IDOT contract 89854 bid tabulation

Project Number: L040-405 / /, section 20-00091-03-BR. Let by Illinois DOT on January 17, 2025, Woodford, District 04. 2 bids received; low bid $4,250,597 by R. A. Cullinan and Son, a div of UCM, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
148
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1R. A. Cullinan and Son, a div of UCM, Inc.$4,250,597Low
2Stark Excavating, Inc.$4,268,3000.0%
IDOT contract 89854: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. R. A. Cullinan and Son, a div of UCM, Inc.2. Stark Excavating, Inc.
1T-acer rubrm 2 (A2001016)EACH1$1,050.00$1,100.00
2E-picea pung glau 4' (D2002248)EACH1$1,050.00$815.00
3Traf bar term T1 (LR631020)EACH2$3,858.75$4,000.00
4Stump removal (X2010404)EACH3$770.71$225.00
5HMA surf rem var DP (X4401198)SY929$9.61$10.00
6Conc wearing surf 5 (X5030305)SY364$264.60$252.00
7Man TA 4 dia SPL F&G (X6022230)EACH2$7,206.23$4,900.00
8Man TA 5 dia SPL F&G (X6022930)EACH1$9,099.43$7,700.00
9Inlets TB W/SPL F&G (X6024502)EACH2$7,177.61$5,800.00
10Conc gutter trans (X6060032)LF42$222.83$100.00
11Conc gutter TB SPL (X6063000)LF88$214.03$138.00
12Fence removal (X6640104)LF118$18.13$5.50
13Traf cont & prot SPL (X7010216)LS1$36,488$60,500
14HMA driveway pavt 6 (Z0004522)SY364$93.38$111.00
15Construction layout (Z0013798)LS1$28,716$47,400
16SS 2 wat MN 15 (Z0056669)LF300$137.16$89.50
17Rem reloc EX monument (Z0070150)EACH1$15,128$4,750.00
18Trainees (Z0076600)HR1,500$0.80$0.80
19Trainees TPG (Z0076604)HR1,500$15.00$15.00
20Tree remov 6-15 (20100110)UNIT8$89.41$60.00
21Tree remov over 15 (20100210)UNIT140$90.22$52.00
22Earth excavation (20200100)CY3,515$33.17$31.50
23Channel excavation (20300100)CY2,100$30.13$36.00
24Furnished excavation (20400800)CY495$29.40$27.00
25Trench backfill (20800150)CY536$35.66$80.00
26Topsoil F & P 4 (21101615)SY11,008$6.05$7.00
27Explor trench 60 (21301060)LF231$9.20$30.00
28Seeding CL 2A (25000210)ACRE2.50$1,470.00$2,400.00
29Nitrogen fert nutr (25000400)LB207$3.15$2.10
30Phosphorus fert nutr (25000500)LB207$3.15$2.10
31Potassium fert nutr (25000600)LB207$3.15$2.10
32Mulch method 2 (25100115)ACRE2$1,470.00$1,600.00
33Erosion contr blanket (25100630)SY1,777$1.58$1.60
34Temp eros contr seed (28000250)LB691$3.59$1.10
35Temp ditch checks (28000305)LF210$23.08$10.50
36Perimeter eros bar (28000400)LF3,865$3.98$2.75
37Inlet & pipe protect (28000500)EACH5$408.00$250.00
38Inlet filters (28000510)EACH22$566.30$225.00
39Stone riprap CL A3 (28100105)SY31$97.45$144.00
40Stone riprap CL A4 (28100107)SY738$96.60$92.00
41Filter fabric (28200200)SY764$4.73$4.50
42Articul block rev mat (28500400)SY215$435.75$415.00
43Agg subgrade improve (30300001)CY3,303$72.62$85.00
44Agg base cse A (35100100)TON3,289$46.77$40.00
45HMA BC wid 4 (35600650)SY342$40.33$52.00
46Agg surf cse A 8 (40200700)SY79$105.10$46.00
47Bit matls PR CT (40600275)LB21,135$1.03$1.10
48P bit matls tack CT (40600295)LB13,882$1.20$1.25
49Matl transfer device (40600405)TON2,817$8.04$8.50
50HMA surf rem butt JT (40600982)SY266$34.52$36.50
51HMA BC IL-19.0 N50 (40603080)TON1,161$127.81$164.25
52P HMA BC IL-9.5 N50 (40603205)TON683$168.97$183.25
53P HMA SC IL-9.5 C N50 (40604150)TON895$170.19$180.00
54PVT con HMA BR app SL (42000070)SY188$139.36$162.00
55PCC driveway pavt 6 (42300200)SY315$126.72$108.00
56PCC driveway pavt 8 (42300400)SY646$121.94$115.00
57PC conc sidewalk 4 (42400100)SF6,687$12.88$11.00
58Detectable warnings (42400800)SF122$46.77$39.50
59Pavement rem (44000100)SY9,558$8.84$10.50
60Drive pavement rem (44000200)SY985$17.09$15.50
61Comb curb gutter rem (44000500)LF935$10.31$4.75
62Sidewalk rem (44000600)SF4,254$1.25$1.75
63Aggregate SHLDS B 6 (48101500)SY833$18.87$32.00
64HMA shoulders 5 3/4 (48203020)SY1,798$40.47$56.50
65Rem exist struct (50100100)EACH1$68,250$65,000
66Conc headwall removal (50104400)EACH2$2,032.99$2,900.00
67Pipe culvert remov (50105220)LF252$16.86$19.00
68Structure excavation (50200100)CY176$45.15$43.00
69Conc struct (50300225)CY103$897.75$855.00
70Conc sup-STR (50300255)CY44.20$2,021.25$1,925.00
71BR deck grooving (50300260)SY575$19.95$19.00
72Concrete encasement (50300280)CY9.20$1,260.00$1,200.00
73Protective coat (50300300)SY794$4.20$4.00
74Conc supstr app slab (50301350)CY152.90$525.00$500.00
75P P conc DK BM 27 DP (50400505)SF3,236$132.30$126.00
76Reinforcement bars (50800105)LB30$11.63$11.50
77Reinf bars, epoxy CTD (50800205)LB90,030$1.94$1.85
78Alum railing TY L (50900105)LF60$278.57$288.00
79Fur M S pile 12X0.250 (51200957)LF540$82.95$79.00
80Driving piles (51202305)LF540$0.01$0.01
81Test pile met shells (51203200)EACH2$29,400$28,000
82Pile shoes (51204650)EACH20$346.50$330.00
83Name plates (51500100)EACH1$976.50$930.00
84Box cul end sec C1 (54001001)EACH1$23,443$21,125
85P cul CL C 1 15 (542C0220)LF103$123.72$75.00
86PRC flar end sec 8 (54213654)EACH1$1,874.94$2,300.00
87PRC flar end sec 12 (54213657)EACH1$2,002.85$2,800.00
88PRC flar end sec 15 (54213660)EACH3$2,075.92$1,500.00
89PRC flar end sec 18 (54213663)EACH1$2,227.84$2,100.00
90Concrete collar (54248510)CY0.40$12,936$5,125.00
91Metal FL end sec 15" (54262715)EACH4$1,295.75$640.00
92Metal FL ES EQ RS 36" (54262836)EACH1$2,245.33$2,950.00
93SS CL A 1 eqrs 36 (550A4500)LF101$292.69$251.00
94Storm sew CL B 1 12 (550B0050)LF155$98.43$44.00
95Storm sew CL B 1 15 (550B0070)LF92$102.89$64.00
96Storm sew CL B 2 12 (550B0340)LF38$145.41$52.00
97Storm sew CL B 2 15 (550B0360)LF124$120.68$82.00
98Storm sew CL B 2 18 (550B0380)LF502$147.41$59.50
99Storm sewer rem 15 (55100700)LF648$28.47$24.00
100Granular backfill STR (58600101)CY185$109.20$104.00
101Geocomposite wall DR (59100100)SY77$39.90$38.00
102Conc HDWL for P drain (60100060)EACH6$591.15$563.00
103P undr for struct 4 (60146304)LF182$34.65$33.00
104Man TA 4 dia T11F&G (60219300)EACH2$7,498.40$4,550.00
105Inlets TA T1F OL (60234200)EACH1$3,182.42$2,160.00
106Inlets TB T1F CL (60240215)EACH1$4,911.74$2,775.00
107Inlets TB T11F&G (60240310)EACH3$5,191.72$3,050.00
108Inlets TB T11V F&G (60240312)EACH7$5,191.73$3,600.00
109Man adjust (60255500)EACH7$2,493.95$1,100.00
110Man recon new T1F CL (60258200)EACH1$2,736.29$2,600.00
111Inlets adjust (60260100)EACH2$1,357.52$1,100.00
112Inlets adj new T1F CL (60260400)EACH1$3,804.77$1,550.00
113Inlets adj new T3VF&G (60260505)EACH1$2,081.88$1,750.00
114Inlet adj new T11VF&G (60261320)EACH1$2,094.06$1,750.00
115Inl recon new T1F CL (60263000)EACH1$4,046.29$2,425.00
116Remov manholes (60500040)EACH1$1,153.03$2,100.00
117Remov inlets (60500060)EACH10$576.51$625.00
118Comb CC&G TB6.12 (60603800)LF3,275$39.58$49.50
119Comb CC&G TB6.12 VWGF (60604300)LF124$149.84$94.50
120Comb CC&G TY B-6.24 (60605000)LF109$153.88$109.50
121SPBGR TY A 6FT posts (63000001)LF25$109.99$113.50
122Traf bar term T2 (63100045)EACH2$3,942.75$4,075.00
123Traf bar term T6 (63100085)EACH2$6,945.75$7,185.00
124Guardrail remov (63200310)LF238$14.98$9.00
125Perm surv MKRS T1 (66700205)EACH1$651.74$315.00
126Perm surv MKRS T2 (66700305)EACH1$1,279.13$550.00
127Non SPL waste disposl (66900200)CY767$140.65$125.00
128Soil disposal analy (66900530)EACH1$1,522.50$1,600.00
129Reg sub P-const plan (66901001)LS1$2,310.00$2,400.00
130Reg sub F con report (66901003)LS1$2,310.00$2,400.00
131Reg sub mon (66901006)CAL DAY10$1,338.75$1,400.00
132Engr field office A (67000400)CAL MO14$3,394.62$1,975.00
133Mobilization (67100100)LS1$164,504$223,493
134TR cont surveillance (70103815)CAL DAY100$0.01$1.00
135SHRT TRM pavt MK rem (70300150)SF3,730$0.01$3.25
136Temp PVT MK line 4 - paint (70300221)LF11,048$0.01$0.40
137Temp PVT MK line 6 - paint (70300241)LF177$0.01$0.65
138Temp PVT MK line 12 - paint (70300261)LF127$0.01$1.35
139Temp PVT MK line 24 - paint (70300281)LF46$0.01$5.00
140Sign panel T1 (72000100)SF24$42.00$42.00
141Sign panel T2 (72000200)SF10$36.75$57.00
142Terminal marker - DA (72501000)EACH2$52.50$55.00
143Metal post TY A (72900100)LF76$31.50$35.00
144Paint PVT MK line 4 (78001110)LF11,048$0.42$0.45
145Paint PVT MK line 6 (78001130)LF177$0.68$0.70
146Paint PVT MK line 12 (78001150)LF127$1.42$1.45
147Paint PVT MK line 24 (78001180)LF46$5.25$5.50
148Grdrail ref type A (78200005)EACH8$10.50$11.00
IDOT contract 89854: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy