IDOT contract 99742 bid tabulation
Project Number: R0G8-173 / /, section 22-00086-00-BR. Let by Illinois DOT on January 16, 2026, Alexander, District 09. 2 bids received; low bid $6,077,049 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 60
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $6,077,049 | Low |
| 2 | E. T. Simonds Construction Company | $6,623,113 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Bar terminators (X5080530) | EACH | 392 | $23.00 | $24.69 |
| 2 | Drainage scuppr DS-12 (X5230176) | EACH | 6 | $2,700.00 | $2,906.78 |
| 3 | SPBGR (short radius) (X6330725) | LF | 88 | $60.00 | $59.40 |
| 4 | Temp constr fence (X6640638) | LF | 150 | $11.00 | $10.64 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $21,500 | $19,573 |
| 6 | Change message SN SPL (X7010238) | CAL MO | 50 | $2,900.00 | $965.96 |
| 7 | Approach slab rem (Z0004552) | SY | 200 | $55.00 | $31.76 |
| 8 | Construction layout (Z0013798) | LS | 1 | $28,000 | $45,291 |
| 9 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 |
| 10 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 |
| 11 | Earth excavation (20200100) | CY | 5 | $120.00 | $202.16 |
| 12 | Furnished excavation (20400800) | CY | 90 | $120.00 | $58.23 |
| 13 | Seeding CL 2 (25000200) | ACRE | 0.10 | $30,000 | $25,300 |
| 14 | Nitrogen fert nutr (25000400) | LB | 5.80 | $13.40 | $1.82 |
| 15 | Phosphorus fert nutr (25000500) | LB | 5.80 | $13.40 | $1.82 |
| 16 | Potassium fert nutr (25000600) | LB | 5.80 | $13.40 | $1.82 |
| 17 | Agr ground limestone (25000700) | TON | 0.10 | $8,344.00 | $880.00 |
| 18 | Erosion contr blanket (25100630) | SY | 312 | $4.46 | $7.43 |
| 19 | Perimeter eros bar (28000400) | LF | 765 | $3.50 | $9.56 |
| 20 | Stone riprap CL A4 (28100107) | SY | 162 | $60.00 | $75.04 |
| 21 | Filter fabric (28200200) | SY | 162 | $3.50 | $3.95 |
| 22 | Agg surf course TY B (40200800) | TON | 600 | $32.00 | $55.11 |
| 23 | Bit matls tack CT (40600290) | LB | 440 | $2.56 | $0.01 |
| 24 | HMA surf rem butt JT (40600982) | SY | 80 | $15.00 | $28.32 |
| 25 | Temporary ramp (40600990) | SY | 20 | $29.00 | $77.13 |
| 26 | HMA BC IL-9.5 N70 (40602985) | TON | 90 | $112.00 | $197.36 |
| 27 | HMA BC IL-19.0 N70 (40603085) | TON | 140 | $112.00 | $192.56 |
| 28 | HMA SC IL-9.5 C N70 (40604052) | TON | 70 | $112.00 | $202.65 |
| 29 | Aggregate SHLDS B 6 (48101500) | SY | 93 | $20.00 | $30.92 |
| 30 | Rem exist struct (50100100) | EACH | 1 | $200,000 | $188,540 |
| 31 | Structure excavation (50200100) | CY | 247 | $59.00 | $40.20 |
| 32 | Cofferdam excavation (50200300) | CY | 2,026 | $55.00 | $69.23 |
| 33 | Cofferdam typ 2 loc 1 (50201121) | EACH | 1 | $420,000 | $377,733 |
| 34 | Cofferdam typ 2 loc 2 (50201122) | EACH | 1 | $420,000 | $385,026 |
| 35 | Conc struct (50300225) | CY | 988.10 | $700.00 | $1,228.38 |
| 36 | Conc sup-STR (50300255) | CY | 527 | $1,350.00 | $1,487.77 |
| 37 | BR deck grooving (50300260) | SY | 1,280 | $10.00 | $12.93 |
| 38 | Seal coat conc (50300265) | CY | 409.20 | $258.00 | $299.71 |
| 39 | Protective coat (50300300) | SY | 1,783 | $1.50 | $2.02 |
| 40 | F & E struct steel (50500105) | LS | 1 | $1,309,000 | $1,241,910 |
| 41 | Stud shear connectors (50500505) | EACH | 5,664 | $4.00 | $3.80 |
| 42 | Reinf bars, epoxy CTD (50800205) | LB | 304,830 | $1.40 | $1.43 |
| 43 | Mechanical splicers (50800530) | EACH | 612 | $133.00 | $135.99 |
| 44 | Fur STL pile HP14X117 (51202100) | LF | 5,243 | $137.00 | $142.68 |
| 45 | Driving piles (51202305) | LF | 5,243 | $0.01 | $0.01 |
| 46 | Test pile ST HP14X117 (51204100) | EACH | 5 | $8,000.00 | $12,894 |
| 47 | Pile shoes (51204650) | EACH | 90 | $200.00 | $181.50 |
| 48 | Name plates (51500100) | EACH | 1 | $1,000.00 | $1,399.93 |
| 49 | Anchor bolts 1 (52100520) | EACH | 16 | $160.00 | $157.30 |
| 50 | Anchor bolts 1 1/4 (52100530) | EACH | 16 | $180.00 | $141.72 |
| 51 | Anchor bolts 1 1/2 (52100540) | EACH | 8 | $212.00 | $149.35 |
| 52 | Contr low-streng matl (59300100) | CY | 168 | $228.00 | $251.43 |
| 53 | SPBGR TY A 6FT posts (63000001) | LF | 113 | $40.00 | $38.50 |
| 54 | Traf bar term T5 (63100070) | EACH | 4 | $1,800.00 | $1,705.00 |
| 55 | TR bar TRM T1 SPL tan (63100167) | EACH | 1 | $4,500.00 | $4,400.00 |
| 56 | Guardrail remov (63200310) | LF | 258 | $10.00 | $13.58 |
| 57 | Mobilization (67100100) | LS | 1 | $360,000 | $393,187 |
| 58 | Terminal marker - DA (72501000) | EACH | 1 | $56.00 | $55.00 |
| 59 | Paint PVT MK line 4 (78001110) | LF | 1,500 | $3.00 | $5.50 |
| 60 | Grdrail ref type B (78200006) | EACH | 8 | $11.00 | $11.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.