INDOT contract B-44160-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on July 9, 2025, Randolph, Greenfield. 4 bids received; low bid $1,163,600 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 63
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $1,163,600 | Low |
| 2 | Duncan Robertson Inc | $1,250,291 | +7.0% |
| 3 | Brumbaugh Construction Inc | $1,375,000 | +18% |
| 4 | Beaty Construction Inc | $1,458,100 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Duncan Robertson Inc | 3. Brumbaugh Construction Inc | 4. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $25,000 | $20,000 | $30,000 | $13,401 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $58,000 | $62,500 | $90,000 | $72,750 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $23,200 | $25,000 | $15,000 | $29,000 |
| 0011 | Present structure, remove, structure no. 68-00032 (202-51330) | LS | 1 | $133,927 | $155,000 | $200,000 | $200,000 |
| 0012 | Pipe, remove (202-96133) | LFT | 38 | $21.00 | $20.00 | $18.00 | $12.00 |
| 0013 | Excavation, common (203-02000) | CYS | 237 | $105.00 | $40.00 | $70.00 | $100.00 |
| 0014 | Borrow (203-02070) | CYS | 57 | $7.00 | $0.01 | $25.00 | $60.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 13,142 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $4,800.00 | $17,500 | $25,000 | $16,000 |
| 0018 | Excavation, foundation, unclassified (206-51230) | CYS | 55 | $125.00 | $145.00 | $40.00 | $85.00 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 868 | $52.00 | $65.00 | $30.00 | $46.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 18 | $138.00 | $130.00 | $175.00 | $200.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,010 | $7.00 | $6.00 | $6.00 | $8.00 |
| 0022 | Subbase for PCCP (302-06464) | CYS | 36 | $152.00 | $150.00 | $100.00 | $160.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 164 | $79.00 | $70.00 | $40.00 | $70.00 |
| 0024 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 64 | $311.00 | $342.00 | $220.00 | $311.00 |
| 0025 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 109 | $260.00 | $286.00 | $220.00 | $260.00 |
| 0026 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 261 | $176.00 | $194.00 | $200.00 | $176.00 |
| 0027 | Joint adhesive, surface (401-10258) | LFT | 582 | $3.50 | $3.85 | $2.00 | $3.50 |
| 0028 | Joint adhesive, intermediate (401-10259) | LFT | 582 | $3.50 | $3.85 | $2.00 | $3.50 |
| 0029 | Asphalt for tack coat (406-05521) | SYS | 1,548 | $1.00 | $1.10 | $0.50 | $1.00 |
| 0030 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 1 | $2,775.00 | $3,522.00 | $3,500.00 | $2,500.00 |
| 0031 | Guardrail transition, type TGS-1 (601-06374) | EACH | 1 | $1,150.00 | $1,400.00 | $1,300.00 | $2,100.00 |
| 0032 | Guardrail transition, type TGS-1 , modified (601-06374) | EACH | 3 | $1,050.00 | $1,400.00 | $1,500.00 | $1,600.00 |
| 0033 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,125.00 | $3,582.00 | $3,500.00 | $3,000.00 |
| 0034 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 142 | $230.00 | $275.00 | $190.00 | $210.00 |
| 0035 | Right-of-way marker (615-06490) | EACH | 12 | $158.00 | $165.00 | $160.00 | $182.00 |
| 0036 | Monument, type B (615-06505) | EACH | 2 | $1,210.00 | $1,088.00 | $1,000.00 | $1,400.00 |
| 0037 | Grout for riprap (616-02281) | CYS | 12 | $565.00 | $950.00 | $350.00 | $700.00 |
| 0038 | Riprap, class 1 (616-05688) | TON | 403 | $82.00 | $125.00 | $100.00 | $110.00 |
| 0039 | Riprap, revetment (616-06405) | TON | 9 | $93.00 | $65.00 | $65.00 | $175.00 |
| 0040 | Geotextile for riprap, type 1A (616-12246) | SYS | 541 | $7.25 | $4.00 | $5.00 | $3.50 |
| 0041 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $763.00 | $800.00 | $1,500.00 | $725.00 |
| 0042 | Mulched seeding, type R (621-06559) | SYS | 822 | $5.80 | $6.00 | $5.00 | $5.50 |
| 0043 | Sodding (621-06574) | SYS | 65 | $52.00 | $55.00 | $115.00 | $50.00 |
| 0044 | Field office, type A (628-09401) | MOS | 12 | $4,200.00 | $2,250.00 | $800.00 | $2,775.00 |
| 0045 | Test pile, dynamic, production (701-09557) | LFT | 185 | $175.00 | $95.00 | $80.00 | $125.00 |
| 0046 | Test pile, dynamic, restrike (701-09559) | EACH | 4 | $5,900.00 | $2,500.00 | $4,500.00 | $6,000.00 |
| 0047 | Pile, steel pipe, 0.312 in., diameter 14 in. (701-09663) | LFT | 480 | $117.00 | $95.00 | $150.00 | $125.00 |
| 0048 | Pile, steel pipe, epoxy coated, 0.312 in., diameter 14 in. (701-09675) | LFT | 125 | $233.00 | $200.00 | $200.00 | $200.00 |
| 0049 | Conical pile tip, 14 in. (701-09679) | EACH | 20 | $470.00 | $600.00 | $500.00 | $475.00 |
| 0050 | Reinforcing bars, epoxy coated (703-06029) | LBS | 53,828 | $1.60 | $2.00 | $1.30 | $1.55 |
| 0051 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 28 | $48.00 | $70.00 | $60.00 | $55.00 |
| 0052 | Concrete, C, superstructure (704-51002) | CYS | 204 | $1,185.00 | $1,350.00 | $1,800.00 | $1,400.00 |
| 0053 | Railing, steel type TS-1 (706-06344) | LFT | 200 | $76.00 | $132.00 | $125.00 | $90.00 |
| 0054 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 43 | $108.00 | $90.00 | $55.00 | $95.00 |
| 0055 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 56 | $22.00 | $15.00 | $15.00 | $19.50 |
| 0056 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $515.00 | $800.00 | $1,000.00 | $650.00 |
| 0057 | Longitudinal grooving (722-12732) | SYS | 294 | $9.50 | $25.00 | $10.00 | $15.00 |
| 0058 | Road closure sign assembly (801-04308) | EACH | 5 | $305.00 | $275.00 | $260.00 | $285.00 |
| 0059 | Detour route marker assembly (801-06625) | EACH | 15 | $189.00 | $93.00 | $90.00 | $165.00 |
| 0060 | Construction sign, type A (801-06640) | EACH | 9 | $293.00 | $220.00 | $200.00 | $190.00 |
| 0061 | Maintaining traffic (801-06775) | LS | 1 | $6,581.35 | $25,000 | $5,000.00 | $43,100 |
| 0062 | Barricade, type III-A (801-07118) | LFT | 48 | $15.00 | $22.00 | $20.00 | $20.00 |
| 0063 | Barricade, type III-B (801-07119) | LFT | 72 | $18.00 | $22.00 | $20.00 | $20.00 |
| 0064 | Cofferdam (206-51235) | LS | 1 | $21,200 | $15,000 | $95,854 | $168,780 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.