INDOT contract B-43647-A bid tabulation

BRIDGE REHABILITATION OR REPAIR. Let by Indiana DOT on September 10, 2025, Harrison, Seymour. 4 bids received; low bid $1,249,512 by Force Construction Co Inc.

Owner
Indiana DOT
Letting
10 SEP 2025
Pay items
65
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Force Construction Co Inc$1,249,512Low
2E & B Paving LLC$1,275,500+2.0%
3Ragle, Inc.$1,355,747+9.0%
4Milestone Contractors LP$1,593,000+27%
INDOT contract B-43647-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Force Construction Co Inc2. E & B Paving LLC3. Ragle, Inc.4. Milestone Contractors LP
0001Construction engineering (105-06845)LS1$16,110$35,000$10,000$15,500
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$110,000$63,775$67,500$79,500
0010Clearing right-of-way (201-52370)LS1$31,650$25,510$22,000$24,000
0011Pavement removal (202-02240)SYS154$36.00$20.00$60.70$116.00
0012Present structure, remove portions, structure no. 31-00025 (202-51328)LS1$99,900$135,272$125,000$260,114
0013Excavation, common (203-02000)CYS360$62.00$125.00$96.00$98.00
0014Stormwater management budget (205-12108)DOL11,590$1.00$1.00$1.00$1.00
0015Stormwater management implementation (205-12616)LS1$7,009.00$12,500$7,500.00$5,800.00
0016Cofferdam (206-51235)LS1$22,710$20,000$13,000$21,000
0017Subgrade treatment, type IC (207-09935)SYS466$45.00$50.00$61.35$58.00
0018Geotextile for pavement, type 2B (214-12239)SYS466$7.00$3.40$6.20$6.25
0019Compacted aggregate, no. 53 (301-12234)CYS39$85.00$84.00$120.20$215.00
0020Subbase for PCCP (302-06464)CYS50$110.00$225.00$160.25$170.00
0021Compacted aggregate, no. 53 (303-01180)TON363$43.00$56.00$63.70$68.00
0022Milling, asphalt, 1 1/2 in. (306-08034)SYS1,745$5.20$6.00$5.70$3.85
0023QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON204$163.00$157.00$157.00$215.00
0024QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON30$161.00$155.00$155.00$250.00
0025QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON130$151.00$145.00$145.00$175.00
0026Joint adhesive (401-11526)LFT1,003$0.01$0.01$0.01$2.25
0027Asphalt for tack coat (406-05521)SYS2,735$0.01$0.01$0.01$0.50
0028Terminal joint, type HMA (503-12477)LFT57$430.00$442.00$400.00$440.00
0029Guardrail, remove (601-02241)LFT538$5.20$1.50$1.50$1.50
0030Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT194$22.00$20.00$20.00$20.00
0031Guardrail transition, MGS without curb (601-12292)EACH4$3,275.00$3,000.00$3,000.00$3,000.00
0032Guardrail end treatment, type OS (601-94689)EACH4$3,223.00$3,000.00$3,000.00$3,000.00
0033Barrier delineator (602-06729)EACH12$29.00$36.00$10.50$50.00
0034Reinforced concrete bridge approach, 12 in. (609-06259)SYS224$193.00$285.00$255.00$285.00
0035Right-of-way marker (615-06490)EACH2$182.00$310.00$310.00$310.00
0036Riprap, class 1 (616-05688)TON209$70.00$120.00$105.00$125.00
0037Riprap, revetment (616-06405)TON45$71.00$62.00$68.00$124.00
0038Geotextile for riprap, type 1A (616-12246)SYS306$5.90$3.50$4.00$3.80
0039Clean steel bridge, partial, QP-1, bridge no. 1 (619-11049)LS1$19,750$19,000$19,000$19,000
0040Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459)LS1$260.00$250.00$250.00$250.00
0041Coat steel bridge, partial, bridge no. 1 (619-51860)LS1$9,876.00$9,500.00$9,500.00$9,500.00
0042Mobilization and demobilization for seeding (621-01004)EACH2$104.00$200.00$100.00$100.00
0043Erosion control blanket (621-02770)SYS50$6.20$30.00$6.00$6.00
0044Mulched seeding, type R (621-06559)SYS369$15.00$10.00$14.00$14.00
0045Sodding (621-06574)SYS25$164.00$175.00$200.00$158.00
0046Field office, type C (628-09403)MOS12$3,119.00$3,200.00$3,200.00$4,980.00
0047Field drilled hole in concrete (702-51863)EACH20$45.00$30.00$36.50$39.00
0048Concrete, C, substructure (702-92857)CYS15.80$2,362.00$2,650.00$2,600.00$4,900.00
0049Reinforcing bars, epoxy coated (703-06029)LBS82,179$1.30$1.50$1.75$1.60
0050Concrete, C, superstructure (704-51002)CYS159.40$1,421.00$1,750.00$2,300.00$2,200.00
0051Railing, concrete type FC (706-11600)CYS38.40$865.00$640.00$832.00$832.00
0052Concrete bridge railing transition, type TFC (706-11620)EACH4$1,554.00$2,210.00$1,495.00$1,495.00
0053Structural steel (711-51035)LBS1,576$13.00$3.50$14.00$25.00
0054Jacking and supporting steel beams (711-95291)LS1$9,980.00$9,600.00$30,000$15,000
0055Stud shear connectors (711-96800)EACH580$6.20$6.00$6.00$19.00
0056Bridge expansion joint, type PCF (724-12773)LFT89$48.00$76.00$80.00$95.00
0057Bearing assembly, elastomeric (726-92406)EACH10$2,515.00$3,250.00$2,900.00$3,100.00
0058Road closure sign assembly (801-04308)EACH4$238.00$402.00$402.61$185.00
0059Detour route marker assembly (801-06625)EACH23$177.00$160.00$159.68$75.00
0060Construction sign, type A (801-06640)EACH9$170.00$254.26$254.26$175.00
0061Maintaining traffic (801-06775)LS1$122,001$25,000$15,000$3,000.00
0062Barricade, type III-A (801-07118)LFT48$12.00$16.74$16.74$15.00
0063Barricade, type III-B (801-07119)LFT48$15.00$16.74$16.74$16.00
0064Line, paint, solid, white, 4 in. (808-06713)LFT2,432$1.10$0.62$0.62$1.00
0065Line, paint, solid, yellow, 4 in. (808-06714)LFT2,432$0.65$0.62$0.62$1.00
INDOT contract B-43647-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy