IDOT contract 89837 bid tabulation
Project Number: Lwiy-566 / /, section 22-00022-00-BR. Let by Illinois DOT on January 17, 2025, Fulton, District 04. 3 bids received; low bid $1,169,900 by Otto Baum Company, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 51
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Otto Baum Company, Inc. | $1,169,900 | Low |
| 2 | Laverdiere Construction, Inc. | $1,385,179 | +18% |
| 3 | Stark Excavating, Inc. | $1,394,981 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Otto Baum Company, Inc. | 2. Laverdiere Construction, Inc. | 3. Stark Excavating, Inc. |
|---|---|---|---|---|---|---|
| 1 | STL railing TY SM SPL (X2300017) | LF | 197 | $265.79 | $323.00 | $252.00 |
| 2 | Seeding CL 2 SPL (X2501000) | ACRE | 0.25 | $21,263 | $17,150 | $13,800 |
| 3 | Bar terminators (X5080530) | EACH | 444 | $23.02 | $27.00 | $27.00 |
| 4 | Traf bar term T6A SPL (X6310088) | EACH | 1 | $4,624.76 | $7,931.00 | $4,400.00 |
| 5 | SPBGR (short radius) (X6330725) | LF | 12.50 | $106.32 | $77.50 | $102.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $5,209.50 | $9,850.00 | $5,000.00 |
| 7 | Construction layout (Z0013798) | LS | 1 | $12,731 | $15,000 | $10,000 |
| 8 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 10 | Tree remov 6-15 (20100110) | UNIT | 104 | $45.24 | $63.00 | $75.00 |
| 11 | Tree remov over 15 (20100210) | UNIT | 56 | $68.07 | $65.00 | $78.00 |
| 12 | Earth excavation (20200100) | CY | 275 | $53.24 | $36.00 | $76.00 |
| 13 | Channel excavation (20300100) | CY | 390 | $32.10 | $41.00 | $29.00 |
| 14 | Furnished excavation (20400800) | CY | 35 | $49.57 | $50.00 | $55.00 |
| 15 | Porous gran embank (20700220) | CY | 220 | $129.37 | $115.00 | $128.00 |
| 16 | Temp eros contr seed (28000250) | LB | 250 | $3.45 | $3.00 | $4.00 |
| 17 | Temp ditch checks (28000305) | LF | 12 | $40.10 | $19.00 | $17.50 |
| 18 | Perimeter eros bar (28000400) | LF | 500 | $4.44 | $5.00 | $4.50 |
| 19 | Inlet & pipe protect (28000500) | EACH | 1 | $536.01 | $200.00 | $128.00 |
| 20 | Stone riprap CL A5 (28100209) | TON | 1,150 | $63.72 | $97.00 | $122.00 |
| 21 | Filter fabric (28200200) | SY | 685 | $2.67 | $3.00 | $6.60 |
| 22 | Agg base cse A (35100100) | TON | 486 | $53.13 | $52.00 | $72.00 |
| 23 | Agg surf course TY B (40200800) | TON | 78 | $57.32 | $67.00 | $106.00 |
| 24 | Bit matls PR CT (40600275) | LB | 1,479 | $1.33 | $2.50 | $1.30 |
| 25 | Bit matls tack CT (40600290) | LB | 465 | $1.33 | $6.40 | $1.30 |
| 26 | HMA BC IL-19.0 N50 (40603080) | TON | 91 | $289.18 | $312.00 | $273.00 |
| 27 | HMA SC IL-9.5 C N50 (40604050) | TON | 54 | $303.00 | $373.00 | $288.00 |
| 28 | Aggregate SHLDS B (48101200) | TON | 105 | $63.27 | $96.00 | $113.00 |
| 29 | Rem exist struct (50100100) | EACH | 1 | $28,789 | $25,000 | $75,000 |
| 30 | Pipe culvert remov (50105220) | LF | 40 | $19.98 | $40.00 | $20.00 |
| 31 | Structure excavation (50200100) | CY | 485 | $32.25 | $30.00 | $27.00 |
| 32 | Conc struct (50300225) | CY | 62.50 | $705.78 | $1,225.00 | $1,058.00 |
| 33 | Conc sup-STR (50300255) | CY | 128.90 | $1,309.88 | $1,600.00 | $1,453.00 |
| 34 | BR deck grooving (50300260) | SY | 310 | $19.78 | $15.00 | $18.00 |
| 35 | Concrete encasement (50300280) | CY | 23.30 | $981.18 | $650.00 | $635.00 |
| 36 | Protective coat (50300300) | SY | 415 | $3.76 | $8.00 | $5.25 |
| 37 | F & E struct steel (50500105) | LS | 1 | $361,109 | $408,080 | $338,900 |
| 38 | Stud shear connectors (50500505) | EACH | 1,440 | $4.52 | $5.50 | $4.80 |
| 39 | Reinf bars, epoxy CTD (50800205) | LB | 36,810 | $1.59 | $1.85 | $2.20 |
| 40 | Fur STL pile HP14X73 (51201800) | LF | 250 | $51.14 | $70.00 | $51.25 |
| 41 | Drill & set piles (IR) (51265002) | CF | 294.60 | $79.09 | $183.00 | $230.00 |
| 42 | Name plates (51500100) | EACH | 1 | $892.51 | $900.00 | $900.00 |
| 43 | Anchor bolts 1 (52100520) | EACH | 20 | $204.01 | $245.00 | $157.00 |
| 44 | P cul CL D 1 18 (542D0223) | LF | 40 | $64.80 | $78.00 | $90.00 |
| 45 | Geocomposite wall DR (59100100) | SY | 105 | $19.33 | $20.00 | $38.00 |
| 46 | P undr for struct 4 (60146304) | LF | 170 | $21.20 | $25.00 | $49.00 |
| 47 | Traf bar term T6A (63100087) | EACH | 1 | $4,305.81 | $6,456.00 | $4,100.00 |
| 48 | TR bar TRM T1 SPL tan (63100167) | EACH | 1 | $4,040.02 | $5,338.00 | $3,900.00 |
| 49 | Mobilization (67100100) | LS | 1 | $70,200 | $57,500 | $80,000 |
| 50 | Terminal marker - DA (72501000) | EACH | 3 | $42.53 | $63.00 | $41.00 |
| 51 | Grdrail ref type A (78200005) | EACH | 7 | $12.76 | $13.00 | $13.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.