IDOT contract 80B19 bid tabulation
Section 2025-1093-RS. Let by Illinois DOT on January 16, 2026, Cook, District 01. 4 bids received; low bid $959,778 by Gallagher Asphalt Corporation.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 93
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gallagher Asphalt Corporation | $959,778 | Low |
| 2 | K-Five Construction Corporation | $1,053,000 | +10% |
| 3 | D. Construction, Inc. | $1,073,482 | +12% |
| 4 | Iroquois Paving Corporation | $1,075,173 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gallagher Asphalt Corporation | 2. K-Five Construction Corporation | 3. D. Construction, Inc. | 4. Iroquois Paving Corporation |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $3,280.00 | $1,800.00 | $7,500.00 | $8,000.00 |
| 2 | Rem & rein bric paver (X0327611) | SF | 61 | $30.00 | $29.00 | $35.00 | $40.00 |
| 3 | Ped signal post 10 FT (X1400367) | EACH | 4 | $1,500.00 | $1,400.00 | $1,542.85 | $1,455.00 |
| 4 | CC&G RMVL repl < = 10 (X4400501) | LF | 116 | $78.00 | $65.00 | $80.00 | $123.00 |
| 5 | CC&G RMVL repl > 10FT (X4400503) | LF | 383 | $73.00 | $65.00 | $55.00 | $98.50 |
| 6 | SS cleaned 12 (X5537800) | LF | 255 | $3.60 | $1.00 | $1.10 | $1.05 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $500.00 | $3,500.00 | $5,000.00 | $0.01 |
| 8 | Temp info signing (X7200061) | SF | 105 | $36.00 | $15.00 | $30.00 | $36.25 |
| 9 | Accessible ped signal (X8760200) | EACH | 4 | $2,800.00 | $2,600.00 | $2,867.08 | $2,699.30 |
| 10 | Conc FDN TY A 12D (X8780012) | LF | 16 | $360.00 | $335.00 | $365.57 | $340.00 |
| 11 | Det loop repl (X8860105) | LF | 67 | $31.00 | $30.00 | $31.44 | $29.00 |
| 12 | Drainage STR cleaned (Z0018500) | EACH | 17 | $400.00 | $335.00 | $368.50 | $350.00 |
| 13 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $1,050.00 | $1,000.00 | $1,108.80 | $1,045.00 |
| 14 | Earth excavation (20200100) | CY | 20 | $102.00 | $85.00 | $100.00 | $145.00 |
| 15 | Topsoil F & P 4 (21101615) | SY | 122 | $13.00 | $25.00 | $24.20 | $15.50 |
| 16 | Nitrogen fert nutr (25000400) | LB | 1 | $26.00 | $25.00 | $3.30 | $103.50 |
| 17 | Phosphorus fert nutr (25000500) | LB | 1 | $26.00 | $25.00 | $3.30 | $103.50 |
| 18 | Potassium fert nutr (25000600) | LB | 1 | $26.00 | $25.00 | $3.30 | $103.50 |
| 19 | Sodding salt tolerant (25200110) | SY | 126 | $39.00 | $25.00 | $85.80 | $31.00 |
| 20 | Supple watering (25200200) | UNIT | 0.80 | $450.00 | $546.00 | $55.00 | $0.01 |
| 21 | Agg base cse B 4 (35101600) | SY | 10 | $7.00 | $15.00 | $70.00 | $65.00 |
| 22 | Bit matls tack CT (40600290) | LB | 17,368 | $0.01 | $0.01 | $0.01 | $0.01 |
| 23 | Long joint sealant (40600370) | LF | 13,713 | $2.85 | $3.00 | $2.75 | $2.50 |
| 24 | Mix CR JTS flangewys (40600400) | TON | 39 | $50.00 | $50.00 | $0.01 | $0.01 |
| 25 | HMA surf rem butt JT (40600982) | SY | 218 | $12.50 | $5.00 | $25.00 | $0.01 |
| 26 | HMA repl over patch (40601005) | TON | 86 | $123.50 | $130.00 | $0.01 | $155.00 |
| 27 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,053 | $129.00 | $135.00 | $97.00 | $135.00 |
| 28 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 2,501 | $125.00 | $130.00 | $116.00 | $135.00 |
| 29 | Protective coat (42001300) | SY | 415 | $1.55 | $3.00 | $1.00 | $0.01 |
| 30 | PC conc sidewalk 5 (42400200) | SF | 1,320 | $11.00 | $15.00 | $10.00 | $12.50 |
| 31 | Detectable warnings (42400800) | SF | 100 | $26.00 | $55.00 | $50.00 | $32.00 |
| 32 | HMA surf rem 2 1/2 (44000159) | SY | 25,511 | $2.75 | $3.00 | $1.80 | $3.95 |
| 33 | Sidewalk rem (44000600) | SF | 1,485 | $3.65 | $5.00 | $3.00 | $3.50 |
| 34 | HMA RM OV patch 4 (44002216) | SY | 380 | $19.75 | $30.00 | $0.01 | $13.50 |
| 35 | Median removal (44003100) | SF | 1,070 | $10.30 | $5.00 | $8.00 | $3.25 |
| 36 | CL D patch T1 9 (44201749) | SY | 5 | $190.00 | $50.00 | $250.00 | $300.00 |
| 37 | CL D patch T2 9 (44201753) | SY | 262 | $100.00 | $50.00 | $120.00 | $160.00 |
| 38 | CL D patch T3 9 (44201757) | SY | 40 | $95.00 | $50.00 | $120.00 | $155.00 |
| 39 | CL D patch T4 9 (44201759) | SY | 73 | $88.00 | $50.00 | $120.00 | $150.00 |
| 40 | CB adjust (60250200) | EACH | 3 | $525.00 | $800.00 | $900.00 | $415.00 |
| 41 | CB reconst (60252800) | EACH | 2 | $1,200.00 | $2,000.00 | $1,800.00 | $1,500.00 |
| 42 | Man adjust (60255500) | EACH | 2 | $525.00 | $800.00 | $900.00 | $415.00 |
| 43 | Man reconst (60257900) | EACH | 3 | $1,300.00 | $2,200.00 | $2,000.00 | $1,500.00 |
| 44 | FR & grates adjust (60300105) | EACH | 9 | $390.00 | $800.00 | $800.00 | $300.00 |
| 45 | FR & lids adjust (60300305) | EACH | 5 | $390.00 | $800.00 | $800.00 | $410.00 |
| 46 | FR & grates T24 (60404950) | EACH | 3 | $575.00 | $1,350.00 | $650.00 | $520.00 |
| 47 | FR & lids T1 OL (60406000) | EACH | 2 | $475.00 | $550.00 | $650.00 | $475.00 |
| 48 | Conc curb TB (60600605) | LF | 50 | $54.95 | $55.00 | $50.00 | $50.00 |
| 49 | Conc median surf 4 (60618300) | SF | 765 | $10.65 | $18.00 | $10.00 | $11.00 |
| 50 | Pipe culv cleaned 12 (60920012) | LF | 170 | $4.15 | $7.50 | $8.25 | $7.75 |
| 51 | Pipe culv cleaned 24 (60920024) | LF | 500 | $5.15 | $9.00 | $9.90 | $9.35 |
| 52 | Non SPL waste disposl (66900200) | CY | 20 | $133.00 | $150.00 | $110.00 | $130.00 |
| 53 | Soil disposal analy (66900530) | EACH | 1 | $1,500.00 | $1,300.00 | $1,925.00 | $1,745.00 |
| 54 | Reg sub P-const plan (66901001) | LS | 1 | $3,200.00 | $3,100.00 | $2,475.00 | $3,315.00 |
| 55 | Reg sub F con report (66901003) | LS | 1 | $1,225.00 | $1,200.00 | $2,475.00 | $1,550.00 |
| 56 | Reg sub mon (66901006) | CAL DAY | 3 | $700.00 | $680.00 | $1,000.00 | $1,295.00 |
| 57 | Mobilization (67100100) | LS | 1 | $57,500 | $60,000 | $60,700 | $90,000 |
| 58 | TR cont & prot 701601 (70102630) | LS | 1 | $150.00 | $4,784.63 | $50,200 | $150.00 |
| 59 | TR cont & prot 701602 (70102632) | LS | 1 | $9,291.72 | $2,500.00 | $0.01 | $6,550.00 |
| 60 | TR cont & prot 701701 (70102635) | LS | 1 | $150.00 | $2,500.00 | $0.01 | $150.00 |
| 61 | TR cont & prot 701801 (70102640) | LS | 1 | $150.00 | $2,500.00 | $0.01 | $150.00 |
| 62 | Short term pavt mking (70300100) | LF | 50,912 | $0.01 | $0.01 | $0.50 | $0.01 |
| 63 | SHRT TRM pavt MK rem (70300150) | SF | 4,243 | $0.01 | $3.00 | $2.00 | $0.01 |
| 64 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,154 | $0.01 | $0.01 | $3.00 | $0.01 |
| 65 | Temp PVT MK line 4 - paint (70300221) | LF | 20,342 | $0.01 | $0.01 | $0.50 | $0.01 |
| 66 | Temp PVT MK line 6 - paint (70300241) | LF | 3,236 | $0.01 | $0.01 | $0.75 | $0.01 |
| 67 | Temp PVT MK line 8 - paint (70300251) | LF | 450 | $0.01 | $0.01 | $1.00 | $0.01 |
| 68 | Temp PVT MK line 12 - paint (70300261) | LF | 2,542 | $0.01 | $0.01 | $2.00 | $0.01 |
| 69 | Temp PVT MK line 24 - paint (70300281) | LF | 428 | $0.01 | $0.01 | $5.00 | $0.01 |
| 70 | Temp PVT MK L4 T4 tape (70307120) | LF | 12,728 | $0.01 | $1.20 | $2.00 | $0.01 |
| 71 | THPL PVT MK LTR & sym (78000100) | SF | 577 | $5.50 | $5.50 | $6.05 | $5.70 |
| 72 | THPL PVT MK line 4 (78000200) | LF | 10,171 | $0.60 | $0.60 | $0.66 | $0.65 |
| 73 | THPL PVT MK line 6 (78000400) | LF | 1,618 | $1.10 | $1.10 | $1.21 | $1.15 |
| 74 | THPL PVT MK line 8 (78000500) | LF | 225 | $1.50 | $1.50 | $1.65 | $1.55 |
| 75 | THPL PVT MK line 12 (78000600) | LF | 1,271 | $3.00 | $3.00 | $3.30 | $3.10 |
| 76 | THPL PVT MK line 24 (78000650) | LF | 214 | $5.50 | $5.50 | $6.05 | $5.70 |
| 77 | Mod ureth PM line 4 (78009004) | LF | 375 | $7.50 | $7.50 | $8.25 | $7.75 |
| 78 | Raised refl pavt MKR (78100100) | EACH | 317 | $40.00 | $40.00 | $44.00 | $41.50 |
| 79 | Raised ref PVT MK rem (78300200) | EACH | 317 | $0.01 | $10.00 | $10.00 | $0.01 |
| 80 | Undrgrd C galvs 2 (81028200) | LF | 62 | $88.00 | $81.00 | $89.27 | $84.00 |
| 81 | Undrgrd C galvs 4 (81028240) | LF | 53 | $115.00 | $106.00 | $115.97 | $109.00 |
| 82 | HD handhole (81400200) | EACH | 1 | $6,600.00 | $6,100.00 | $6,664.81 | $6,275.00 |
| 83 | Main EX TR sig instal (85000200) | EACH | 1 | $2,200.00 | $2,100.00 | $2,227.16 | $2,095.00 |
| 84 | Elcbl C signal 14 2C (87301215) | LF | 642 | $2.20 | $2.05 | $2.26 | $2.10 |
| 85 | Elcbl C signal 14 3C (87301225) | LF | 656 | $2.40 | $2.25 | $2.48 | $2.35 |
| 86 | Elcbl C lead 14 1PR (87301305) | LF | 545 | $2.40 | $2.25 | $2.48 | $2.35 |
| 87 | Elcbl C egrdc 6 1C (87301900) | LF | 84 | $3.05 | $2.82 | $3.10 | $2.95 |
| 88 | Drill EX handhole (87900200) | EACH | 5 | $500.00 | $460.28 | $506.31 | $475.00 |
| 89 | Ped SH LED 1F BM CDT (88102717) | EACH | 4 | $715.00 | $660.84 | $726.92 | $685.00 |
| 90 | Det loop T1 (88600100) | LF | 1,205 | $31.00 | $28.58 | $31.44 | $29.50 |
| 91 | Mod EX contr (89502200) | EACH | 1 | $1,350.00 | $1,300.00 | $1,377.08 | $1,295.00 |
| 92 | Rem elcbl FR con (89502300) | LF | 186 | $1.65 | $1.51 | $1.66 | $1.55 |
| 93 | Remov EX handhole (89502380) | EACH | 1 | $1,500.00 | $1,400.00 | $1,523.54 | $1,435.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.