IDOT contract 72G90 bid tabulation
Section (2RS-5;2Z,RS-3)SW,DR. Let by Illinois DOT on January 16, 2026, Christian, District 06. 1 bid received; low bid $10,566,462 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 153
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $10,566,462 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | R R FL beacon A comp (X1400326) | EACH | 2 | $21,973 |
| 2 | Grading & shap SHLDRS (X2020110) | UNIT | 58 | $312.12 |
| 3 | Furnished excav SPL (X2040805) | CY | 170 | $166.07 |
| 4 | Temp access- priv ent (X4021000) | EACH | 3 | $2,080.03 |
| 5 | Temp access- com ent (X4022000) | EACH | 1 | $2,711.55 |
| 6 | HMA surf rem var DP (X4401198) | SY | 1,383 | $17.37 |
| 7 | Conc median surf rem (X4402020) | SF | 222 | $7.66 |
| 8 | Part dep rem T2 6 (X4406260) | SY | 79 | $184.74 |
| 9 | Part dep rem T4 6 (X4406660) | SY | 147 | $99.28 |
| 10 | Part depth patch SPL (X4421002) | SY | 227 | $192.75 |
| 11 | Remov EX flar end sec (X5427602) | EACH | 1 | $308.00 |
| 12 | Traf cont & prot SPL (X7010216) | LS | 1 | $171,530 |
| 13 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $38,469 |
| 14 | Width restrict sign (X7200201) | LS | 1 | $4,840.00 |
| 15 | Detour signing (X7200203) | LS | 1 | $29,445 |
| 16 | Construction layout (Z0013798) | LS | 1 | $93,544 |
| 17 | Dust control watering (Z0019600) | UNIT | 2 | $5,511.99 |
| 18 | RR prot liability ins (Z0048665) | LS | 1 | $7,956.37 |
| 19 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 |
| 20 | Tree remov 6-15 (20100110) | UNIT | 40 | $55.00 |
| 21 | Tree remov over 15 (20100210) | UNIT | 484 | $99.00 |
| 22 | Tree remov acres (20100500) | ACRE | 0.10 | $55,000 |
| 23 | Temporary fence (20101000) | LF | 430 | $31.42 |
| 24 | Earth excavation (20200100) | CY | 5,014 | $84.27 |
| 25 | Exc & GR EX shoulder (20200600) | UNIT | 58 | $424.09 |
| 26 | Trench backfill (20800150) | CY | 1,276 | $90.20 |
| 27 | Seeding CL 1A (25000110) | ACRE | 4.40 | $2,805.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 391 | $1.82 |
| 29 | Phosphorus fert nutr (25000500) | LB | 391 | $1.82 |
| 30 | Potassium fert nutr (25000600) | LB | 391 | $1.82 |
| 31 | Agr ground limestone (25000700) | TON | 8.80 | $385.00 |
| 32 | Mowing (25000750) | ACRE | 6 | $443.16 |
| 33 | Mulch method 3 (25100125) | ACRE | 4.40 | $4,565.00 |
| 34 | Temp eros contr seed (28000250) | LB | 867 | $7.81 |
| 35 | Temp ditch checks (28000305) | LF | 50 | $32.29 |
| 36 | Perimeter eros bar (28000400) | LF | 156 | $10.15 |
| 37 | Inlet & pipe protect (28000500) | EACH | 16 | $34.10 |
| 38 | Filter fabric (28200200) | SY | 17,260 | $7.75 |
| 39 | Sub gran mat B 8 (31101600) | SY | 17,260 | $27.50 |
| 40 | HMA base cse 7 (35501312) | SY | 13,942 | $72.98 |
| 41 | Preparation of base (35800100) | SY | 2,925 | $7.52 |
| 42 | Agg base repair (35800200) | TON | 234 | $156.44 |
| 43 | Agg surf course TY B (40200800) | TON | 4 | $142.06 |
| 44 | Bit matls tack CT (40600290) | LB | 52,686 | $1.17 |
| 45 | Long joint sealant (40600370) | LF | 10,024 | $3.43 |
| 46 | Matl transfer device (40600405) | TON | 2,924 | $3.58 |
| 47 | HMA surf rem butt JT (40600982) | SY | 142 | $12.48 |
| 48 | Temporary ramp (40600990) | SY | 524 | $16.07 |
| 49 | P HMA BC IL-9.5FG N50 (40603215) | TON | 812 | $170.35 |
| 50 | P HMA BC IL19.0 N50 (40603230) | TON | 3,763 | $185.83 |
| 51 | P HMA SC IL-9.5 C N50 (40604150) | TON | 2,941 | $183.03 |
| 52 | Bit matls tack CT (40800029) | LB | 399 | $1.16 |
| 53 | Incidental HMA surf (40800050) | TON | 308 | $334.38 |
| 54 | PCC driveway pavt 6 (42300200) | SY | 890 | $158.04 |
| 55 | PCC driveway pavt 8 (42300400) | SY | 1,121 | $187.66 |
| 56 | PC conc sidewalk 4 (42400100) | SF | 42,693 | $18.02 |
| 57 | Detectable warnings (42400800) | SF | 605 | $50.45 |
| 58 | Pavement rem (44000100) | SY | 13,801 | $37.24 |
| 59 | HMA surf rem 1 1/2 (44000155) | SY | 18,665 | $5.06 |
| 60 | HMA surf rem 2 3/4 (44000160) | SY | 3,286 | $7.89 |
| 61 | Drive pavement rem (44000200) | SY | 3,833 | $31.37 |
| 62 | Gutter rem (44000400) | LF | 30 | $38.41 |
| 63 | Comb curb gutter rem (44000500) | LF | 8,924 | $19.92 |
| 64 | Sidewalk rem (44000600) | SF | 8,689 | $8.90 |
| 65 | Paved SHLD removal (44004250) | SY | 1,719 | $14.27 |
| 66 | Pavt patch T4 12 (44200150) | SY | 65 | $315.08 |
| 67 | Pavt patch T2 13 (44200156) | SY | 12 | $319.48 |
| 68 | Pavt patch T1 14 (44200164) | SY | 4 | $432.78 |
| 69 | Pavt patch T2 14 (44200168) | SY | 180 | $319.48 |
| 70 | Pavt patch T3 14 (44200172) | SY | 132 | $317.28 |
| 71 | Pavt patch T4 14 (44200174) | SY | 53 | $315.08 |
| 72 | Pavt patch T2 17 (44200202) | SY | 12 | $393.18 |
| 73 | Agg wedge SHLD type B (48102100) | TON | 111 | $78.87 |
| 74 | HMA shoulders (48203100) | TON | 2,074 | $170.33 |
| 75 | Conc headwall removal (50104400) | EACH | 2 | $704.00 |
| 76 | Pipe culvert remov (50105220) | LF | 642 | $22.00 |
| 77 | P cul CL A 1 12 (542A0217) | LF | 29 | $138.60 |
| 78 | P cul CL A 1 15 (542A0220) | LF | 98 | $150.70 |
| 79 | P cul CL A 1 24 (542A0229) | LF | 42 | $166.10 |
| 80 | PRC flar end sec 12 (54213657) | EACH | 6 | $2,231.90 |
| 81 | PRC flar end sec 15 (54213660) | EACH | 4 | $2,453.00 |
| 82 | PRC flar end sec 24 (54213669) | EACH | 1 | $3,367.10 |
| 83 | PRC FL end S EQ RS 30 (54214515) | EACH | 2 | $3,655.30 |
| 84 | Storm sew CL A 2 12 (550A0340) | LF | 564 | $138.60 |
| 85 | Storm sew CL A 2 15 (550A0360) | LF | 446 | $150.70 |
| 86 | Storm sew CL A 2 18 (550A0380) | LF | 457 | $160.60 |
| 87 | SS CL A 2 eqrs 18 (550A4800) | LF | 1,916 | $178.20 |
| 88 | SS CL A 2 eqrs 30 (550A5100) | LF | 75 | $309.10 |
| 89 | Storm sewer rem 10 (55100400) | LF | 76 | $48.40 |
| 90 | Storm sewer rem 12 (55100500) | LF | 201 | $52.80 |
| 91 | Storm sewer rem 30 (55101400) | LF | 5 | $206.80 |
| 92 | Man TA 4 dia T1F CL (60218400) | EACH | 10 | $6,303.00 |
| 93 | Man TA 4 dia T5F CL (60218800) | EACH | 4 | $7,119.20 |
| 94 | Man TA 4 dia T3V F&G (60219570) | EACH | 3 | $6,523.00 |
| 95 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $8,312.70 |
| 96 | Man TA 6 dia T5F CL (60224000) | EACH | 1 | $11,063 |
| 97 | Inlets TA T3V F&G (60235705) | EACH | 17 | $4,265.80 |
| 98 | Inlets TA T8G (60236200) | EACH | 5 | $3,711.40 |
| 99 | Inlets TB T3V F&G (60240222) | EACH | 6 | $4,891.70 |
| 100 | Man adjust (60255500) | EACH | 16 | $1,635.34 |
| 101 | Man reconst (60257900) | EACH | 4 | $3,525.50 |
| 102 | Inlets adjust (60260100) | EACH | 10 | $1,034.16 |
| 103 | VV adjust (60265700) | EACH | 24 | $1,048.86 |
| 104 | Remov manholes (60500040) | EACH | 2 | $506.00 |
| 105 | Remov inlets (60500060) | EACH | 2 | $506.00 |
| 106 | Class SI conc outlet (60600095) | CY | 14 | $1,368.88 |
| 107 | Comb CC&G TB6.06 (60603500) | LF | 20 | $139.68 |
| 108 | Comb CC&G TB6.12 (60603800) | LF | 957 | $124.72 |
| 109 | Comb CC&G TB6.18 (60604400) | LF | 621 | $128.95 |
| 110 | Comb CC&G TY B-6.24 (60605000) | LF | 9,814 | $76.80 |
| 111 | Conc median surf 4 (60618300) | SF | 104 | $13.98 |
| 112 | Non SPL waste disposl (66900200) | CY | 90 | $353.33 |
| 113 | SPL waste disposal (66900205) | CY | 210 | $1,195.61 |
| 114 | Soil disposal analy (66900530) | EACH | 10 | $1,402.50 |
| 115 | Reg sub P-const plan (66901001) | LS | 1 | $2,420.00 |
| 116 | Reg sub F con report (66901003) | LS | 1 | $2,420.00 |
| 117 | Reg sub mon (66901006) | CAL DAY | 8 | $1,155.00 |
| 118 | Engr field office A (67000400) | CAL MO | 24 | $4,641.22 |
| 119 | Mobilization (67100100) | LS | 1 | $602,926 |
| 120 | Traf cont-prot 701306 (70100460) | LS | 1 | $16,828 |
| 121 | Traf cont-prot 701326 (70100500) | LS | 1 | $10,230 |
| 122 | TR cont & prot 701501 (70102620) | LS | 1 | $20,891 |
| 123 | TR cont & prot 701801 (70102640) | LS | 1 | $18,344 |
| 124 | TR cont surveillance (70103815) | CAL DAY | 14 | $1,582.80 |
| 125 | Changeable message SN (70107025) | CAL DAY | 1,388 | $68.20 |
| 126 | Short term pavt mking (70300100) | LF | 3,370 | $2.75 |
| 127 | SHRT TRM pavt MK rem (70300150) | SF | 1,123 | $6.12 |
| 128 | Sign panel T1 (72000100) | SF | 54 | $35.48 |
| 129 | Teles STL sin support (72800100) | LF | 104 | $29.15 |
| 130 | Mod ureth PM LTR-sym (78009000) | SF | 27 | $44.00 |
| 131 | Mod ureth PM line 5 (78009005) | LF | 14,165 | $1.21 |
| 132 | Mod ureth PM line 6 (78009006) | LF | 465 | $5.50 |
| 133 | Mod ureth PM line 8 (78009008) | LF | 132 | $7.70 |
| 134 | Mod ureth PM line 12 (78009012) | LF | 191 | $12.10 |
| 135 | Mod ureth PM line 24 (78009024) | LF | 68 | $38.50 |
| 136 | GRV RCSD PM LTR & sym (78011000) | SF | 27 | $16.50 |
| 137 | GRV RCSD PVT MRKG 6 (78011030) | LF | 14,165 | $0.77 |
| 138 | GRV RCSD PVT MRKG 7 (78011035) | LF | 465 | $2.75 |
| 139 | GRV RCSD PVT MRKG 9 (78011045) | LF | 132 | $5.50 |
| 140 | GRV RCSD PVT MRKG 13 (78011065) | LF | 191 | $6.60 |
| 141 | GRV RCSD PVT MRKG 25 (78011125) | LF | 68 | $7.70 |
| 142 | Raised refl pavt MKR (78100100) | EACH | 140 | $94.49 |
| 143 | Curb reflectors (78200020) | EACH | 6 | $5.50 |
| 144 | Raised ref PVT MK rem (78300200) | EACH | 140 | $17.55 |
| 145 | Elect serv install (80400100) | EACH | 1 | $5,445.00 |
| 146 | Undrgrd C CNC 2 (81028750) | LF | 55 | $46.59 |
| 147 | UD 2#10#10GXLPUSE 3/4 (81603010) | LF | 150 | $15.73 |
| 148 | Lum LED rdwy G (82110007) | EACH | 1 | $907.50 |
| 149 | LT cont PM 240V 30 (82500300) | EACH | 2 | $8,470.00 |
| 150 | LT P A 30MH 15DA (83000600) | EACH | 2 | $6,171.00 |
| 151 | LP F M 15BC 8" X 6' (83600355) | EACH | 2 | $1,875.50 |
| 152 | Bkwy dev cou SS SCRN (83800650) | EACH | 8 | $170.92 |
| 153 | Conc FDN TY A (87800100) | LF | 7 | $468.88 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.