IDOT contract 66K71 bid tabulation
Section (06-2HB-1)BR. Let by Illinois DOT on June 13, 2025, Bureau, District 03. 2 bids received; low bid $9,911,953 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 163
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $9,911,953 | Low |
| 2 | William Charles Construction Company, LLC | $12,035,000 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. William Charles Construction Company, LLC |
|---|---|---|---|---|---|
| 1 | SPLC HTC (gibraltar) (X2300004) | EACH | 2 | $1,375.00 | $1,250.00 |
| 2 | Remove exist riprap (X2810844) | SY | 20 | $50.00 | $25.00 |
| 3 | HMA stab 6IN at SPBGR (X4062952) | SY | 252 | $50.00 | $66.00 |
| 4 | Conc wearing surf 5 (X5030305) | SY | 431 | $130.00 | $175.00 |
| 5 | Prec bridge app slab (X5040100) | SF | 3,956 | $75.00 | $75.00 |
| 6 | Bar terminators (X5080530) | EACH | 848 | $40.00 | $7.50 |
| 7 | Plug exist culverts (X6050176) | EACH | 1 | $10,000 | $9,592.00 |
| 8 | Linear delin panels 4 (X6350204) | EACH | 8 | $209.00 | $190.00 |
| 9 | Linear delin panels 6 (X6350206) | EACH | 8 | $214.50 | $195.00 |
| 10 | Rem imp atten SO (X6430130) | EACH | 2 | $1,500.00 | $3,900.00 |
| 11 | Rem atten base (X6431110) | EACH | 2 | $1,000.00 | $2,000.00 |
| 12 | Rem reins HTC med bar (X6440112) | LF | 700 | $27.50 | $25.00 |
| 13 | Rem HTC med bar term (X6440116) | EACH | 2 | $4,185.50 | $3,805.00 |
| 14 | Wov W fence rem & RPL (X6650208) | LF | 203 | $52.80 | $48.00 |
| 15 | Traf cont & prot SPL (X7010216) | LS | 1 | $248,000 | $11,500 |
| 16 | Temp info signing (X7200061) | SF | 84 | $35.00 | $35.00 |
| 17 | Alternate rte signing (X7200202) | LS | 1 | $35,000 | $17,250 |
| 18 | Sign removal (X7240300) | EACH | 19 | $660.00 | $600.00 |
| 19 | Construction layout (Z0013798) | LS | 1 | $50,000 | $75,000 |
| 20 | Temp pavement (Z0062456) | SY | 1,166 | $68.00 | $125.00 |
| 21 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 22 | Tree remov 6-15 (20100110) | UNIT | 1,025 | $12.10 | $11.00 |
| 23 | Tree remov over 15 (20100210) | UNIT | 339 | $23.10 | $21.00 |
| 24 | Earth excavation (20200100) | CY | 2,910 | $30.00 | $21.74 |
| 25 | Furnished excavation (20400800) | CY | 16,890 | $33.00 | $33.89 |
| 26 | Trench backfill (20800150) | CY | 80 | $60.00 | $125.00 |
| 27 | Seeding CL 2A (25000210) | ACRE | 4.75 | $1,100.00 | $4.75 |
| 28 | Nitrogen fert nutr (25000400) | LB | 429 | $1.10 | $2.00 |
| 29 | Phosphorus fert nutr (25000500) | LB | 429 | $1.10 | $2.00 |
| 30 | Potassium fert nutr (25000600) | LB | 429 | $1.10 | $2.00 |
| 31 | Mulch method 2 (25100115) | ACRE | 5 | $1,100.00 | $2,000.00 |
| 32 | HD eros contr blanket (25100635) | SY | 23,440 | $1.87 | $1.75 |
| 33 | Temp eros contr seed (28000250) | LB | 491 | $11.00 | $3.25 |
| 34 | Temp ditch checks (28000305) | LF | 245 | $16.50 | $10.00 |
| 35 | Perimeter eros bar (28000400) | LF | 3,134 | $3.58 | $2.25 |
| 36 | Stone riprap CL A4 (28100107) | SY | 4 | $200.00 | $250.00 |
| 37 | Filter fabric (28200200) | SY | 4 | $20.00 | $25.00 |
| 38 | Sub gran mat A 12 (31100910) | SY | 2,512 | $26.00 | $22.31 |
| 39 | Sub gran mat C (31102000) | CY | 9 | $80.00 | $85.00 |
| 40 | Stab subbase 4 (31200100) | SY | 2,512 | $28.00 | $45.50 |
| 41 | Agg base cse B 4 (35101600) | SY | 1,166 | $12.00 | $14.66 |
| 42 | Bit matls PR CT (40600275) | LB | 5,652 | $0.01 | $1.40 |
| 43 | Bit matls tack CT (40600290) | LB | 4,370 | $0.01 | $2.15 |
| 44 | Long joint sealant (40600370) | LF | 525 | $24.00 | $22.00 |
| 45 | Temporary ramp (40600990) | SY | 165 | $0.01 | $45.00 |
| 46 | HMA BC IL-9.5FG N70 (40602970) | TON | 70 | $110.00 | $225.00 |
| 47 | HMA BC IL-19.0 N50 (40603080) | TON | 872 | $120.00 | $156.00 |
| 48 | HMA BC IL-19.0 N70 (40603085) | TON | 725 | $120.00 | $178.00 |
| 49 | HMA SC IL-9.5 C N50 (40604050) | TON | 305 | $140.00 | $200.00 |
| 50 | HMA SC IL-9.5 D N70 (40604062) | TON | 181 | $140.00 | $232.00 |
| 51 | P SC SMA 12.5 E N80 (40605034) | TON | 115 | $200.00 | $436.00 |
| 52 | Incidental HMA surf (40800050) | TON | 105 | $140.00 | $328.00 |
| 53 | PVT con PCC BR app SL (42000080) | SY | 278 | $250.00 | $275.00 |
| 54 | PCC PVT 9 jointed (42000401) | SY | 2,123 | $90.00 | $130.00 |
| 55 | Protective coat (42001300) | SY | 2,123 | $1.00 | $3.50 |
| 56 | Pavement rem (44000100) | SY | 2,413 | $12.00 | $16.05 |
| 57 | HMA surf rem 2 (44000157) | SY | 2,418 | $4.50 | $12.00 |
| 58 | Paved SHLD removal (44004250) | SY | 4,688 | $10.00 | $15.31 |
| 59 | Aggregate SHLDS B (48101200) | TON | 95 | $60.00 | $60.00 |
| 60 | Agg wedge SHLD type B (48102100) | TON | 23 | $60.00 | $60.00 |
| 61 | HMA shoulders 6 (48203021) | SY | 369 | $47.00 | $56.35 |
| 62 | HMA shoulders 8 (48203029) | SY | 2,350 | $50.00 | $75.00 |
| 63 | Rem exist struct (50100100) | EACH | 1 | $225,000 | $500,000 |
| 64 | Conc headwall removal (50104400) | EACH | 2 | $500.00 | $1,221.00 |
| 65 | Protective shield (50157300) | SY | 803 | $85.00 | $40.00 |
| 66 | Structure excavation (50200100) | CY | 681 | $30.00 | $45.00 |
| 67 | Conc struct (50300225) | CY | 310 | $1,200.00 | $1,525.00 |
| 68 | Conc sup-STR (50300255) | CY | 647 | $1,500.00 | $1,750.00 |
| 69 | BR deck grooving (50300260) | SY | 2,648 | $8.10 | $11.50 |
| 70 | Protective coat (50300300) | SY | 2,930 | $1.00 | $4.00 |
| 71 | F & E struct steel (50500105) | LS | 1 | $2,400,000 | $2,940,764 |
| 72 | Stud shear connectors (50500505) | EACH | 7,155 | $5.00 | $6.00 |
| 73 | Reinf bars, epoxy CTD (50800205) | LB | 222,600 | $2.10 | $2.25 |
| 74 | Bar splicers (50800515) | EACH | 1,193 | $40.00 | $60.00 |
| 75 | Slope wall 4 (51100100) | SY | 1,005 | $100.00 | $225.00 |
| 76 | Fur M S pile 16X0.375 (51200963) | LF | 1,901 | $130.00 | $140.00 |
| 77 | Driving piles (51202305) | LF | 1,901 | $0.01 | $0.01 |
| 78 | Test pile met shells (51203200) | EACH | 2 | $7,500.00 | $8,000.00 |
| 79 | Pile shoes (51204650) | EACH | 48 | $200.00 | $500.00 |
| 80 | Name plates (51500100) | EACH | 1 | $1,500.00 | $1,000.00 |
| 81 | Pref JT strip seal (52000110) | LF | 131 | $230.00 | $325.00 |
| 82 | Anchor bolts 1 (52100520) | EACH | 36 | $100.00 | $150.00 |
| 83 | Anchor bolts 1 1/2 (52100540) | EACH | 18 | $125.00 | $175.00 |
| 84 | Temp soil reten systm (52200020) | SF | 3,486 | $50.00 | $20.00 |
| 85 | P cul CL A 2 eqrs 36 (542A8221) | LF | 108 | $261.00 | $574.42 |
| 86 | Conc ES 542011 36 1:3 (54263336) | EACH | 2 | $12,000 | $4,243.80 |
| 87 | Granular backfill STR (58600101) | CY | 372 | $50.00 | $125.00 |
| 88 | Geocomposite wall DR (59100100) | SY | 130 | $35.00 | $64.50 |
| 89 | P undr for struct 4 (60146304) | LF | 219 | $25.00 | $50.00 |
| 90 | SPBGR TY A 6FT posts (63000001) | LF | 200 | $41.80 | $38.00 |
| 91 | Traf bar term T6 (63100085) | EACH | 4 | $5,346.00 | $4,860.00 |
| 92 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $4,125.00 | $3,750.00 |
| 93 | Guardrail remov (63200310) | LF | 592 | $6.60 | $6.00 |
| 94 | Delineators (63500105) | EACH | 4 | $220.00 | $200.00 |
| 95 | Shoulder rum strip 16 (64200116) | LF | 3,200 | $1.50 | $1.25 |
| 96 | Imp atten NRD TL3 (64300450) | EACH | 2 | $10,000 | $10,200 |
| 97 | Attenuator base (64301090) | SY | 48 | $55.00 | $350.00 |
| 98 | HT CBL median barrier (64401100) | LF | 700 | $34.10 | $31.00 |
| 99 | HT CBL med bar term (64401300) | EACH | 2 | $8,910.00 | $8,100.00 |
| 100 | Perm surv MKRS T1 (66700205) | EACH | 1 | $2,250.00 | $1,750.00 |
| 101 | Non SPL waste disposl (66900200) | CY | 407 | $85.00 | $127.39 |
| 102 | Soil disposal analy (66900530) | EACH | 1 | $1,925.00 | $2,000.00 |
| 103 | Reg sub P-const plan (66901001) | LS | 1 | $2,475.00 | $4,600.00 |
| 104 | Reg sub F con report (66901003) | LS | 1 | $2,475.00 | $1,300.00 |
| 105 | Reg sub mon (66901006) | CAL DAY | 16 | $1,045.00 | $1,400.00 |
| 106 | Engr field office A (67000400) | CAL MO | 18 | $4,000.00 | $3,000.00 |
| 107 | Mobilization (67100100) | LS | 1 | $557,000 | $734,880 |
| 108 | Traf cont-prot 701401 (70100205) | EACH | 2 | $0.01 | $50,000 |
| 109 | Traf cont-prot 701402 (70100207) | EACH | 2 | $0.01 | $12,500 |
| 110 | Traf cont-prot 701321 (70100405) | EACH | 2 | $0.01 | $21,750 |
| 111 | Traf cont-prot 701411 (70100420) | EACH | 2 | $0.01 | $1,750.00 |
| 112 | Traf cont-prot 701306 (70100460) | LS | 1 | $0.01 | $112,900 |
| 113 | TR cont surveillance (70103815) | CAL DAY | 140 | $0.01 | $100.00 |
| 114 | Temp BR traf signals (70106500) | EACH | 1 | $75,000 | $90,000 |
| 115 | Temp rumble strips (70106700) | EACH | 60 | $1,200.00 | $2,150.00 |
| 116 | Changeable message SN (70107025) | CAL DAY | 560 | $40.00 | $40.00 |
| 117 | Night work zone light (70200100) | LS | 1 | $10,000 | $15,000 |
| 118 | Short term pavt mking (70300100) | LF | 750 | $4.00 | $5.00 |
| 119 | SHRT TRM pavt MK rem (70300150) | SF | 379 | $2.00 | $3.00 |
| 120 | Temp conc barrier (70400100) | LF | 3,375 | $30.00 | $70.00 |
| 121 | Pin temp conc barrier (70400125) | EACH | 624 | $15.00 | $30.00 |
| 122 | Rel temp conc barrier (70400200) | LF | 1,475 | $15.00 | $6.00 |
| 123 | Temp SPBGR TY A (70500100) | LF | 750 | $31.90 | $29.00 |
| 124 | Temp TR bar term T1 (70500615) | EACH | 2 | $4,510.00 | $4,100.00 |
| 125 | Imp attn temp NRD TL3 (70600250) | EACH | 6 | $6,000.00 | $6,000.00 |
| 126 | Imp attn rel NRD TL3 (70600350) | EACH | 6 | $2,500.00 | $1,700.00 |
| 127 | Sign panel T1 (72000100) | SF | 92 | $39.60 | $36.00 |
| 128 | Sign panel T3 (72000300) | SF | 101 | $53.90 | $49.00 |
| 129 | Remov sin pan assy TA (72400100) | EACH | 19 | $275.00 | $250.00 |
| 130 | Remov sign panel T3 (72400330) | SF | 81 | $19.80 | $18.00 |
| 131 | Terminal marker - DA (72501000) | EACH | 4 | $55.00 | $50.00 |
| 132 | STR STL sin sup BA (72700100) | LB | 1,760 | $9.90 | $9.00 |
| 133 | Teles STL sin support (72800100) | LF | 48 | $35.20 | $32.00 |
| 134 | Wood sin support (73000100) | LF | 127 | $41.80 | $38.00 |
| 135 | Conc foundation (73400100) | CY | 4 | $4,048.00 | $3,680.00 |
| 136 | Rem GR MT sin support (73700100) | EACH | 2 | $385.00 | $350.00 |
| 137 | Rem conc FDN-GR MT (73700200) | EACH | 2 | $973.50 | $885.00 |
| 138 | Pref PL PM TD STD LTR/sym (78004600) | SF | 32 | $70.40 | $64.00 |
| 139 | Pref PL PM TD STD L24 (78004720) | LF | 27 | $115.50 | $105.00 |
| 140 | Mod ureth PM line 4 (78009004) | LF | 14,776 | $0.99 | $0.90 |
| 141 | Mod ureth PM line 8 (78009008) | LF | 240 | $2.15 | $1.95 |
| 142 | Mod ureth PM line 12 (78009012) | LF | 1,232 | $4.62 | $4.20 |
| 143 | GRV RCSD PM LTR & sym (78011000) | SF | 32 | $3.03 | $2.75 |
| 144 | GRV RCSD PVT MRKG 5 (78011025) | LF | 7,388 | $0.94 | $0.85 |
| 145 | GRV RCSD PVT MRKG 9 (78011045) | LF | 120 | $1.27 | $1.15 |
| 146 | GRV RCSD PVT MRKG 13 (78011065) | LF | 410 | $3.30 | $3.00 |
| 147 | GRV RCSD PVT MRKG 25 (78011125) | LF | 27 | $3.69 | $3.35 |
| 148 | Raised refl pavt MKR (78100100) | EACH | 44 | $159.50 | $145.00 |
| 149 | Grdrail ref type B (78200006) | EACH | 16 | $22.00 | $20.00 |
| 150 | HT CBL med bar ref (78200021) | EACH | 9 | $27.50 | $25.00 |
| 151 | Raised ref PVT MK rem (78300200) | EACH | 44 | $15.00 | $70.00 |
| 152 | Undrgrd C CNC 2 (81028750) | LF | 358 | $30.31 | $27.55 |
| 153 | Undrgrd C CNC 4 (81028790) | LF | 383 | $47.72 | $43.38 |
| 154 | UD 2#4 #6G xlpuse 1 (81603030) | LF | 9,910 | $8.87 | $8.06 |
| 155 | UD 2#2#6G xlpuse 1.5P (81603038) | LF | 2,959 | $11.65 | $10.59 |
| 156 | Lum LED rdwy G (82110007) | EACH | 58 | $978.59 | $889.63 |
| 157 | LT P A 45MH 15MA (83009600) | EACH | 44 | $6,292.66 | $5,300.13 |
| 158 | LT P A 45MH 15MA-TW (83009601) | EACH | 7 | $6,669.42 | $6,063.11 |
| 159 | LP F M 11.5BC 8 5/8X6 (83600352) | EACH | 51 | $1,454.87 | $1,322.61 |
| 160 | Bkwy dev cou SS SCRN (83800650) | EACH | 204 | $201.12 | $182.84 |
| 161 | Rem LT TWR no sal (84200605) | EACH | 4 | $4,775.52 | $4,341.38 |
| 162 | Rem pole FDN (84200804) | EACH | 4 | $2,706.00 | $4,000.00 |
| 163 | Rem elcbl FR con (89502300) | LF | 403 | $3.44 | $3.13 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.