INDOT contract B-43976-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on March 12, 2025, Crawford, Vincennes. 3 bids received; low bid $1,875,896 by Ragle, Inc..
- Owner
- Indiana DOT
- Letting
- 12 MAR 2025
- Pay items
- 90
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ragle, Inc. | $1,875,896 | Low |
| 2 | E & B Paving LLC | $1,918,794 | +2.0% |
| 3 | American Contracting & Services Inc | $1,949,464 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ragle, Inc. | 2. E & B Paving LLC | 3. American Contracting & Services Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,000 | $20,000 | $10,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $92,500 | $96,300 | $97,473 |
| 0009 | Clearing right-of-way (201-52370) | LS | 1 | $9,000.00 | $9,664.00 | $9,747.31 |
| 0010 | Pavement removal (202-02240) | SYS | 254 | $52.00 | $70.00 | $60.00 |
| 0011 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $155,000 | $250,000 | $160,000 |
| 0012 | Slopewall, remove (202-51368) | SYS | 5 | $450.00 | $450.00 | $650.00 |
| 0013 | Sign, remove (202-74035) | EACH | 1 | $85.00 | $85.00 | $85.00 |
| 0014 | Excavation, common (203-02000) | CYS | 320 | $75.00 | $55.00 | $130.00 |
| 0015 | Linear grading (203-08607) | LFT | 600 | $18.00 | $8.00 | $15.00 |
| 0016 | Subgrade treatment, type IC (207-09935) | SYS | 690 | $55.00 | $40.00 | $70.00 |
| 0017 | Structure backfill, type 1 (211-09264) | CYS | 4 | $250.00 | $400.00 | $900.00 |
| 0018 | Drilled hole for flowable backfill (213-08068) | EACH | 2 | $200.00 | $214.00 | $500.00 |
| 0019 | Flowable backfill, non- removable (213-09269) | CYS | 2 | $1,050.00 | $1,800.00 | $600.00 |
| 0020 | Geogrid, type IB (214-11796) | SYS | 690 | $3.00 | $2.75 | $3.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 690 | $5.50 | $5.00 | $6.00 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 50 | $100.00 | $98.00 | $100.00 |
| 0023 | Subbase for PCCP (302-06464) | CYS | 78 | $100.00 | $190.00 | $105.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 160 | $50.00 | $70.00 | $55.00 |
| 0025 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 596 | $16.00 | $16.00 | $15.00 |
| 0026 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 74 | $375.00 | $375.00 | $375.00 |
| 0027 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 41 | $206.00 | $206.00 | $206.00 |
| 0028 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 181 | $206.00 | $206.00 | $206.00 |
| 0029 | Joint adhesive, surface (401-10258) | LFT | 540 | $0.01 | $0.01 | $0.01 |
| 0030 | Joint adhesive, intermediate (401-10259) | LFT | 180 | $0.01 | $0.01 | $0.01 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 1,192 | $0.01 | $0.01 | $0.01 |
| 0032 | Terminal joint, type HMA (503-12477) | LFT | 88 | $521.49 | $430.00 | $450.00 |
| 0033 | Guardrail, remove (601-02241) | LFT | 600 | $6.00 | $6.00 | $6.00 |
| 0034 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,125.00 | $3,125.00 | $3,125.00 |
| 0035 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,765.00 | $2,765.00 | $2,765.00 |
| 0036 | Barrier delineator (602-06729) | EACH | 14 | $20.00 | $25.00 | $50.00 |
| 0037 | Paved side ditch, type A (607-06335) | LFT | 58 | $100.00 | $155.00 | $220.00 |
| 0038 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 342 | $250.00 | $275.00 | $270.00 |
| 0039 | Slopewall (616-06455) | SYS | 5 | $375.00 | $330.00 | $850.00 |
| 0040 | Inspection hole (616-93772) | EACH | 2 | $400.00 | $214.00 | $600.00 |
| 0041 | Clean steel bridge, partial, QP-2, bridge no. 1 (619-11050) | LS | 1 | $100,000 | $100,000 | $100,000 |
| 0042 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0043 | Clean steel bridge, top flanges, type QP-2, bridge no. 1 (619-12506) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0044 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $27,000 | $27,000 | $27,000 |
| 0045 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,050.00 | $1,050.00 | $1,050.00 |
| 0046 | Mulched seeding, type R (621-06559) | SYS | 1,081 | $4.04 | $4.04 | $4.04 |
| 0047 | Computer system equipment (628-11976) | EACH | 2 | $1,000.00 | $250.00 | $800.00 |
| 0048 | Field office, type D (628-12683) | MOS | 12 | $2,750.00 | $3,250.00 | $6,500.00 |
| 0049 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 2 | $1,750.00 | $2,000.00 | $1,800.00 |
| 0050 | Field drilled hole in concrete (702-51863) | EACH | 54 | $24.00 | $25.00 | $35.00 |
| 0051 | Reinforcing bars (703-06028) | LBS | 73 | $5.00 | $5.00 | $9.00 |
| 0052 | Reinforcing bars, epoxy coated (703-06029) | LBS | 39,231 | $1.75 | $1.75 | $1.80 |
| 0053 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 351 | $65.00 | $30.00 | $50.00 |
| 0054 | Concrete, C, superstructure (704-51002) | CYS | 48.60 | $3,400.00 | $3,400.00 | $2,530.00 |
| 0055 | Railing, concrete type FC (706-11600) | CYS | 7.60 | $2,700.00 | $2,850.00 | $1,700.00 |
| 0056 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $5,825.00 | $5,000.00 | $2,500.00 |
| 0057 | Fiber wrap concrete casing system (709-04647) | LS | 1 | $35,000 | $35,000 | $35,000 |
| 0058 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $7,997.00 | $6,997.00 | $11,000 |
| 0059 | Patching concrete structures (710-09158) | SFT | 122 | $185.00 | $185.00 | $185.00 |
| 0060 | Jacking and supporting beams , bridge no. 1 (711-51877) | LS | 1 | $75,000 | $50,000 | $40,000 |
| 0061 | Pipe, roadway drain casting extension (715-10238) | EACH | 2 | $2,000.00 | $750.00 | $600.00 |
| 0062 | Hydrodemolition (722-01066) | SYS | 1,159 | $80.00 | $80.00 | $105.00 |
| 0063 | Bridge deck overlay budget (722-12380) | DOL | 22,960 | $1.00 | $1.00 | $1.00 |
| 0064 | Bridge deck, remove existing concrete overlay (722-12463) | SYS | 1,159 | $16.00 | $11.00 | $17.00 |
| 0065 | Longitudinal grooving (722-12732) | SYS | 1,706 | $6.00 | $5.00 | $10.00 |
| 0066 | Bridge deck patching, full depth (722-51401) | SFT | 150 | $60.00 | $60.00 | $65.00 |
| 0067 | Overlay dam (722-51874) | SFT | 104 | $20.00 | $25.00 | $80.00 |
| 0068 | Bearing assembly, elastomeric (726-92406) | EACH | 18 | $2,250.00 | $2,500.00 | $2,850.00 |
| 0069 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 2,863 | $1.67 | $6.00 | $6.00 |
| 0070 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 63 | $11.81 | $28.00 | $28.00 |
| 0071 | Construction sign, type A (801-06640) | EACH | 66 | $224.00 | $145.00 | $200.00 |
| 0072 | Construction sign, type B (801-06645) | EACH | 8 | $112.00 | $89.00 | $100.00 |
| 0073 | Flashing arrow sign (801-06710) | DAY | 180 | $15.00 | $10.00 | $25.00 |
| 0074 | Maintaining traffic (801-06775) | LS | 1 | $50,000 | $81,000 | $79,000 |
| 0075 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $6,325.00 | $6,325.00 | $10,000 |
| 0076 | Temporary traffic barrier, type 2 (801-08401) | LFT | 155 | $100.00 | $60.00 | $85.00 |
| 0077 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 406 | $115.00 | $35.00 | $90.00 |
| 0078 | Truck mounted attenuator (801-12042) | DAY | 180 | $150.00 | $300.00 | $100.00 |
| 0079 | Portable signal (801-12081) | LS | 1 | $75,000 | $62,000 | $29,000 |
| 0080 | Temporary pavement marking, removable, 7 in. (801-12390) | LFT | 2,059 | $3.88 | $6.50 | $6.50 |
| 0081 | Temporary pavement marking, removable, 28 in. (801-12392) | LFT | 87 | $16.55 | $32.00 | $32.00 |
| 0082 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 8 | $1,291.00 | $800.00 | $1,500.00 |
| 0083 | Reference post (802-04893) | EACH | 1 | $300.00 | $300.00 | $300.00 |
| 0084 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,254 | $1.29 | $1.05 | $3.35 |
| 0085 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,254 | $1.29 | $1.05 | $3.35 |
| 0086 | Grooving for pavement markings (808-12032) | LFT | 1,123 | $2.62 | $0.65 | $3.00 |
| 0087 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 17 | $16.38 | $52.72 | $50.00 |
| 0088 | Snowplowable raised pavement marker (808-75998) | EACH | 17 | $41.55 | $135.00 | $150.00 |
| 0089 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,342 | $125.00 | ||
| 0090 | Bridge deck overlay, silica fume modified (722-01061) | SYS | 1,342 | $105.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.