IDOT contract 89859 bid tabulation
Pekin, section 20-00196-01-RS. Let by Illinois DOT on June 13, 2025, Tazewell, District 04. 3 bids received; low bid $4,930,196 by William Charles Construction Company, LLC.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 164
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | William Charles Construction Company, LLC | $4,930,196 | Low |
| 2 | Otto Baum Company, Inc. | $4,944,300 | 0.0% |
| 3 | R. A. Cullinan and Son, a div of UCM, Inc. | $5,887,106 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. William Charles Construction Company, LLC | 2. Otto Baum Company, Inc. | 3. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|---|---|
| 1 | Concrete steps (XX000300) | SF | 22 | $341.80 | $267.27 | $301.56 |
| 2 | Curb stop & box 1 (XX000739) | EACH | 10 | $1,798.50 | $1,275.57 | $666.75 |
| 3 | Ornamental fence (XX001249) | LF | 79 | $230.00 | $238.97 | $236.25 |
| 4 | Stair railing (XX006751) | LF | 13 | $525.00 | $536.36 | $530.25 |
| 5 | Rem exist light pole (XX008662) | EACH | 3 | $3,037.88 | $3,186.28 | $3,150.00 |
| 6 | Rem & rein sign panel (XX008729) | EACH | 19 | $98.53 | $269.41 | $131.25 |
| 7 | Water main abandoned (XX008839) | LS | 1 | $4,434.35 | $23,366 | $11,302 |
| 8 | CCTV dome camera HD (X0320023) | EACH | 1 | $6,582.07 | $6,903.60 | $6,825.00 |
| 9 | Wireless ethernet rad (X0325810) | EACH | 2 | $4,354.29 | $4,567.00 | $4,515.00 |
| 10 | Cat 5 ethernet cable (X0326812) | LF | 163 | $5.06 | $5.31 | $5.25 |
| 11 | Cat 6 ethernet cable (X1400127) | LF | 370 | $6.08 | $6.37 | $6.30 |
| 12 | Explor trench SPL (X2130010) | LF | 24 | $66.20 | $98.77 | $97.65 |
| 13 | PCC sidewalk curb (X4240118) | LF | 55 | $138.97 | $147.78 | $302.02 |
| 14 | Comb curb-SW 4IN SPL (X4240130) | SF | 295 | $31.34 | $36.70 | $33.90 |
| 15 | Foundation rem (X5011100) | EACH | 2 | $715.74 | $979.25 | $716.64 |
| 16 | Conc wall remov (X5012506) | LF | 418 | $25.34 | $13.71 | $12.09 |
| 17 | Water serv connection (X5620112) | EACH | 11 | $865.85 | $1,378.60 | $1,179.15 |
| 18 | Fire hydnt assy comp (X5640150) | EACH | 3 | $11,418 | $12,064 | $9,301.60 |
| 19 | Inlets TG-1 (X6020082) | EACH | 1 | $5,299.36 | $5,193.67 | $7,893.64 |
| 20 | Inlets TG-1 SPL (X6021065) | EACH | 23 | $4,961.37 | $5,332.95 | $7,987.10 |
| 21 | Inl-MN G-1 7D SPL (X6021827) | EACH | 1 | $16,349 | $12,549 | $21,500 |
| 22 | Inlets TA W/SPL F&G (X6023508) | EACH | 1 | $4,666.75 | $4,763.24 | $4,163.25 |
| 23 | Sanitary manhole adj (X6026050) | EACH | 6 | $2,670.66 | $2,257.68 | $1,732.50 |
| 24 | Fill EX storm sewers (X6050205) | CY | 4 | $689.29 | $1,079.72 | $426.30 |
| 25 | Fence removal (X6640104) | LF | 73 | $14.77 | $30.66 | $22.80 |
| 26 | Traf cont & prot SPL (X7010216) | LS | 1 | $55,000 | $52,644 | $69,857 |
| 27 | Light controller SPL (X8250505) | EACH | 1 | $10,633 | $11,152 | $11,025 |
| 28 | FO etn drop repeat SW (X8710050) | EACH | 2 | $1,260.72 | $1,322.30 | $1,307.25 |
| 29 | Accessible ped signal (X8760200) | EACH | 14 | $4,860.61 | $5,098.04 | $5,040.00 |
| 30 | Evp system (X8870300) | EACH | 2 | $14,987 | $15,719 | $15,540 |
| 31 | W A vid veh det sys com (X8891202) | EACH | 2 | $37,973 | $39,828 | $39,375 |
| 32 | Conc step remov (Z0012455) | EACH | 2 | $724.84 | $660.76 | $845.62 |
| 33 | Construction layout (Z0013798) | LS | 1 | $72,000 | $27,609 | $55,944 |
| 34 | TS batt backup system (Z0033068) | EACH | 2 | $10,633 | $11,152 | $11,025 |
| 35 | SS 1 wat MN 8 (Z0056644) | LF | 12 | $157.90 | $154.83 | $147.00 |
| 36 | SS 1 wat MN 12 (Z0056648) | LF | 1,129 | $156.87 | $111.88 | $183.75 |
| 37 | SS 1 wat MN 15 (Z0056650) | LF | 43 | $249.58 | $155.45 | $221.55 |
| 38 | Tree remov over 15 (20100210) | UNIT | 48 | $81.91 | $139.40 | $216.30 |
| 39 | Earth excavation (20200100) | CY | 1,165 | $58.36 | $49.70 | $85.46 |
| 40 | Rem & disp uns matl (20201200) | CY | 634 | $24.62 | $38.27 | $56.62 |
| 41 | Gran embank spec (21000300) | TON | 1,300 | $22.83 | $39.87 | $61.31 |
| 42 | Geotech fab F/GR stab (21001000) | SY | 1,902 | $1.00 | $2.43 | $4.07 |
| 43 | Topsoil F & P 4 (21101615) | SY | 800 | $13.35 | $13.67 | $13.39 |
| 44 | Seeding CL 1A (25000110) | ACRE | 0.25 | $10,234 | $7,774.52 | $15,750 |
| 45 | Nitrogen fert nutr (25000400) | LB | 24 | $13.98 | $10.62 | $8.14 |
| 46 | Phosphorus fert nutr (25000500) | LB | 24 | $13.98 | $10.62 | $8.14 |
| 47 | Potassium fert nutr (25000600) | LB | 24 | $13.98 | $10.62 | $8.14 |
| 48 | Mulch method 1 (25100105) | ACRE | 0.25 | $10,234 | $7,774.52 | $10,500 |
| 49 | Temp eros contr seed (28000250) | LB | 50 | $12.13 | $1.96 | $16.27 |
| 50 | Perimeter eros bar (28000400) | LF | 664 | $3.64 | $4.92 | $13.39 |
| 51 | Inlet filters (28000510) | EACH | 29 | $303.36 | $247.61 | $384.77 |
| 52 | Sub gran mat B 4 (31101200) | SY | 2,388 | $10.84 | $12.67 | $23.96 |
| 53 | Sub gran mat B 6 (31101400) | SY | 101 | $15.64 | $20.35 | $40.95 |
| 54 | Agg base cse A 12 (35101100) | SY | 9,411 | $21.17 | $26.05 | $36.32 |
| 55 | PCC base cse W 8 (35400300) | SY | 56 | $145.79 | $70.74 | $123.50 |
| 56 | Aggregate-temp access (40201000) | TON | 250 | $0.01 | $49.88 | $123.50 |
| 57 | P bit matls tack CT (40600295) | LB | 870 | $1.26 | $1.33 | $8.76 |
| 58 | HMA surf rem butt JT (40600982) | SY | 668 | $15.08 | $15.93 | $26.62 |
| 59 | P HMA SC IL-9.5 D N50 (40604160) | TON | 167 | $321.72 | $339.87 | $244.90 |
| 60 | Incidental HMA surf (40800050) | TON | 68 | $321.72 | $339.87 | $498.16 |
| 61 | PCC PVT 8 1/4 jointd (42000306) | SY | 8,762 | $92.29 | $88.58 | $105.12 |
| 62 | Protective coat (42001300) | SY | 11,706 | $0.01 | $1.64 | $0.01 |
| 63 | PCC driveway pavt 6 (42300200) | SY | 95 | $95.83 | $99.29 | $167.02 |
| 64 | PCC driveway pavt 8 (42300400) | SY | 463 | $101.76 | $100.40 | $147.68 |
| 65 | PC conc sidewalk 4 (42400100) | SF | 15,154 | $9.74 | $12.50 | $14.55 |
| 66 | Detectable warnings (42400800) | SF | 283 | $49.07 | $39.51 | $41.37 |
| 67 | Pavement rem (44000100) | SY | 9,005 | $23.23 | $17.10 | $33.80 |
| 68 | HMA surf rem 2 (44000157) | SY | 485 | $30.33 | $15.93 | $18.33 |
| 69 | Drive pavement rem (44000200) | SY | 406 | $6.58 | $18.29 | $31.76 |
| 70 | Comb curb gutter rem (44000500) | LF | 3,064 | $4.63 | $5.87 | $6.23 |
| 71 | Sidewalk rem (44000600) | SF | 14,623 | $0.84 | $1.33 | $1.62 |
| 72 | Median removal (44003100) | SF | 517 | $3.08 | $3.58 | $8.42 |
| 73 | CL C patch T3 10 (44201357) | SY | 36 | $211.00 | $229.21 | $246.01 |
| 74 | Pipe handrail (50901760) | LF | 95 | $208.00 | $212.42 | $210.00 |
| 75 | Conc STR retain wall (52200900) | CY | 50 | $2,684.21 | $1,376.81 | $1,627.50 |
| 76 | Storm sew CL A 1 12 (550A0050) | LF | 887 | $96.08 | $111.59 | $155.40 |
| 77 | Storm sewer rem 12 (55100500) | LF | 501 | $99.41 | $36.84 | $39.90 |
| 78 | DI wat MN tee, 12X 6 (56100050) | EACH | 1 | $1,526.82 | $3,186.28 | $1,984.50 |
| 79 | DI wat MN tee, 12X 8 (56100055) | EACH | 1 | $1,233.49 | $3,186.28 | $1,716.75 |
| 80 | Water main 6 (56100600) | LF | 72 | $115.25 | $91.34 | $106.02 |
| 81 | Water main 8 (56100700) | LF | 21 | $274.67 | $114.71 | $148.62 |
| 82 | Water main 12 (56100900) | LF | 1,119 | $174.75 | $190.11 | $197.58 |
| 83 | DI wat MN red, 12 X10 (56101162) | EACH | 2 | $1,274.86 | $3,929.75 | $1,603.88 |
| 84 | Water valves 12 (56105200) | EACH | 1 | $5,661.47 | $8,496.74 | $4,646.25 |
| 85 | Tap valve & sleeve 6 (56108800) | EACH | 1 | $14,785 | $8,284.32 | $8,638.88 |
| 86 | Tap valve & sleeve 8 (56108900) | EACH | 1 | $17,839 | $9,059.65 | $9,778.13 |
| 87 | Tap valve & sleeve 10 (56109000) | EACH | 2 | $21,648 | $14,338 | $5,545.32 |
| 88 | DI WT MNF 6 11.25 DB (56109398) | EACH | 1 | $1,276.11 | $1,805.56 | $929.25 |
| 89 | DI WT MNF 6 45.0 DB (56109418) | EACH | 1 | $481.36 | $1,805.56 | $950.25 |
| 90 | DI WT MNF 8 45.0 DB (56109420) | EACH | 4 | $645.58 | $1,288.32 | $270.38 |
| 91 | DI WT MNF 12 45.0 DB (56109424) | EACH | 18 | $1,288.64 | $2,434.32 | $606.08 |
| 92 | DI WT MNF 12 90.0 DB (56109438) | EACH | 1 | $1,476.68 | $2,867.65 | $1,916.25 |
| 93 | Water serv line 1 (56200300) | LF | 345 | $135.51 | $60.54 | $84.34 |
| 94 | Water serv line 6 (56201160) | LF | 61 | $147.46 | $162.50 | $117.21 |
| 95 | Fire hydnts to BE rem (56400500) | EACH | 3 | $1,220.98 | $1,190.61 | $1,596.00 |
| 96 | Dom wat ser box (56500800) | EACH | 10 | $1,401.30 | $1,275.57 | $1,753.50 |
| 97 | Contr low-streng matl (59300100) | CY | 845 | $0.01 | $113.53 | $121.77 |
| 98 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $5,012.11 | $5,037.83 | $7,668.15 |
| 99 | Man TA 5 dia T1F CL (60221100) | EACH | 3 | $7,172.35 | $6,826.16 | $9,471.00 |
| 100 | Man TA 6 dia T1F CL (60223800) | EACH | 1 | $13,147 | $8,884.75 | $13,493 |
| 101 | Inlets TA T8G (60236200) | EACH | 1 | $3,726.34 | $2,704.13 | $4,047.75 |
| 102 | Inlets TB T11F&G (60240310) | EACH | 2 | $4,431.02 | $4,514.13 | $5,074.65 |
| 103 | Remov inlets (60500060) | EACH | 13 | $1,620.65 | $450.22 | $626.85 |
| 104 | Conc curb TB (60600605) | LF | 67 | $71.27 | $91.04 | $272.96 |
| 105 | Comb CC&G TB6.12 (60603800) | LF | 3,050 | $59.29 | $53.08 | $70.37 |
| 106 | Storm sewer spec 8 (61140000) | LF | 13 | $171.70 | $125.49 | $171.15 |
| 107 | Engr field office B (67000500) | CAL MO | 10 | $4,450.00 | $1,595.08 | $3,647.15 |
| 108 | Mobilization (67100100) | LS | 1 | $300,000 | $300,000 | $358,020 |
| 109 | Changeable message SN (70107025) | CAL DAY | 120 | $90.00 | $90.28 | $89.25 |
| 110 | SHRT TRM pavt MK rem (70300150) | SF | 3,496 | $1.20 | $1.17 | $1.16 |
| 111 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 302 | $10.50 | $10.89 | $10.76 |
| 112 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,083 | $1.55 | $1.54 | $1.52 |
| 113 | Temp PVT MK L6 T4 tape (70307130) | LF | 690 | $2.50 | $2.55 | $2.52 |
| 114 | Temp PVT MK L8 T4 tape (70307140) | LF | 1,840 | $3.05 | $3.13 | $3.10 |
| 115 | Temp PVT MK L12 T4 tape (70307160) | LF | 68 | $4.50 | $4.67 | $4.62 |
| 116 | Temp PVT MK L24 T4 tape (70307210) | LF | 265 | $9.00 | $9.24 | $9.14 |
| 117 | Sign panel T1 (72000100) | SF | 52 | $36.19 | $69.26 | $68.47 |
| 118 | Sign panel T2 (72000200) | SF | 105 | $48.26 | $95.59 | $94.50 |
| 119 | Teles STL sin support (72800100) | LF | 152 | $14.08 | $30.80 | $30.45 |
| 120 | Mod ureth PM LTR-sym (78009000) | SF | 302 | $9.05 | $6.85 | $6.77 |
| 121 | Mod ureth PM line 4 (78009004) | LF | 3,083 | $1.26 | $2.24 | $2.22 |
| 122 | Mod ureth PM line 6 (78009006) | LF | 690 | $2.01 | $3.36 | $3.32 |
| 123 | Mod ureth PM line 8 (78009008) | LF | 1,840 | $3.27 | $4.48 | $4.43 |
| 124 | Mod ureth PM line 12 (78009012) | LF | 68 | $7.54 | $6.72 | $6.65 |
| 125 | Mod ureth PM line 24 (78009024) | LF | 265 | $9.05 | $13.28 | $13.13 |
| 126 | Elect serv install (80400100) | EACH | 1 | $15,189 | $15,931 | $15,750 |
| 127 | Serv install TY A (80500100) | EACH | 2 | $12,658 | $13,276 | $13,125 |
| 128 | Undrgrd C PVC 2 (81028350) | LF | 158 | $58.73 | $61.60 | $60.90 |
| 129 | Undrgrd C PVC 3 (81028370) | LF | 92 | $61.77 | $64.79 | $64.05 |
| 130 | Undrgrd C PVC 4 (81028390) | LF | 592 | $70.88 | $74.35 | $73.50 |
| 131 | Undrgrd C CNC 1 (81028720) | LF | 1,000 | $45.57 | $47.79 | $47.25 |
| 132 | Handhole (81400100) | EACH | 6 | $3,544.19 | $3,717.32 | $3,675.00 |
| 133 | DBL handhole (81400300) | EACH | 2 | $5,012.50 | $5,257.36 | $5,197.50 |
| 134 | Handhole PCC (81400700) | EACH | 2 | $3,544.19 | $3,717.33 | $3,675.00 |
| 135 | EC C XLP use 1C 10 (81702110) | LF | 10,673 | $5.06 | $5.31 | $5.25 |
| 136 | EC C XLP use 3-1C 6 (81702415) | LF | 33 | $12.15 | $12.75 | $12.60 |
| 137 | Lum LED rdwy E (82110005) | EACH | 5 | $911.36 | $955.88 | $945.00 |
| 138 | Lum LED rdwy G (82110007) | EACH | 15 | $961.99 | $1,008.99 | $997.50 |
| 139 | LT P A 30MH 6MA (83006200) | EACH | 5 | $5,923.86 | $6,213.24 | $6,142.50 |
| 140 | Light pole FDN 24D (83600200) | LF | 25 | $379.73 | $398.28 | $393.75 |
| 141 | Bkwy dev TR B 11.5BC (83800105) | EACH | 20 | $1,772.10 | $1,858.66 | $1,837.50 |
| 142 | Fac T4 cab (85700200) | EACH | 2 | $28,860 | $30,270 | $29,925 |
| 143 | Elcbl C signal 14 3C (87301225) | LF | 1,267 | $4.05 | $4.25 | $4.20 |
| 144 | Elcbl C signal 14 5C (87301245) | LF | 3,317 | $5.06 | $5.31 | $5.25 |
| 145 | Elcbl C signal 14 7C (87301255) | LF | 3,694 | $6.08 | $6.37 | $6.30 |
| 146 | Elcbl C signal 20 3C (87301295) | LF | 1,267 | $7.09 | $7.43 | $7.35 |
| 147 | Elcbl C egrdc 6 1C (87301900) | LF | 1,110 | $8.10 | $8.50 | $8.40 |
| 148 | TS post galvs 10 (87502440) | EACH | 1 | $4,050.50 | $4,248.37 | $4,200.00 |
| 149 | TS post galvs 15 (87502490) | EACH | 8 | $4,075.82 | $4,274.92 | $4,226.25 |
| 150 | STL comb maa&P 34 (87702900) | EACH | 4 | $28,860 | $30,270 | $29,925 |
| 151 | STL comb maa&P 40 (87702930) | EACH | 2 | $31,898 | $33,456 | $33,075 |
| 152 | STL comb maa&P 52 (87702985) | EACH | 1 | $36,004 | $37,763 | $37,333 |
| 153 | Conc FDN TY A (87800100) | LF | 27 | $349.36 | $366.42 | $362.25 |
| 154 | Conc FDN TY C (87800150) | LF | 8 | $658.21 | $690.36 | $682.50 |
| 155 | Conc FDN TY E 36D (87800415) | LF | 85 | $708.84 | $743.46 | $735.00 |
| 156 | SH P LED 1F 3S BM (88040070) | EACH | 10 | $961.99 | $1,008.99 | $997.50 |
| 157 | SH P LED 1F 3S mam (88040090) | EACH | 15 | $961.99 | $1,008.99 | $997.50 |
| 158 | SH P LED 1F 4S BM (88040110) | EACH | 4 | $1,164.52 | $1,221.41 | $1,207.50 |
| 159 | SH P LED 1F 4S mam (88040120) | EACH | 4 | $1,164.52 | $1,221.41 | $1,207.50 |
| 160 | Ped SH LED 1F BM CDT (88102717) | EACH | 14 | $762.51 | $799.76 | $790.65 |
| 161 | TS backplate ret-refl (88200510) | EACH | 33 | $354.42 | $371.73 | $367.50 |
| 162 | Light detector (88700200) | EACH | 7 | $2,227.78 | $2,336.60 | $2,310.00 |
| 163 | Temp TR sig install (89000100) | EACH | 2 | $42,024 | $44,077 | $43,575 |
| 164 | Remov EX TS equip (89502375) | EACH | 2 | $18,734 | $23,041 | $22,292 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.