INDOT contract B-42175-A bid tabulation
REPLACE SUPERSTRUCTURE AND BRIDGE DECK OVERLAY. Let by Indiana DOT on January 15, 2025, Knox, Sullivan, Vincennes. 5 bids received; low bid $3,580,877 by CLR Inc.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 137
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | CLR Inc | $3,580,877 | Low |
| 2 | Ragle, Inc. | $3,659,211 | +2.0% |
| 3 | Milestone Contractors LP | $3,917,175 | +9.0% |
| 4 | Pontem Contractors Inc | $4,104,545 | +15% |
| 5 | American Contracting & Services Inc | $4,457,272 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. CLR Inc | 2. Ragle, Inc. | 3. Milestone Contractors LP | 4. Pontem Contractors Inc | 5. American Contracting & Services Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $75,000 | $22,500 | $28,200 | $20,000 | $50,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 4 | $300.00 | $850.00 | $1,583.33 | $650.43 | $750.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $179,000 | $182,000 | $196,500 | $205,000 | $222,864 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $10,000 | $73,000 | $79,000 | $80,000 | $89,145 |
| 0014 | Debris, remove, structure no. 2 (201-90788) | LS | 1 | $2,400.00 | $2,000.00 | $4,369.34 | $10,000 | $7,000.00 |
| 0015 | Pavement removal (202-02240) | SYS | 945 | $60.00 | $30.00 | $45.40 | $39.93 | $60.00 |
| 0016 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $145,000 | $95,000 | $128,484 | $215,000 | $143,000 |
| 0017 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $9,500.00 | $38,500 | $21,829 | $75,000 | $5,000.00 |
| 0018 | Present structure, remove portions, structure no. 3 (202-51328) | LS | 1 | $229,000 | $136,000 | $205,193 | $200,000 | $257,000 |
| 0019 | Excavation, common (203-02000) | CYS | 671 | $50.00 | $48.25 | $50.00 | $126.84 | $125.00 |
| 0020 | Excavation, unclassified (203-02020) | CYS | 55 | $28.00 | $82.50 | $64.00 | $114.75 | $150.00 |
| 0021 | Pump around (205-11626) | EACH | 1 | $25,000 | $12,500 | $15,000 | $30,000 | $30,000 |
| 0022 | Stormwater management budget (205-12108) | DOL | 61,195 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $2,500.00 | $17,500 | $6,703.84 | $15,000 | $85,000 |
| 0025 | Subgrade treatment, type IC (207-09935) | SYS | 708 | $42.00 | $64.50 | $55.00 | $37.87 | $90.00 |
| 0026 | Aggregate for end bent backfill (211-06467) | CYS | 36 | $120.00 | $145.00 | $190.00 | $143.11 | $150.00 |
| 0027 | Structure backfill, type 4 (211-09267) | CYS | 20 | $365.00 | $325.00 | $200.00 | $365.88 | $550.00 |
| 0028 | Flowable backfill, non- removable (213-09269) | CYS | 4 | $500.00 | $325.00 | $1,676.57 | $438.97 | $1,500.00 |
| 0029 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,400 | $5.00 | $4.50 | $4.87 | $4.27 | $4.00 |
| 0030 | Subbase for PCCP (302-06464) | CYS | 180 | $175.00 | $165.00 | $300.00 | $195.22 | $155.00 |
| 0031 | Compacted aggregate, no. 53 (303-01180) | TON | 269 | $100.00 | $68.50 | $90.53 | $58.91 | $75.00 |
| 0032 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 660 | $11.00 | $3.00 | $22.00 | $5.44 | $20.00 |
| 0033 | Milling, transition (306-08043) | SYS | 1,018 | $10.00 | $3.00 | $25.00 | $4.18 | $20.00 |
| 0034 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 176 | $270.00 | $244.00 | $285.70 | $263.52 | $244.00 |
| 0035 | QC/QA-HMA, 4, 58S, surface, 9.5 MM (401-000003) | TON | 23 | $888.00 | $802.00 | $511.00 | $866.16 | $802.00 |
| 0036 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 97 | $275.00 | $210.00 | $271.80 | $226.80 | $210.00 |
| 0037 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 228 | $235.00 | $185.00 | $189.80 | $199.80 | $185.00 |
| 0038 | Joint adhesive, surface (401-10258) | LFT | 1,511 | $2.50 | $2.50 | $4.60 | $2.70 | $2.50 |
| 0039 | Joint adhesive, intermediate (401-10259) | LFT | 673 | $2.55 | $2.55 | $7.70 | $2.75 | $2.55 |
| 0040 | Liquid asphalt sealant , rpe (401-11785) | LFT | 1,711 | $0.01 | $0.01 | $7.70 | $0.01 | $0.01 |
| 0041 | Asphalt for tack coat (406-05521) | SYS | 3,048 | $0.45 | $0.45 | $0.20 | $0.49 | $0.45 |
| 0042 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 1 | $1,240.00 | $1,550.00 | $2,200.00 | $1,674.00 | $1,550.00 |
| 0044 | Joints in PCCP, saw and seal (507-08272) | LFT | 86 | $35.00 | $12.00 | $11.63 | $23.56 | $30.00 |
| 0045 | Guardrail transition, type TGB (601-01522) | EACH | 2 | $3,000.00 | $2,660.00 | $2,660.00 | $2,872.80 | $2,660.00 |
| 0046 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 1 | $3,100.00 | $2,800.00 | $2,800.00 | $3,024.00 | $2,800.00 |
| 0047 | Guardrail, remove (601-02241) | LFT | 794 | $6.00 | $5.50 | $5.50 | $5.94 | $5.50 |
| 0048 | Guardrail terminal system, W-beam curved, type 7 (601-05071) | EACH | 1 | $3,900.00 | $3,600.00 | $3,600.00 | $3,888.00 | $3,600.00 |
| 0049 | Guardrail, reset (601-06035) | LFT | 350 | $8.00 | $12.00 | $12.00 | $12.96 | $12.00 |
| 0050 | Hand dig guardrail post holes (601-09238) | EACH | 2 | $225.00 | $200.00 | $200.00 | $216.00 | $200.00 |
| 0051 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $940.00 | $850.00 | $850.00 | $918.00 | $850.00 |
| 0052 | Guardrail transition, MGS without curb (601-12292) | EACH | 6 | $3,000.00 | $2,675.00 | $2,675.00 | $2,889.00 | $2,675.00 |
| 0053 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,300.00 | $3,000.00 | $3,000.00 | $3,240.00 | $3,000.00 |
| 0054 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 12.50 | $40.00 | $28.00 | $28.00 | $30.24 | $28.00 |
| 0055 | Barrier delineator (602-06729) | EACH | 20 | $100.00 | $20.00 | $17.41 | $35.25 | $50.00 |
| 0056 | Milled HMA corrugations, conventional (606-12399) | LFT | 200 | $31.00 | $25.00 | $22.00 | $23.76 | $55.00 |
| 0057 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 710.20 | $215.00 | $195.00 | $200.00 | $229.99 | $250.00 |
| 0058 | Benchmark post (615-06530) | EACH | 1 | $1,050.00 | $1,500.00 | $1,000.00 | $1,620.00 | $2,000.00 |
| 0059 | Riprap, class 1 (616-05688) | TON | 120 | $138.00 | $110.00 | $165.00 | $200.07 | $120.00 |
| 0060 | Riprap, revetment (616-06405) | TON | 2,047 | $73.00 | $66.50 | $150.00 | $75.99 | $110.00 |
| 0061 | Riprap, uniform (616-06451) | TON | 9 | $200.00 | $71.50 | $200.00 | $300.55 | $230.00 |
| 0062 | Geotextile for riprap, type 1A (616-12246) | SYS | 2,267 | $5.25 | $4.00 | $3.00 | $4.58 | $3.00 |
| 0063 | Geotextile for riprap, type 2A (616-12248) | SYS | 766 | $4.75 | $4.00 | $4.00 | $5.03 | $4.00 |
| 0064 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $350.00 | $1,150.00 | $500.00 | $1,242.00 | $1,150.00 |
| 0065 | Erosion control blanket (621-02770) | SYS | 374 | $2.25 | $3.33 | $2.00 | $3.60 | $3.33 |
| 0066 | Seed mixture, native (621-03909) | LBS | 5 | $620.00 | $494.00 | $700.00 | $533.52 | $494.00 |
| 0067 | Mulched seeding, type R (621-06559) | SYS | 1,043 | $7.50 | $4.65 | $5.00 | $5.02 | $4.65 |
| 0068 | Sodding (621-06574) | SYS | 164 | $20.00 | $43.00 | $30.00 | $62.83 | $38.00 |
| 0069 | Seed mixture, floodplain (621-12612) | LBS | 7 | $975.00 | $430.00 | $1,100.00 | $464.40 | $430.00 |
| 0070 | Computer system equipment (628-11976) | EACH | 2 | $100.00 | $750.00 | $1,320.67 | $715.46 | $2,000.00 |
| 0071 | Field office, type D (628-12683) | MOS | 20 | $1,200.00 | $2,250.00 | $3,100.00 | $3,398.82 | $4,500.00 |
| 0072 | Cored hole in concrete (702-03607) | EACH | 4 | $885.00 | $425.00 | $54.00 | $859.41 | $1,000.00 |
| 0073 | Concrete, A, substructure (702-51005) | CYS | 35.80 | $1,975.00 | $2,350.00 | $2,000.00 | $1,285.44 | $1,210.00 |
| 0074 | Field drilled hole in concrete (702-51863) | EACH | 45 | $35.00 | $28.00 | $16.00 | $21.49 | $30.00 |
| 0075 | Concrete, C, substructure (702-92857) | CYS | 4 | $2,700.00 | $2,650.00 | $6,711.29 | $4,189.89 | $1,900.00 |
| 0076 | Reinforcing bars (703-06028) | LBS | 8,620 | $1.26 | $1.85 | $1.45 | $1.39 | $1.40 |
| 0077 | Reinforcing bars, epoxy coated (703-06029) | LBS | 159,933 | $1.42 | $1.90 | $1.50 | $1.34 | $1.50 |
| 0078 | Embedded galvanic anode (703-08247) | EACH | 100 | $30.00 | $30.00 | $40.00 | $37.80 | $35.00 |
| 0079 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 88 | $29.00 | $55.00 | $50.00 | $47.61 | $40.00 |
| 0080 | Concrete, C, superstructure (704-51002) | CYS | 390.70 | $1,375.00 | $1,709.00 | $1,500.00 | $1,513.40 | $1,880.00 |
| 0081 | Railing, concrete type FC (706-09960) | LFT | 147.40 | $145.00 | $110.00 | $110.00 | $118.80 | $110.00 |
| 0082 | Railing, concrete type FC (706-11600) | CYS | 20.20 | $1,175.00 | $1,040.00 | $1,040.00 | $1,123.20 | $1,040.00 |
| 0083 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 12 | $3,125.00 | $2,135.00 | $2,135.00 | $2,305.80 | $2,135.00 |
| 0084 | Railing, concrete type C (706-51020) | CYS | 1 | $1,945.00 | $1,040.00 | $6,876.39 | $5,151.26 | $2,200.00 |
| 0085 | Structural member, concrete, I-beam, 28 in. X 12 in. (707-05982) | LFT | 521 | $470.00 | $500.00 | $483.00 | $433.65 | $545.00 |
| 0086 | Fiber wrap concrete casing system (709-12077) | SFT | 1,010 | $55.00 | $48.00 | $48.00 | $51.84 | $48.00 |
| 0087 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1,500.00 | $2,500.00 | $4,000.00 | $3,477.79 | $7,000.00 |
| 0088 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $2,000.00 | $2,500.00 | $3,140.00 | $3,388.13 | $4,000.00 |
| 0089 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $1,300.00 | $500.00 | $4,000.00 | $3,119.12 | $5,500.00 |
| 0090 | Surface seal , bridge no. 4 (709-51821) | LS | 1 | $1,300.00 | $2,500.00 | $2,950.00 | $3,516.48 | $6,500.00 |
| 0091 | Patching concrete structures (710-09158) | SFT | 314 | $150.00 | $169.00 | $169.00 | $182.52 | $169.00 |
| 0092 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 120 | $17.00 | $20.00 | $26.25 | $11.87 | $40.00 |
| 0093 | Geotextile for underdrains, type 1B (718-12306) | SYS | 98 | $12.00 | $10.50 | $13.86 | $12.89 | $20.00 |
| 0094 | Hydrodemolition (722-01066) | SYS | 1,110 | $158.00 | $150.00 | $130.00 | $158.82 | $155.00 |
| 0095 | Bridge deck overlay budget (722-12380) | DOL | 18,208 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0096 | Bridge deck, remove existing concrete overlay (722-12463) | SYS | 887 | $24.00 | $25.00 | $26.59 | $17.28 | $25.00 |
| 0097 | Bridge deck, remove existing concrete surface (722-12464) | SYS | 224 | $35.00 | $25.00 | $33.21 | $19.21 | $25.00 |
| 0098 | Longitudinal grooving (722-12732) | SYS | 2,654.50 | $5.50 | $6.00 | $3.39 | $12.55 | $13.00 |
| 0099 | Bridge deck patching, full depth (722-51401) | SFT | 510 | $20.00 | $60.00 | $127.63 | $71.60 | $60.00 |
| 0100 | Overlay dam (722-51874) | SFT | 86 | $50.00 | $56.27 | $60.00 | $79.85 | $80.00 |
| 0101 | Bearing assembly, elastomeric (726-92406) | EACH | 30 | $1,575.00 | $850.00 | $80.00 | $1,191.98 | $1,036.84 |
| 0102 | Epoxy injection, crack preparation (727-90308) | LFT | 26 | $110.00 | $56.00 | $56.00 | $60.48 | $56.00 |
| 0103 | Epoxy injection, epoxy material (727-90309) | GAL | 1 | $11.00 | $53.00 | $53.00 | $57.24 | $53.00 |
| 0104 | Epoxy injection, furnishing equipment (727-93560) | LS | 1 | $1,200.00 | $965.00 | $965.00 | $1,042.20 | $965.00 |
| 0105 | Road closure sign assembly (801-04308) | EACH | 19 | $255.00 | $255.00 | $255.00 | $380.16 | $255.00 |
| 0106 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 2,740 | $1.74 | $1.74 | $1.74 | $2.39 | $1.74 |
| 0107 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 24 | $14.00 | $12.11 | $12.11 | $16.87 | $12.11 |
| 0108 | Detour route marker assembly (801-06625) | EACH | 134 | $154.00 | $154.00 | $154.00 | $192.24 | $154.00 |
| 0109 | Construction sign, type A (801-06640) | EACH | 58 | $230.00 | $204.00 | $204.00 | $239.76 | $204.00 |
| 0110 | Construction sign, type B (801-06645) | EACH | 10 | $102.00 | $102.00 | $102.00 | $89.64 | $102.00 |
| 0111 | Maintaining traffic (801-06775) | LS | 1 | $56,320 | $86,500 | $36,882 | $87,076 | $80,000 |
| 0112 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $8,450.00 | $6,400.00 | $6,400.00 | $6,912.00 | $15,000 |
| 0113 | Barricade, type III-A (801-07118) | LFT | 336 | $13.90 | $15.44 | $15.44 | $15.12 | $15.44 |
| 0114 | Barricade, type III-B (801-07119) | LFT | 264 | $13.90 | $15.44 | $15.44 | $17.28 | $15.44 |
| 0115 | Temporary traffic barrier, type 2 (801-08401) | LFT | 680 | $37.00 | $30.00 | $71.28 | $34.28 | $48.50 |
| 0116 | Portable signal (801-12081) | LS | 1 | $25,000 | $50,000 | $16,872 | $51,588 | $20,000 |
| 0117 | Temporary buzz strips (801-97643) | LFT | 864 | $21.00 | $21.25 | $21.25 | $28.78 | $21.26 |
| 0118 | Reference post (802-04893) | EACH | 1 | $250.00 | $234.00 | $234.00 | $252.72 | $234.00 |
| 0119 | Sign, ground mounted, reset (802-91122) | EACH | 3 | $365.00 | $333.00 | $333.00 | $359.64 | $333.00 |
| 0120 | Line, remove (808-06716) | LFT | 2,740 | $0.56 | $0.56 | $0.56 | $1.18 | $0.56 |
| 0121 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 450 | $1.50 | $1.34 | $1.34 | $2.16 | $2.00 |
| 0122 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 450 | $1.50 | $1.34 | $1.34 | $2.16 | $2.00 |
| 0123 | Grooving for pavement markings (808-12032) | LFT | 400 | $1.30 | $1.21 | $1.21 | $20.66 | $1.21 |
| 0124 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 61 | $1.25 | $1.11 | $1.11 | $14.02 | $1.11 |
| 0125 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 560 | $1.00 | $0.94 | $0.94 | $2.91 | $0.94 |
| 0126 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 2,520 | $1.20 | $1.06 | $1.06 | $1.98 | $1.06 |
| 0127 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 243 | $1.00 | $0.94 | $0.94 | $2.93 | $0.94 |
| 0128 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 960 | $1.20 | $1.06 | $1.06 | $1.95 | $1.06 |
| 0129 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 14 | $17.00 | $14.40 | $14.84 | $12.81 | $14.84 |
| 0130 | Pavement message marking, thermoplastic, RXR (808-75340) | EACH | 1 | $1,200.00 | $1,089.00 | $1,089.00 | $1,205.28 | $1,089.00 |
| 0131 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 27 | $70.00 | $19.59 | $60.00 | $15.36 | $50.00 |
| 0132 | Snowplowable raised pavement marker (808-75998) | EACH | 6 | $280.00 | $192.00 | $192.00 | $135.00 | $192.00 |
| 0133 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 315 | $1.40 | $1.26 | $1.26 | $5.78 | $1.26 |
| 0134 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,110 | $140.33 | $155.00 | |||
| 0135 | Bridge deck overlay, silica fume modified (722-01061) | SYS | 1,110 | $145.00 | $130.00 | $157.98 | ||
| 0136 | Cofferdam , structure no. 1 (206-51235) | LS | 1 | $10,000 | $15,000 | $24,398 | $66,514 | $50,000 |
| 0137 | Cofferdam , structure no. 2 (206-51235) | LS | 1 | $2,500.00 | $15,000 | $22,027 | $60,915 | $50,000 |
| 0138 | Terminal joint, retrofit polymer modified asphalt (503-12480) | SFT | 70 | $225.00 | $150.00 | $152.19 | $90.37 | $250.00 |
| 0139 | Cofferdam , structure no. 3 (206-51235) | LS | 1 | $10,000 | $15,000 | $23,150 | $65,812 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.