IDOT contract 78B64 bid tabulation

. Let by Illinois DOT on November 7, 2025, Various, District 09. 3 bids received; low bid $396,418 by M & M Concrete, Inc..

Owner
Illinois DOT
Letting
07 NOV 2025
Pay items
8
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1M & M Concrete, Inc.$396,418Low
2All States Painting, Inc.$429,369+8.0%
3Samron Midwest Contracting, Inc.$1,604,503+305%
IDOT contract 78B64: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. M & M Concrete, Inc.2. All States Painting, Inc.3. Samron Midwest Contracting, Inc.
1BR DK concrete sealer (X5870015)SF1,379,870$0.17$0.24$0.75
2Mobilization (67100100)LS1$18,000$23,500$100,000
3Traf cont-prot 701421 (70100310)LS1$10,000$500.00$50,000
4Traf cont-prot 701411 (70100420)EACH2$500.00$1,000.00$50,000
5Traf cont-prot 701201 (70100450)LS1$250.00$2,000.00$50,000
6Traf cont-prot 701406 (70100700)LS1$100,000$55,000$200,000
7Traf cont-prot 701456 (70100825)LS1$250.00$500.00$50,000
8Changeable message SN (70107025)CAL DAY196$165.00$75.00$100.00
IDOT contract 78B64: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy