IDOT contract 78786 bid tabulation
Section 112(RS-4,BLP-1);112B-4. Let by Illinois DOT on June 13, 2025, Franklin, District 09. 2 bids received; low bid $20,462,811 by E. T. Simonds Construction Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 187
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E. T. Simonds Construction Company | $20,462,811 | Low |
| 2 | Samron Midwest Contracting, Inc. | $26,804,669 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E. T. Simonds Construction Company | 2. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Cros sonic log A duct (X0320051) | LF | 489 | $58.04 | $39.00 |
| 2 | Cros sonic log test (X0320052) | EACH | 8 | $1,792.75 | $3,000.00 |
| 3 | Traffic counter- tirtl system (X0320089) | EACH | 1 | $36,335 | $33,000 |
| 4 | Stone bedding mterial (X0326441) | TON | 16,897 | $35.97 | $41.00 |
| 5 | Solar-power FB as CMP (X0326899) | EACH | 2 | $17,216 | $15,000 |
| 6 | Grading & shaping SPL (X2020108) | SY | 1,696 | $17.05 | $10.00 |
| 7 | Remove exist riprap (X2810844) | SY | 5,391 | $15.83 | $42.00 |
| 8 | Coarse agr backfil SPL (X3110103) | TON | 56,950 | $40.90 | $45.50 |
| 9 | Agg surf cse B 6 (X4020500) | SY | 200 | $20.24 | $20.00 |
| 10 | Temp pavt removal (X4400110) | SY | 4,865 | $15.38 | $13.00 |
| 11 | Island removal (X4402805) | SF | 395 | $1.49 | $7.00 |
| 12 | Aggregate SHLDS SPL (X4811900) | TON | 2,706 | $38.41 | $65.00 |
| 13 | Bar terminators (X5080530) | EACH | 818 | $29.15 | $33.00 |
| 14 | Decorative STL rail (X5091300) | LF | 361 | $467.25 | $425.00 |
| 15 | Drainage scuppr DS-11 (X5230174) | EACH | 4 | $1,970.25 | $2,000.00 |
| 16 | Remov EX flar end sec (X5427602) | EACH | 4 | $590.17 | $911.00 |
| 17 | Pro SS conn to EX man (X5510011) | EACH | 1 | $5,250.00 | $3,400.00 |
| 18 | Traf cont & prot SPL (X7010216) | LS | 1 | $311,367 | $456,000 |
| 19 | Pavt breaking (Z0004638) | SY | 717 | $21.10 | $8.00 |
| 20 | Construction layout (Z0013798) | LS | 1 | $105,327 | $156,000 |
| 21 | Sed cont silt curtain (Z0023205) | LS | 1 | $250,414 | $350,000 |
| 22 | Temp pavement (Z0062456) | SY | 3,911 | $48.48 | $58.00 |
| 23 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 |
| 24 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 25 | Tree remov over 15 (20100210) | UNIT | 18 | $93.72 | $56.00 |
| 26 | Tree remov acres (20100500) | ACRE | 0.75 | $8,997.52 | $20,000 |
| 27 | Tree trunk protection (20101100) | EACH | 2 | $939.39 | $1,600.00 |
| 28 | Earth excavation (20200100) | CY | 14,438 | $12.82 | $30.00 |
| 29 | Rem & disp uns matl (20201200) | CY | 33,110 | $24.32 | $42.00 |
| 30 | Furnished excavation (20400800) | CY | 2,501 | $22.71 | $43.00 |
| 31 | Trench backfill (20800150) | CY | 92.60 | $67.14 | $47.00 |
| 32 | Geotech fab F/GR stab (21001000) | SY | 10,368 | $4.25 | $3.00 |
| 33 | Seeding CL 2 (25000200) | ACRE | 3.63 | $2,572.50 | $2,800.00 |
| 34 | Seeding CL 5 (25000320) | ACRE | 1.75 | $4,987.50 | $5,500.00 |
| 35 | Seeding CL 7 (25000350) | ACRE | 3.63 | $813.75 | $900.00 |
| 36 | Nitrogen fert nutr (25000400) | LB | 329 | $1.73 | $2.00 |
| 37 | Phosphorus fert nutr (25000500) | LB | 329 | $1.73 | $2.00 |
| 38 | Potassium fert nutr (25000600) | LB | 329 | $1.73 | $2.00 |
| 39 | Agr ground limestone (25000700) | TON | 6.50 | $367.50 | $400.00 |
| 40 | Mulch method 2 (25100115) | ACRE | 4.38 | $1,076.25 | $1,200.00 |
| 41 | Erosion contr blanket (25100630) | SY | 17,451 | $1.84 | $2.00 |
| 42 | Temp eros contr seed (28000250) | LB | 1,558 | $0.01 | $3.00 |
| 43 | Temp ditch checks (28000305) | LF | 182 | $12.64 | $17.00 |
| 44 | Perimeter eros bar (28000400) | LF | 4,071 | $4.71 | $3.00 |
| 45 | Inlet & pipe protect (28000500) | EACH | 7 | $281.82 | $255.00 |
| 46 | Stone riprap CL A3 (28100105) | SY | 111 | $69.41 | $23.00 |
| 47 | Stone riprap CL A4 (28100107) | SY | 94 | $65.30 | $43.00 |
| 48 | Stone riprap CL A3 (28100205) | TON | 27,502 | $40.79 | $48.00 |
| 49 | Stone riprap CL A5 (28100209) | TON | 22,348 | $43.73 | $50.00 |
| 50 | Filter fabric (28200200) | SY | 1,931 | $4.64 | $2.00 |
| 51 | Agg subgrade improve (30300011) | TON | 3,733 | $39.52 | $36.00 |
| 52 | Sub gran mat C (31101900) | TON | 399 | $52.64 | $63.00 |
| 53 | Agg base cse A (35100100) | TON | 7,002 | $35.77 | $40.00 |
| 54 | Agg base cse B 4 (35101600) | SY | 17,708 | $8.75 | $7.00 |
| 55 | Agg base cse B 6 (35101800) | SY | 10,552 | $14.91 | $18.00 |
| 56 | Bit matls PR CT (40600275) | LB | 6,256 | $0.01 | $0.01 |
| 57 | Bit matls tack CT (40600290) | LB | 32,756 | $0.01 | $0.01 |
| 58 | Long joint sealant (40600370) | LF | 11,597 | $5.16 | $5.00 |
| 59 | Matl transfer device (40600405) | TON | 8,164 | $4.09 | $3.00 |
| 60 | Temporary ramp (40600990) | SY | 829 | $25.62 | $20.00 |
| 61 | HMA BC IL-19.0 N70 (40603085) | TON | 3,871 | $87.72 | $95.00 |
| 62 | HMA SC IL-9.5 D N70 (40604062) | TON | 2,598 | $100.56 | $105.00 |
| 63 | HMA pavt FD 11 1/4 (40701906) | SY | 2,690 | $75.92 | $78.00 |
| 64 | Incidental HMA surf (40800050) | TON | 16 | $542.55 | $625.00 |
| 65 | PVT con HMA BR app SL (42000070) | SY | 145 | $0.01 | $1,500.00 |
| 66 | PC conc sidewalk 5 (42400200) | SF | 87,137 | $6.82 | $7.00 |
| 67 | Detectable warnings (42400800) | SF | 160 | $20.63 | $24.00 |
| 68 | Pavement rem (44000100) | SY | 1,913 | $16.84 | $20.00 |
| 69 | HMA surf rem 1 (44000153) | SY | 6,811 | $2.05 | $1.00 |
| 70 | HMA surf rem 1 1/2 (44000155) | SY | 301 | $13.09 | $1.50 |
| 71 | HMA surf rem 2 3/4 (44000160) | SY | 19,094 | $3.61 | $4.00 |
| 72 | HMA surf rem 3 3/4 (44000164) | SY | 14,552 | $3.74 | $5.00 |
| 73 | Drive pavement rem (44000200) | SY | 170 | $27.77 | $25.00 |
| 74 | Comb curb gutter rem (44000500) | LF | 85 | $25.83 | $17.00 |
| 75 | Paved ditch removal (44004000) | LF | 209 | $19.35 | $17.00 |
| 76 | Paved SHLD removal (44004250) | SY | 5,973 | $13.10 | $12.00 |
| 77 | CL C patch T1 15 (44201411) | SY | 15 | $215.00 | $225.00 |
| 78 | CL C patch T2 15 (44201415) | SY | 947 | $204.00 | $205.00 |
| 79 | CL C patch T3 15 (44201419) | SY | 142 | $192.00 | $205.00 |
| 80 | CL C patch T4 15 (44201421) | SY | 300 | $184.00 | $205.00 |
| 81 | Aggregate SHLDS B 10 (48101620) | SY | 1,279 | $28.51 | $25.00 |
| 82 | Agg wedge SHLD type B (48102100) | TON | 1,655 | $31.94 | $34.00 |
| 83 | HMA shoulders 8 (48203029) | SY | 12,298 | $41.35 | $53.00 |
| 84 | HMA shoulders (48203100) | TON | 1,434 | $100.65 | $115.00 |
| 85 | PCC shoulders 10 (48300500) | SY | 7,016 | $80.50 | $82.00 |
| 86 | Rem exist struct (50100100) | EACH | 1 | $272,417 | $2,000,000 |
| 87 | Conc headwall removal (50104400) | EACH | 3 | $490.96 | $700.00 |
| 88 | Pipe culvert remov (50105220) | LF | 113 | $20.80 | $19.00 |
| 89 | Protective shield (50157300) | SY | 748 | $117.97 | $140.00 |
| 90 | Structure excavation (50200100) | CY | 380 | $26.65 | $44.00 |
| 91 | Cofferdam excavation (50200300) | CY | 248 | $74.33 | $206.00 |
| 92 | Cofferdam typ 2 loc 1 (50201121) | EACH | 1 | $326,208 | $550,000 |
| 93 | Cofferdam typ 2 loc 2 (50201122) | EACH | 1 | $326,208 | $500,000 |
| 94 | Conc struct (50300225) | CY | 445.20 | $998.35 | $1,500.00 |
| 95 | Conc sup-STR (50300255) | CY | 620 | $1,413.43 | $1,600.00 |
| 96 | BR deck grooving (50300260) | SY | 2,041 | $9.00 | $9.00 |
| 97 | Seal coat conc (50300265) | CY | 471.60 | $314.87 | $250.00 |
| 98 | Protective coat (50300300) | SY | 2,694 | $0.90 | $1.30 |
| 99 | Conc supstr app slab (50301350) | CY | 156.10 | $478.48 | $700.00 |
| 100 | F & E struct steel (50500105) | LS | 1 | $1,755,314 | $1,950,000 |
| 101 | Stud shear connectors (50500505) | EACH | 7,397 | $4.61 | $5.00 |
| 102 | Reinforcement bars (50800105) | LB | 86,270 | $2.74 | $2.00 |
| 103 | Reinf bars, epoxy CTD (50800205) | LB | 337,200 | $1.71 | $2.00 |
| 104 | Bar splicers (50800515) | EACH | 1,711 | $47.39 | $69.00 |
| 105 | Mechanical splicers (50800530) | EACH | 352 | $194.52 | $190.00 |
| 106 | Parapet railing (50901750) | LF | 357 | $183.75 | $206.00 |
| 107 | Fur STL pile HP16X141 (51202110) | LF | 1,500 | $216.29 | $175.00 |
| 108 | Driving piles (51202305) | LF | 1,500 | $0.01 | $0.01 |
| 109 | Test pile ST HP16X141 (51204110) | EACH | 2 | $21,271 | $7,500.00 |
| 110 | Name plates (51500100) | EACH | 1 | $880.00 | $1,000.00 |
| 111 | Permanent casing (51602000) | LF | 269 | $509.93 | $650.00 |
| 112 | Drilled shaft in soil (51603000) | CY | 158.40 | $574.52 | $630.00 |
| 113 | Drilled shaft in rock (51604000) | CY | 102.50 | $1,918.09 | $1,700.00 |
| 114 | Anchor bolts 1 (52100520) | EACH | 28 | $73.68 | $161.00 |
| 115 | Anchor bolts 1 1/4 (52100530) | EACH | 28 | $100.08 | $205.00 |
| 116 | Temp soil reten systm (52200020) | SF | 3,132 | $26.43 | $114.00 |
| 117 | P cul CL A 1 15 (542A0220) | LF | 38 | $80.01 | $87.00 |
| 118 | P cul CL A 1 36 (542A0241) | LF | 38 | $148.45 | $147.00 |
| 119 | P cul CL A 2 15 (542A1060) | LF | 126 | $76.44 | $66.00 |
| 120 | P cul CL A 2 36 (542A1081) | LF | 40 | $134.83 | $196.00 |
| 121 | P cul CL A 1 eqrs 30 (542A5485) | LF | 19 | $231.41 | $294.00 |
| 122 | P cul CL A 1 eqrs 42 (542A5497) | LF | 36 | $366.07 | $370.00 |
| 123 | PRC flar end sec 15 (54213660) | EACH | 6 | $1,678.91 | $2,000.00 |
| 124 | Concrete collar (54248510) | CY | 1.40 | $2,101.76 | $1,215.00 |
| 125 | TRVRS pipe GRT con ES (54260315) | LF | 13 | $293.65 | $200.00 |
| 126 | Conc ES 542001 24 1:3 (54261324) | EACH | 1 | $3,109.42 | $1,900.00 |
| 127 | Conc ES 542001 36 1:3 (54261336) | EACH | 3 | $3,109.42 | $7,500.00 |
| 128 | Conc ES 542011 30 1:3 (54263330) | EACH | 1 | $3,109.42 | $5,800.00 |
| 129 | Conc ES 542011 30 1:4 (54263430) | EACH | 1 | $3,109.42 | $6,700.00 |
| 130 | Conc ES 542011 42 1:4 (54263442) | EACH | 2 | $3,109.43 | $8,900.00 |
| 131 | Storm sew CL A 1 24 (550A0120) | LF | 32 | $89.27 | $122.00 |
| 132 | Storm sewer rem 24 (55101200) | LF | 16 | $22.67 | $131.00 |
| 133 | Granular backfill STR (58600101) | CY | 542 | $70.51 | $65.00 |
| 134 | P undr for struct 4 (60146304) | LF | 220 | $29.12 | $34.00 |
| 135 | Comb CC&G TB6.18 (60604400) | LF | 56.50 | $78.34 | $90.00 |
| 136 | Comb CC&G TY B-6.24 (60605000) | LF | 171.50 | $58.26 | $59.00 |
| 137 | Conc median surf 4 (60618300) | SF | 480 | $18.13 | $13.00 |
| 138 | Pipe culv cleaned 30 (60920030) | LF | 208 | $27.44 | $29.00 |
| 139 | Misc concrete (61100605) | CY | 6 | $1,030.65 | $1,100.00 |
| 140 | SPBGR TY A 6FT posts (63000001) | LF | 10,075 | $40.95 | $40.00 |
| 141 | BCK SD prot of GRDRL (63000035) | LF | 5,074 | $16.80 | $10.00 |
| 142 | Traf bar term T6 (63100085) | EACH | 4 | $5,775.00 | $6,315.00 |
| 143 | Traf bar term T6B (63100089) | EACH | 4 | $6,300.00 | $5,800.00 |
| 144 | TR bar TRM T1 SPL tan (63100167) | EACH | 8 | $5,250.00 | $4,400.00 |
| 145 | Guardrail remov (63200310) | LF | 10,132 | $5.25 | $6.00 |
| 146 | Shoulder rum strip 8 (64200108) | LF | 14,978 | $1.20 | $1.00 |
| 147 | Engr field office A (67000400) | CAL MO | 36 | $2,200.00 | $1,700.00 |
| 148 | Engr field lab (67000600) | CAL MO | 36 | $2,200.00 | $1,600.00 |
| 149 | Mobilization (67100100) | LS | 1 | $928,955 | $1,600,000 |
| 150 | TR cont surveillance (70103815) | CAL DAY | 50 | $0.01 | $0.01 |
| 151 | Temp BR traf signals (70106500) | EACH | 1 | $68,880 | $74,000 |
| 152 | Temp rumble strips (70106700) | EACH | 6 | $1,041.60 | $3,400.00 |
| 153 | Short term pavt mking (70300100) | LF | 9,281 | $0.01 | $2.00 |
| 154 | SHRT TRM pavt MK rem (70300150) | SF | 3,095 | $0.01 | $2.00 |
| 155 | Temp PVT MK LTR & sym paint (70300211) | SF | 52 | $0.01 | $4.00 |
| 156 | Temp PVT MK line 4 - paint (70300221) | LF | 29,034 | $0.01 | $1.00 |
| 157 | Temp PVT MK line 6 - paint (70300241) | LF | 530 | $0.01 | $1.00 |
| 158 | Temp PVT MK line 8 - paint (70300251) | LF | 300 | $0.01 | $2.00 |
| 159 | Temp PVT MK line 12 - paint (70300261) | LF | 547 | $0.01 | $3.00 |
| 160 | Temp PVT MK line 24 - paint (70300281) | LF | 56 | $0.01 | $4.00 |
| 161 | Temp conc barrier (70400100) | LF | 3,663 | $27.29 | $53.00 |
| 162 | Pin temp conc barrier (70400125) | EACH | 96 | $31.29 | $44.00 |
| 163 | Rel temp conc barrier (70400200) | LF | 3,963 | $3.52 | $3.00 |
| 164 | Imp attn temp NRD TL2 (70600240) | EACH | 4 | $4,837.36 | $5,200.00 |
| 165 | Imp attn rel NRD TL2 (70600340) | EACH | 4 | $1,118.98 | $1,200.00 |
| 166 | Sign panel T1 (72000100) | SF | 301 | $34.65 | $31.00 |
| 167 | Sign panel T2 (72000200) | SF | 44 | $69.30 | $26.00 |
| 168 | Remov sign panel T1 (72400310) | SF | 191 | $25.20 | $7.00 |
| 169 | Remov sign panel T2 (72400320) | SF | 21 | $58.80 | $16.00 |
| 170 | Terminal marker - DA (72501000) | EACH | 8 | $52.50 | $47.00 |
| 171 | STR STL sin sup BA (72700100) | LB | 520 | $16.80 | $15.00 |
| 172 | Teles STL sin support (72800100) | LF | 580 | $23.10 | $19.00 |
| 173 | Base tel STL sin supp (73100100) | EACH | 2 | $630.00 | $350.00 |
| 174 | Conc foundation (73400100) | CY | 1.40 | $9,450.00 | $8,200.00 |
| 175 | THPL PVT MK LTR & sym (78000100) | SF | 52 | $10.48 | $21.00 |
| 176 | THPL PVT MK line 4 (78000200) | LF | 29,034 | $1.67 | $1.00 |
| 177 | THPL PVT MK line 6 (78000400) | LF | 530 | $2.57 | $7.00 |
| 178 | THPL PVT MK line 8 (78000500) | LF | 300 | $3.47 | $9.00 |
| 179 | THPL PVT MK line 12 (78000600) | LF | 547 | $5.22 | $14.00 |
| 180 | THPL PVT MK line 24 (78000650) | LF | 56 | $10.48 | $21.00 |
| 181 | Raised refl pavt MKR (78100100) | EACH | 158 | $65.63 | $57.00 |
| 182 | Grdrail ref type A (78200005) | EACH | 114 | $10.50 | $14.00 |
| 183 | Barr wall ref type C (78200011) | EACH | 65 | $16.48 | $42.00 |
| 184 | Raised ref PVT MK rem (78300200) | EACH | 151 | $19.96 | $14.00 |
| 185 | PVT MKG rem grinding (78300201) | SF | 10,856 | $1.68 | $4.00 |
| 186 | Uninter power sup ext (86200300) | EACH | 2 | $0.01 | $2,100.00 |
| 187 | Temp TR sig install (89000100) | EACH | 1 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.