.00 | $88.00 |
| 124 | P cul CL A 2 24 (542A1069) | LF | 145 | $97.00 | $91.00 |
| 125 | P cul CL A 2 30 (542A1075) | LF | 156 | $160.00 | $104.00 |
| 126 | P cul CL A 2 36 (542A1081) | LF | 215 | $165.00 | $117.00 |
| 127 | P cul CL A 2 48 (542A1093) | LF | 177 | $300.00 | $171.00 |
| 128 | P cul CL A 2 60 (542A1105) | LF | 140 | $400.00 | $277.00 |
| 129 | P cul CL A 3 48 (542A1933) | LF | 158 | $360.00 | $171.00 |
| 130 | P cul CL A 6 60 (542A4045) | LF | 160 | $600.00 | $314.00 |
| 131 | P cul CL A 6 84 (542A4069) | LF | 429 | $930.00 | $777.00 |
| 132 | P cul CL A 1 eqrs 30 (542A5485) | LF | 109 | $200.00 | $139.00 |
| 133 | P cul CL D 1 15 (542D0220) | LF | 119 | $80.00 | $59.00 |
| 134 | P cul CL D 1 18 (542D0223) | LF | 132 | $82.00 | $66.00 |
| 135 | P cul CL D 1 36 (542D0241) | LF | 102 | $170.00 | $148.00 |
| 136 | P cul CL D 2 15 (542D1060) | LF | 736 | $82.00 | $60.00 |
| 137 | P cul CL D 2 18 (542D1063) | LF | 62 | $90.00 | $65.00 |
| 138 | P cul CL D 2 36 (542D1081) | LF | 63 | $135.00 | $92.00 |
| 139 | P cul CL D 3 36 (542D1921) | LF | 128 | $140.00 | $104.00 |
| 140 | PRC flar end sec 60 (54213705) | EACH | 1 | $8,150.00 | $7,800.00 |
| 141 | Cip RC end sec 24 (54215424) | EACH | 1 | $18,900 | $7,840.00 |
| 142 | Cip RC end sec 48 (54215448) | EACH | 1 | $31,500 | $21,000 |
| 143 | Cip RC end sec 84 (54215484) | EACH | 2 | $45,000 | $44,000 |
| 144 | P cul CL A 2 24 temp (5422A024) | LF | 90 | $110.00 | $126.00 |
| 145 | Concrete collar (54248510) | CY | 2.80 | $1,300.00 | $685.00 |
| 146 | TRVRS pipe GRT con ES (54260315) | LF | 464 | $208.00 | $230.00 |
| 147 | Slop met ES 15", 1:6 (54260515) | EACH | 24 | $580.00 | $1,010.00 |
| 148 | Slop met ES 18", 1:6 (54260518) | EACH | 6 | $1,000.00 | $1,550.00 |
| 149 | SLP MT ES WG 36",1:6 (54260736) | EACH | 2 | $5,100.00 | $6,600.00 |
| 150 | Conc ES 542001 24 1:4 (54261424) | EACH | 3 | $5,580.00 | $4,400.00 |
| 151 | Conc ES 542001 30 1:4 (54261430) | EACH | 1 | $8,880.00 | $7,000.00 |
| 152 | Conc ES 542001 36 1:4 (54261436) | EACH | 6 | $10,000 | $8,500.00 |
| 153 | Conc ES 542001 48 1:4 (54261448) | EACH | 1 | $18,500 | $13,400 |
| 154 | Conc ES 542001 60 1:4 (54261460) | EACH | 3 | $24,200 | $17,500 |
| 155 | Conc ES 542001 18 1:6 (54261618) | EACH | 2 | $5,550.00 | $4,800.00 |
| 156 | Conc ES 542001 30 1:6 (54261630) | EACH | 2 | $11,500 | $9,400.00 |
| 157 | Conc ES 542001 36 1:6 (54261636) | EACH | 4 | $14,000 | $12,600 |
| 158 | Conc ES 542001 48 1:6 (54261648) | EACH | 1 | $26,000 | $19,100 |
| 159 | Conc ES 542011 30 1:4 (54263430) | EACH | 4 | $9,300.00 | $8,200.00 |
| 160 | Granular backfill STR (58600101) | CY | 220 | $51.00 | $48.00 |
| 161 | Geocomposite wall DR (59100100) | SY | 99 | $22.00 | $33.00 |
| 162 | Conc HDWL for P drain (60100060) | EACH | 201 | $700.00 | $499.00 |
| 163 | Pipe drains 8 (60100925) | LF | 50 | $60.00 | $46.30 |
| 164 | Pipe underdrain 4 SP (60108100) | LF | 4,212 | $19.00 | $29.00 |
| 165 | Pipe underdr T 2 4 (60108204) | LF | 46,963 | $18.50 | $16.30 |
| 166 | P undr for struct 4 (60146304) | LF | 175 | $30.00 | $28.00 |
| 167 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $5,050.00 | $4,960.00 |
| 168 | Class SI conc outlet (60600095) | CY | 7.60 | $2,100.00 | $1,230.00 |
| 169 | Conc curb TB (60600605) | LF | 60 | $72.00 | $146.00 |
| 170 | Comb CC&G TY B-6.24 (60605000) | LF | 440 | $64.00 | $81.00 |
| 171 | Box cul to BE cleaned (60905305) | LF | 160 | $135.00 | $135.00 |
| 172 | Pipe culv cleaned 60 (60920060) | LF | 68 | $125.00 | $94.00 |
| 173 | Misc concrete (61100605) | CY | 5 | $1,450.00 | $1,710.00 |
| 174 | Storm sew prot A 12 (61101013) | LF | 240 | $100.00 | $188.00 |
| 175 | FLD tile jun vault 3D (61133200) | EACH | 17 | $2,630.00 | $1,750.00 |
| 176 | SPBGR TY A 9FT posts (63000003) | LF | 363 | $38.50 | $48.00 |
| 177 | Traf bar term T6 (63100085) | EACH | 4 | $3,350.00 | $4,400.00 |
| 178 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,875.00 | $4,000.00 |
| 179 | Guardrail remov (63200310) | LF | 4,051 | $5.00 | $9.00 |
| 180 | Delineators (63500105) | EACH | 217 | $75.00 | $80.00 |
| 181 | Fur erect row markers (66600105) | EACH | 226 | $190.00 | $200.00 |
| 182 | Perm surv MKRS T2 (66700305) | EACH | 3 | $3,500.00 | $3,900.00 |
| 183 | Non SPL waste disposl (66900200) | CY | 45 | $150.00 | $151.00 |
| 184 | Soil disposal analy (66900530) | EACH | 1 | $1,450.00 | $1,750.00 |
| 185 | Reg sub P-const plan (66901001) | LS | 1 | $3,600.00 | $4,000.00 |
| 186 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 | $1,200.00 |
| 187 | Reg sub mon (66901006) | CAL DAY | 15 | $1,000.00 | $1,350.00 |
| 188 | Engr field office A (67000400) | CAL MO | 30 | $3,300.00 | $3,500.00 |
| 189 | Mobilization (67100100) | LS | 1 | $1,899,338 | $1,800,000 |
| 190 | Traf cont-prot 701321 (70100405) | EACH | 21 | $100.00 | $200.00 |
| 191 | Traf cont-prot 701201 (70100450) | LS | 1 | $72,000 | $130,000 |
| 192 | Traf cont-prot 701326 (70100500) | LS | 1 | $72,000 | $130,000 |
| 193 | TR cont surveillance (70103815) | CAL DAY | 180 | $350.00 | $790.00 |
| 194 | Temp BR traf signals (70106500) | EACH | 7 | $15,000 | $19,500 |
| 195 | SHRT TRM pavt MK rem (70300150) | SF | 9,367 | $0.75 | $1.00 |
| 196 | Temp PVT MK line 4 - paint (70300221) | LF | 19,205 | $0.40 | $0.49 |
| 197 | Temp PVT MK line 24 - paint (70300281) | LF | 37 | $4.00 | $6.00 |
| 198 | Temp PVT MK L4 T4 tape (70307120) | LF | 26,256 | $1.25 | $1.60 |
| 199 | Temp PVT MK L24 T4 tape (70307210) | LF | 115 | $7.50 | $9.00 |
| 200 | Temp conc barrier (70400100) | LF | 9,230 | $19.00 | $31.00 |
| 201 | Pin temp conc barrier (70400125) | EACH | 2,764 | $25.00 | $40.00 |
| 202 | Rel temp conc barrier (70400200) | LF | 16,861 | $28.00 | $19.00 |
| 203 | Temp SPBGR TY A (70500100) | LF | 2,163 | $38.50 | $16.00 |
| 204 | Temp TR bar term T1 (70500615) | EACH | 4 | $3,450.00 | $2,500.00 |
| 205 | Imp attn temp FRN TL3 (70600260) | EACH | 10 | $4,500.00 | $4,900.00 |
| 206 | Imp attn rel FRN TL3 (70600332) | EACH | 18 | $2,500.00 | $3,000.00 |
| 207 | Sign panel T1 (72000100) | SF | 431 | $31.00 | $36.00 |
| 208 | Sign panel T2 (72000200) | SF | 189 | $43.00 | $48.00 |
| 209 | Install EX sign panel (72300100) | SF | 203 | $21.00 | $26.00 |
| 210 | Remov sin pan assy TA (72400100) | EACH | 29 | $127.00 | $150.00 |
| 211 | Remov sin pan assy TB (72400200) | EACH | 31 | $127.00 | $150.00 |
| 212 | Object marker T1 (72500100) | EACH | 2 | $270.00 | $320.00 |
| 213 | Terminal marker - DA (72501000) | EACH | 8 | $425.00 | $50.00 |
| 214 | Teles STL sin support (72800100) | LF | 419 | $18.00 | $22.00 |
| 215 | Wood sin support (73000100) | LF | 711 | $32.00 | $35.00 |
| 216 | Mod ureth PM LTR-sym (78009000) | SF | 316 | $5.50 | $6.00 |
| 217 | Mod ureth PM line 4 (78009004) | LF | 101,341 | $0.77 | $0.75 |
| 218 | Mod ureth PM line 8 (78009008) | LF | 835 | $1.59 | $1.50 |
| 219 | Mod ureth PM line 12 (78009012) | LF | 774 | $2.38 | $2.05 |
| 220 | Mod ureth PM line 24 (78009024) | LF | 122 | $4.77 | $6.00 |
| 221 | GRV RCSD PM LTR & sym (78011000) | SF | 340 | $1.37 | $3.00 |
| 222 | GRV RCSD PVT MRKG 5 (78011025) | LF | 101,341 | $0.33 | $0.50 |
| 223 | GRV RCSD PVT MRKG 9 (78011045) | LF | 835 | $1.59 | $1.00 |
| 224 | GRV RCSD PVT MRKG 13 (78011065) | LF | 774 | $2.38 | $1.50 |
| 225 | GRV RCSD PVT MRKG 25 (78011125) | LF | 122 | $4.77 | $3.00 |
| 226 | PVT MKG rem WTR blast (78300202) | SF | 6,475 | $1.20 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.