INDOT contract B-44578-A bid tabulation
BRIDGE DECK OVERLAY, SUBSTRUCTURE REPAIR AND REHABILITATION. Let by Indiana DOT on October 7, 2026, Madison, Greenfield. 4 bids received; low bid $744,300 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 55
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $744,300 | Low |
| 2 | Milestone Contractors LP | $846,650 | +14% |
| 3 | Pontem Contractors Inc | $859,270 | +15% |
| 4 | American Contracting & Services Inc | $947,217 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Milestone Contractors LP | 3. Pontem Contractors Inc | 4. American Contracting & Services Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $7,000.00 | $20,000 | $15,000 | $9,000.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $37,207 | $42,332 | $42,350 | $47,361 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $14,735 | $16,932 | $30,000 | $18,944 |
| 0012 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $60,000 | $62,683 | $54,816 | $13,000 |
| 0013 | Excavation, common (203-02000) | CYS | 234 | $15.00 | $85.00 | $83.50 | $150.00 |
| 0014 | Linear grading (203-08607) | LFT | 95 | $5.00 | $5.50 | $16.00 | $55.00 |
| 0015 | Excavation, waterway (203-51223) | CYS | 60 | $100.00 | $525.00 | $341.50 | $300.00 |
| 0016 | Temporary turbidity curtain (205-09387) | LFT | 45 | $30.00 | $105.00 | $150.00 | $215.00 |
| 0017 | Pump around (205-11626) | EACH | 4 | $1,000.00 | $15,000 | $16,000 | $15,000 |
| 0018 | Stormwater management budget (205-12108) | DOL | 34,044 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $7,000.00 | $5,400.00 | $23,500 | $15,000 |
| 0020 | Milling, transition (306-08043) | SYS | 725 | $7.50 | $5.00 | $5.00 | $10.00 |
| 0021 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 61 | $365.00 | $350.00 | $308.50 | $291.00 |
| 0022 | Joint adhesive (401-11526) | LFT | 525 | $0.50 | $4.50 | $2.00 | $1.60 |
| 0023 | Asphalt for tack coat (406-05521) | SYS | 723 | $2.75 | $0.50 | $2.50 | $2.00 |
| 0024 | Joints in PCCP, saw and seal (507-08272) | LFT | 113 | $15.00 | $13.00 | $23.50 | $30.00 |
| 0025 | Guardrail transition, type WGB (601-01128) | EACH | 1 | $2,438.00 | $2,438.00 | $2,585.00 | $2,438.00 |
| 0026 | Guardrail, remove (601-02241) | LFT | 70 | $15.00 | $15.00 | $16.00 | $15.00 |
| 0027 | Guardrail, reset (601-06035) | LFT | 155 | $30.00 | $30.00 | $32.00 | $30.00 |
| 0028 | Guardrail end treatment, type I (601-06037) | EACH | 1 | $1,750.00 | $1,750.00 | $1,855.00 | $1,750.00 |
| 0029 | Riprap, revetment (616-06405) | TON | 387 | $90.00 | $110.00 | $90.00 | $220.00 |
| 0030 | Geotextile for riprap, type 1A (616-12246) | SYS | 419 | $5.00 | $5.50 | $4.50 | $10.00 |
| 0031 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $500.00 | $500.00 | $530.00 | $1,000.00 |
| 0032 | Clean and coat steel piling, bridge no. 1 (619-12507) | LS | 1 | $70,000 | $53,200 | $56,392 | $80,000 |
| 0033 | Clean and coat steel piling, bridge no. 2 (619-12507) | LS | 1 | $25,000 | $17,000 | $18,020 | $20,000 |
| 0034 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $200.00 | $550.00 | $212.00 | $550.00 |
| 0035 | Mulched seeding, type R (621-06559) | SYS | 560 | $6.00 | $3.54 | $6.50 | $3.54 |
| 0036 | Mulched seeding, type U (621-06560) | SYS | 2,683 | $2.50 | $2.08 | $3.00 | $2.08 |
| 0037 | Field office, type C (628-09403) | MOS | 6 | $3,000.00 | $3,500.00 | $3,529.50 | $5,000.00 |
| 0038 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $6,500.00 | $2,600.00 | $3,558.50 | $4,500.00 |
| 0039 | Plug (715-04837) | EACH | 30 | $500.00 | $200.00 | $478.00 | $300.00 |
| 0040 | Hydrodemolition (722-01066) | SYS | 1,227 | $80.00 | $75.00 | $105.00 | $120.00 |
| 0041 | Bridge deck overlay budget (722-12380) | DOL | 21,935 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0042 | Bridge deck, remove concrete surface (722-12464) | SYS | 1,227 | $7.50 | $7.00 | $6.00 | $10.00 |
| 0043 | Longitudinal grooving (722-12732) | SYS | 1,227 | $5.00 | $5.50 | $10.50 | $15.00 |
| 0044 | Bridge deck patching, full depth (722-51401) | SFT | 103 | $20.00 | $125.00 | $75.00 | $100.00 |
| 0045 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,227 | $130.00 | $125.00 | $95.00 | $120.00 |
| 0046 | Overlay dam (722-51874) | SFT | 104 | $105.00 | $40.00 | $79.00 | $100.00 |
| 0047 | Road closure sign assembly (801-04308) | EACH | 6 | $320.00 | $231.00 | $200.50 | $231.00 |
| 0048 | Detour route marker assembly (801-06625) | EACH | 39 | $130.00 | $134.00 | $129.50 | $134.00 |
| 0049 | Construction sign, type A (801-06640) | EACH | 23 | $195.00 | $179.00 | $150.00 | $179.00 |
| 0050 | Maintaining traffic (801-06775) | LS | 1 | $20,000 | $40,000 | $26,850 | $15,000 |
| 0051 | Barricade, type III-A (801-07118) | LFT | 156 | $17.00 | $13.77 | $11.00 | $13.77 |
| 0052 | Barricade, type III-B (801-07119) | LFT | 72 | $17.00 | $13.77 | $12.00 | $13.77 |
| 0053 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 729 | $1.00 | $1.04 | $2.00 | $1.04 |
| 0054 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 731 | $1.00 | $1.04 | $2.00 | $1.04 |
| 0055 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 72 | $1.50 | $1.04 | $2.00 | $1.04 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.