IDOT contract 78969 bid tabulation
Section (10-1,10-3-1)B-2. Let by Illinois DOT on January 16, 2026, Gallatin, District 09. 2 bids received; low bid $5,635,125 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 89
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $5,635,125 | Low |
| 2 | E. T. Simonds Construction Company | $5,679,533 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Cros sonic log A duct (X0320051) | LF | 200 | $125.00 | $94.58 |
| 2 | Cros sonic log test (X0320052) | EACH | 6 | $2,500.00 | $1,325.50 |
| 3 | Asth enh (X0325687) | LS | 1 | $268,000 | $275,479 |
| 4 | Conc wearing surf 5 (X5030305) | SY | 280 | $133.00 | $133.21 |
| 5 | Prec bridge app slab (X5040100) | SF | 2,380 | $60.00 | $59.44 |
| 6 | Bar terminators (X5080530) | EACH | 498 | $26.00 | $25.40 |
| 7 | Construction layout (Z0013798) | LS | 1 | $35,000 | $55,982 |
| 8 | Tree remov acres (20100500) | ACRE | 0.70 | $24,000 | $14,573 |
| 9 | Earth excavation (20200100) | CY | 257 | $20.00 | $23.89 |
| 10 | Channel excavation (20300100) | CY | 4,210 | $16.00 | $26.87 |
| 11 | Furnished excavation (20400800) | CY | 1,788 | $33.00 | $30.67 |
| 12 | Seeding CL 2 (25000200) | ACRE | 1.30 | $6,700.00 | $4,702.50 |
| 13 | Seeding CL 7 (25000350) | ACRE | 1.30 | $2,800.00 | $522.50 |
| 14 | Nitrogen fert nutr (25000400) | LB | 120 | $1.75 | $1.82 |
| 15 | Phosphorus fert nutr (25000500) | LB | 120 | $1.75 | $1.82 |
| 16 | Potassium fert nutr (25000600) | LB | 120 | $1.75 | $1.82 |
| 17 | Agr ground limestone (25000700) | TON | 2.60 | $250.00 | $385.00 |
| 18 | Mulch method 2 (25100115) | ACRE | 2.60 | $850.00 | $1,237.50 |
| 19 | Erosion contr blanket (25100630) | SY | 3,382 | $1.00 | $2.15 |
| 20 | Temp eros contr seed (28000250) | LB | 130 | $4.00 | $5.23 |
| 21 | Perimeter eros bar (28000400) | LF | 1,531 | $3.50 | $6.55 |
| 22 | Stone riprap CL A3 (28100105) | SY | 228 | $56.00 | $46.16 |
| 23 | Stone riprap CL A4 (28100107) | SY | 2,471 | $57.00 | $46.55 |
| 24 | Filter fabric (28200200) | SY | 2,699 | $2.50 | $2.85 |
| 25 | Sub gran mat B (31101100) | CY | 226 | $65.00 | $0.01 |
| 26 | Bit matls tack CT (40600290) | LB | 1,245 | $0.01 | $0.01 |
| 27 | Long joint sealant (40600370) | LF | 375 | $37.00 | $8.46 |
| 28 | HMA surf rem butt JT (40600982) | SY | 414 | $25.00 | $21.89 |
| 29 | HMA BC IL-19.0 N70 (40603085) | TON | 159 | $250.00 | $221.42 |
| 30 | HMA SC IL-9.5 C N70 (40604052) | TON | 104 | $255.00 | $214.85 |
| 31 | Welded wire reinf (42000060) | SY | 134 | $18.00 | $26.96 |
| 32 | PVT con PCC BR app SL (42000080) | SY | 134 | $280.00 | $308.42 |
| 33 | Pavement rem (44000100) | SY | 302 | $29.00 | $30.17 |
| 34 | Paved SHLD removal (44004250) | SY | 506 | $14.00 | $20.77 |
| 35 | HMA shoulders 8 (48203029) | SY | 474 | $60.00 | $92.41 |
| 36 | HMA shoulders 10 (48203037) | SY | 763 | $80.00 | $83.83 |
| 37 | Rem exist struct (50100100) | EACH | 1 | $315,125 | $278,701 |
| 38 | Structure excavation (50200100) | CY | 237 | $25.00 | $36.91 |
| 39 | Floor drains (50300100) | EACH | 20 | $550.00 | $827.47 |
| 40 | Conc struct (50300225) | CY | 227.80 | $2,015.00 | $1,828.07 |
| 41 | Conc sup-STR (50300255) | CY | 431.60 | $1,450.00 | $1,526.16 |
| 42 | BR deck grooving (50300260) | SY | 1,407 | $13.00 | $12.44 |
| 43 | Protective coat (50300300) | SY | 1,763 | $3.00 | $1.55 |
| 44 | F & E struct steel (50500105) | LS | 1 | $1,282,000 | $1,172,791 |
| 45 | Stud shear connectors (50500505) | EACH | 6,792 | $4.00 | $3.80 |
| 46 | Reinforcement bars (50800105) | LB | 59,790 | $1.50 | $1.71 |
| 47 | Reinf bars, epoxy CTD (50800205) | LB | 171,950 | $1.60 | $1.62 |
| 48 | Bar splicers (50800515) | EACH | 1,263 | $45.00 | $41.53 |
| 49 | Mechanical splicers (50800530) | EACH | 80 | $115.00 | $127.96 |
| 50 | Fur STL pile HP12X74 (51201700) | LF | 535 | $140.00 | $151.98 |
| 51 | Driving piles (51202305) | LF | 535 | $0.01 | $0.01 |
| 52 | Test pile ST HP12X74 (51203700) | EACH | 2 | $25,000 | $9,090.17 |
| 53 | Pile shoes (51204650) | EACH | 12 | $250.00 | $159.50 |
| 54 | Name plates (51500100) | EACH | 1 | $1,500.00 | $1,399.93 |
| 55 | Permanent casing (51602000) | LF | 329 | $500.00 | $552.77 |
| 56 | Drilled shaft in soil (51603000) | CY | 147.70 | $525.00 | $734.09 |
| 57 | Drilled shaft in rock (51604000) | CY | 47.10 | $3,800.00 | $4,104.54 |
| 58 | Pref JT strip seal (52000110) | LF | 84 | $257.00 | $298.35 |
| 59 | Anchor bolts 1 (52100520) | EACH | 48 | $130.00 | $107.55 |
| 60 | Temp SHT piling (52200010) | SF | 803 | $75.00 | $59.11 |
| 61 | Granular backfill STR (58600101) | CY | 235 | $56.00 | $78.35 |
| 62 | Geocomposite wall DR (59100100) | SY | 82 | $45.00 | $31.44 |
| 63 | P undr for struct 4 (60146304) | LF | 141 | $45.00 | $35.66 |
| 64 | SPBGR TY A 6FT posts (63000001) | LF | 150 | $38.00 | $45.10 |
| 65 | Traf bar term T6 (63100085) | EACH | 4 | $6,500.00 | $6,270.00 |
| 66 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $4,800.00 | $4,620.00 |
| 67 | Guardrail remov (63200310) | LF | 1,076 | $8.00 | $11.27 |
| 68 | Engr field office A (67000400) | CAL MO | 18 | $1,800.00 | $2,000.00 |
| 69 | Mobilization (67100100) | LS | 1 | $350,000 | $536,672 |
| 70 | Traf cont-prot 701321 (70100405) | EACH | 1 | $65,000 | $31,479 |
| 71 | Traf cont-prot 701201 (70100450) | LS | 1 | $5,000.00 | $10,141 |
| 72 | Traf cont-prot 701326 (70100500) | LS | 1 | $0.01 | $10,141 |
| 73 | TR cont surveillance (70103815) | CAL DAY | 10 | $0.01 | $0.01 |
| 74 | Temp BR traf signals (70106500) | EACH | 1 | $65,000 | $53,900 |
| 75 | Temp rumble strips (70106700) | EACH | 6 | $1,500.00 | $1,299.19 |
| 76 | Changeable message SN (70107025) | CAL DAY | 28 | $135.00 | $73.25 |
| 77 | Short term pavt mking (70300100) | LF | 136 | $3.00 | $2.64 |
| 78 | SHRT TRM pavt MK rem (70300150) | SF | 46 | $8.00 | $6.17 |
| 79 | Temp conc barrier (70400100) | LF | 1,000 | $50.00 | $25.92 |
| 80 | Pin temp conc barrier (70400125) | EACH | 36 | $85.00 | $59.94 |
| 81 | Rel temp conc barrier (70400200) | LF | 1,000 | $6.00 | $4.87 |
| 82 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $4,500.00 | $4,369.04 |
| 83 | Imp attn rel NRN TL3 (70600352) | EACH | 2 | $1,800.00 | $1,139.21 |
| 84 | Terminal marker - DA (72501000) | EACH | 4 | $55.00 | $55.00 |
| 85 | Paint PVT MK line 4 (78001110) | LF | 3,010 | $2.00 | $1.76 |
| 86 | Grdrail ref type A (78200005) | EACH | 16 | $11.00 | $11.00 |
| 87 | Raised ref PVT MK rem (78300200) | EACH | 9 | $25.00 | $14.93 |
| 88 | PVT MKG rem grinding (78300201) | SF | 280 | $0.01 | $15.40 |
| 89 | Uninter power sup ext (86200300) | EACH | 1 | $4,000.00 | $3,520.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.