IDOT contract 99687 bid tabulation

Project Number: Iu4T-842- / /, section 19-00156-00-SP. Let by Illinois DOT on January 17, 2025, Williamson, District 09. 2 bids received; low bid $2,026,739 by Samron Midwest Contracting, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
63
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Samron Midwest Contracting, Inc.$2,026,739Low
2E. T. Simonds Construction Company$2,089,819+3.0%
IDOT contract 99687: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Samron Midwest Contracting, Inc.2. E. T. Simonds Construction Company
1Weed barrier fabric (X0321501)SY160$4.00$8.24
2Landscaping gravel (X0323117)SY160$25.00$43.26
3Stamp CLRD PCC med 4 (X1700011)SF3,631$8.24$16.84
4Stamped CLRDPCCPVT8J (X4200468)SY1,313$0.01$170.87
5Inlets SPL (X6024240)EACH6$6,000.00$5,726.70
6Conc median surf 4 SP (X6061310)SF5,282$7.00$8.18
7Comb CC&G TM SPL (X6061815)LF423$70.00$46.40
8Traf cont & prot SPL (X7010216)LS1$61,000$3,672.90
9Changeable MSG SN SPL (X7010239)CAL WK12$900.00$288.75
10Construction layout (Z0013798)LS1$61,500$22,494
11Tree remov acres (20100500)ACRE1$10,900$24,042
12Earth excavation (20200100)CY3,713$15.00$9.33
13Rem & disp uns matl (20201200)CY1,196$16.00$17.85
14Furnished excavation (20400800)CY4,733$13.00$17.82
15Trench backfill (20800150)CY98$55.00$55.31
16Seeding CL 2A (25000210)ACRE1.70$7,500.00$1,751.00
17Nitrogen fert nutr (25000400)LB153$2.00$3.09
18Phosphorus fert nutr (25000500)LB153$2.00$3.09
19Potassium fert nutr (25000600)LB153$2.00$3.09
20Agr ground limestone (25000700)TON3.50$105.00$206.00
21Mulch method 2 (25100115)ACRE1.70$2,000.00$1,236.00
22Erosion contr blanket (25100630)SY6,585$2.00$1.49
23Temp eros contr seed (28000250)LB346$2.50$2.50
24Temp ditch checks (28000305)LF150$5.00$13.80
25Perimeter eros bar (28000400)LF3,566$4.00$4.61
26Inlet & pipe protect (28000500)EACH6$100.00$135.21
27Stone riprap CL A4 (28100107)SY18$95.00$60.30
28Filter fabric (28200200)SY18$50.00$6.31
29Agg subgrade improve (30300001)CY3,810$55.00$47.48
30Agg base cse A 12 (35101100)SY9,322$20.00$19.62
31PCC PVT 8 jointed (42000301)SY6,657$68.00$81.94
32Protective coat (42001300)SY8,961$0.01$0.01
33Pavement rem (44000100)SY4,950$10.00$6.31
34Pipe culvert remov (50105220)LF249$15.00$8.26
35P cul CL A 1 24 (542A0229)LF100$95.00$116.26
36P cul CL A 1 30 (542A0235)LF63$125.00$155.81
37P cul CL D 1 18 (542D0223)LF77$45.00$44.35
38PRC flar end sec 24 (54213669)EACH5$2,675.00$1,551.87
39PRC flar end sec 30 (54213675)EACH2$3,000.00$2,171.05
40Storm sew CL A 1 24 (550A0120)LF370$98.00$119.33
41Man TA 4 dia T1F CL (60218400)EACH1$3,350.00$3,422.37
42Man TA 4 dia T3F&G (60218500)EACH10$3,800.00$3,672.31
43Inlets TB T8G (60240301)EACH1$2,800.00$2,516.69
44Conc curb TB (60600605)LF213$45.00$48.03
45Comb CC&G TY B-6.24 (60605000)LF3,722$65.00$52.76
46Fur erect row markers (66600105)EACH12$300.00$180.25
47Mobilization (67100100)LS1$120,000$46,133
48Sign panel T1 (72000100)SF213$26.00$30.90
49Sign panel T3 (72000300)SF162$62.00$82.40
50Metal post TY B (72900200)LF81$17.00$23.69
51Wood sin support (73000100)LF446$30.00$28.84
52Mod ureth PM LTR-sym (78009000)SF103$9.00$7.87
53Mod ureth PM line 4 (78009004)LF6,844$3.00$2.63
54Mod ureth PM line 12 (78009012)LF398$9.00$7.73
55Mod ureth PM line 18 (78009018)LF41$16.00$14.42
56Elect serv install (80400100)EACH1$7,800.00$7,405.48
57Undrgrd C CNC 2 (81028750)LF313$25.00$23.00
58UD 2#10#10GXLPUSE 3/4 (81603010)LF652$18.00$12.46
59Lum LED rdwy G (82110007)EACH7$1,000.00$1,029.76
60LT cont PM 240V 30 (82500300)EACH1$11,000$7,787.93
61LT P A 35MH 15DA (83001600)EACH7$4,300.00$5,001.76
62LP F M 15BC 8 5/8X6 (83600356)EACH7$1,780.00$1,097.52
63Bkwy dev cou SS SCRN (83800650)EACH7$1,750.00$301.93
IDOT contract 99687: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy