IDOT contract 87873 bid tabulation
Plano, section 22-00049-00-PV. Let by Illinois DOT on January 17, 2025, Kendall, District 03. 4 bids received; low bid $1,060,850 by Geneva Construction Company.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 61
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Geneva Construction Company | $1,060,850 | Low |
| 2 | Curran Contracting Company | $1,110,268 | +5.0% |
| 3 | D. Construction, Inc. | $1,127,678 | +6.0% |
| 4 | Alliance Contractors, Inc. | $1,279,235 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Geneva Construction Company | 2. Curran Contracting Company | 3. D. Construction, Inc. | 4. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Temp access- priv ent (X4021000) | EACH | 17 | $525.00 | $300.00 | $500.00 | $1.00 |
| 2 | Temp access- com ent (X4022000) | EACH | 2 | $1,025.00 | $450.00 | $1,000.00 | $1.00 |
| 3 | Traf cont & prot SPL (X7010216) | LS | 1 | $16,550 | $40,000 | $35,572 | $13,000 |
| 4 | Change message SN SPL (X7010238) | CAL MO | 12 | $1,200.00 | $850.00 | $2,000.00 | $850.00 |
| 5 | Temp info signing (X7200061) | SF | 100 | $20.00 | $18.00 | $30.00 | $18.00 |
| 6 | Detour signing (X7200203) | LS | 1 | $1,650.00 | $6,000.00 | $5,000.00 | $6,000.00 |
| 7 | Construction layout (Z0013798) | LS | 1 | $9,900.00 | $12,000 | $5,000.00 | $9,900.00 |
| 8 | Earth excavation (20200100) | CY | 2,520 | $36.00 | $40.00 | $25.00 | $40.00 |
| 9 | Rem & disp uns matl (20201200) | CY | 200 | $35.00 | $35.00 | $30.00 | $65.00 |
| 10 | Geotech fab F/GR stab (21001000) | SY | 150 | $5.00 | $2.00 | $5.00 | $2.00 |
| 11 | Topsoil F & P 4 (21101615) | SY | 3,208 | $5.00 | $5.00 | $4.95 | $5.00 |
| 12 | Seeding CL 1A (25000110) | ACRE | 0.70 | $4,000.00 | $4,000.00 | $4,675.00 | $4,000.00 |
| 13 | Nitrogen fert nutr (25000400) | LB | 60 | $3.00 | $3.00 | $3.30 | $3.00 |
| 14 | Phosphorus fert nutr (25000500) | LB | 60 | $3.00 | $3.00 | $3.30 | $3.00 |
| 15 | Potassium fert nutr (25000600) | LB | 60 | $3.00 | $3.00 | $3.30 | $3.00 |
| 16 | Erosion contr blanket (25100630) | SY | 3,208 | $1.10 | $1.10 | $4.13 | $1.10 |
| 17 | Temp eros contr seed (28000250) | LB | 210 | $0.10 | $0.10 | $3.41 | $0.10 |
| 18 | Perimeter eros bar (28000400) | LF | 2,900 | $3.00 | $3.00 | $2.20 | $3.00 |
| 19 | Inlet & pipe protect (28000500) | EACH | 2 | $300.00 | $300.00 | $200.00 | $50.00 |
| 20 | Inlet filters (28000510) | EACH | 35 | $185.00 | $185.00 | $250.00 | $50.00 |
| 21 | Agg subgrade improve (30300001) | CY | 50 | $46.00 | $45.00 | $60.00 | $50.00 |
| 22 | Agg subgrade impr 12 (30300112) | SY | 6,508 | $17.00 | $15.00 | $19.00 | $16.00 |
| 23 | Sub gran mat B 4 (31101200) | SY | 1,255 | $5.00 | $9.00 | $7.00 | $6.50 |
| 24 | Sub gran mat B 6 (31101400) | SY | 573 | $14.00 | $25.00 | $10.00 | $9.75 |
| 25 | HMA base cse 4 1/4 (35501301) | SY | 6,085 | $20.00 | $16.50 | $17.00 | $24.00 |
| 26 | Bit matls PR CT (40600275) | LB | 13,692 | $0.01 | $0.01 | $0.01 | $0.01 |
| 27 | Bit matls tack CT (40600290) | LB | 5,166 | $0.01 | $1.25 | $0.01 | $0.01 |
| 28 | Long joint sealant (40600370) | LF | 2,430 | $3.50 | $3.75 | $5.50 | $3.60 |
| 29 | HMA BC IL-19.0 N50 (40603080) | TON | 1,139 | $86.00 | $98.00 | $73.50 | $100.00 |
| 30 | HMA SC IL-9.5 C N50 (40604050) | TON | 805 | $109.00 | $98.00 | $78.00 | $108.00 |
| 31 | Protective coat (42001300) | SY | 2,027 | $0.01 | $1.80 | $1.00 | $0.01 |
| 32 | PCC driveway pavt 6 (42300200) | SY | 166 | $105.00 | $80.60 | $80.00 | $75.00 |
| 33 | PC conc sidewalk 5 (42400200) | SF | 11,292 | $8.65 | $6.90 | $9.50 | $7.50 |
| 34 | Detectable warnings (42400800) | SF | 112 | $40.00 | $35.00 | $40.00 | $20.00 |
| 35 | Pavement rem (44000100) | SY | 5,962 | $6.95 | $7.00 | $12.00 | $30.00 |
| 36 | HMA surf rem 3 3/4 (44000164) | SY | 2,982 | $4.80 | $4.00 | $4.00 | $6.00 |
| 37 | Drive pavement rem (44000200) | SY | 481 | $9.00 | $14.50 | $10.00 | $20.00 |
| 38 | Comb curb gutter rem (44000500) | LF | 3,463 | $4.00 | $8.00 | $8.00 | $20.00 |
| 39 | Sidewalk rem (44000600) | SF | 5,957 | $1.50 | $2.25 | $2.00 | $2.00 |
| 40 | Pipe underdrain 4 SP (60108100) | LF | 50 | $43.00 | $85.00 | $25.00 | $90.00 |
| 41 | Pipe underdr T 3 (60108501) | LF | 100 | $45.00 | $85.00 | $25.00 | $90.00 |
| 42 | Man adjust (60255500) | EACH | 2 | $525.00 | $1,200.00 | $1,000.00 | $250.00 |
| 43 | Man adj new T10F&G (60256600) | EACH | 1 | $1,175.00 | $1,850.00 | $1,400.00 | $1,500.00 |
| 44 | Man adj new T11F&G (60256700) | EACH | 7 | $1,175.00 | $1,850.00 | $1,400.00 | $1,000.00 |
| 45 | Inlets adj new T10F&G (60261200) | EACH | 1 | $1,175.00 | $900.00 | $1,400.00 | $1,500.00 |
| 46 | Inlets adj new T11F&G (60261300) | EACH | 7 | $1,175.00 | $900.00 | $1,400.00 | $1,000.00 |
| 47 | Comb CC&G TB6.12 (60603800) | LF | 3,472 | $25.00 | $25.00 | $30.00 | $26.00 |
| 48 | Engr field office A (67000400) | CAL MO | 3 | $4,000.00 | $2,500.00 | $4,000.00 | $500.00 |
| 49 | Mobilization (67100100) | LS | 1 | $63,800 | $88,000 | $63,800 | $67,171 |
| 50 | Short term pavt mking (70300100) | LF | 720 | $1.50 | $0.50 | $3.00 | $1.00 |
| 51 | SHRT TRM pavt MK rem (70300150) | SF | 240 | $1.50 | $10.00 | $2.00 | $1.00 |
| 52 | Temp PVT MK L4 T4 tape (70307120) | LF | 4,400 | $1.20 | $1.40 | $4.00 | $1.40 |
| 53 | Reloc sin pan assy TA (72400500) | EACH | 5 | $275.00 | $75.00 | $302.50 | $75.00 |
| 54 | THPL PVT MK LTR & sym (78000100) | SF | 93.60 | $5.75 | $7.50 | $8.25 | $7.50 |
| 55 | THPL PVT MK line 4 (78000200) | LF | 1,943 | $2.05 | $1.25 | $1.38 | $1.25 |
| 56 | THPL PVT MK line 6 (78000400) | LF | 731 | $2.25 | $1.90 | $2.09 | $1.90 |
| 57 | THPL PVT MK line 8 (78000500) | LF | 100 | $2.95 | $2.50 | $2.75 | $2.50 |
| 58 | THPL PVT MK line 12 (78000600) | LF | 45 | $3.32 | $3.75 | $4.13 | $3.75 |
| 59 | THPL PVT MK line 24 (78000650) | LF | 154 | $8.65 | $7.50 | $8.25 | $7.50 |
| 60 | PVT MKG rem WTR blast (78300202) | SF | 401 | $15.00 | $7.00 | $15.00 | $7.00 |
| 61 | Det loop T2 (88600200) | LF | 450 | $25.00 | $38.00 | $51.98 | $47.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.