INDOT contract B-45023-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on April 9, 2025, Perry, Vincennes. 3 bids received; low bid $1,997,662 by Ragle, Inc..
- Owner
- Indiana DOT
- Letting
- 09 APR 2025
- Pay items
- 100
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ragle, Inc. | $1,997,662 | Low |
| 2 | E & B Paving LLC | $2,226,000 | +11% |
| 3 | Force Construction Co Inc | $2,282,790 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ragle, Inc. | 2. E & B Paving LLC | 3. Force Construction Co Inc |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $17,500 | $37,443 | $25,980 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $98,000 | $111,300 | $110,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $19,000 | $6,500.00 | $6,716.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $50,000 | $70,000 | $13,490 |
| 0014 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $40,000 | $50,000 | $9,305.00 |
| 0015 | Present structure, remove portions, structure no. 3 (202-51328) | LS | 1 | $60,000 | $75,000 | $64,450 |
| 0016 | Bridge railing, remove (202-62420) | LFT | 284 | $9.00 | $4.20 | $5.20 |
| 0017 | Guardrail end treatment, remove (202-93741) | EACH | 11 | $475.00 | $475.00 | $494.00 |
| 0018 | Excavation, common (203-02000) | CYS | 760 | $50.00 | $74.00 | $55.00 |
| 0019 | Stormwater management budget (205-12108) | DOL | 35,832 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $10,377 | $12,080 |
| 0021 | Excavation, foundation, unclassified (206-51230) | CYS | 28 | $125.00 | $129.78 | $146.00 |
| 0022 | Cofferdam (206-51235) | LS | 1 | $30,000 | $45,000 | $33,060 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 655 | $55.00 | $206.00 | $55.00 |
| 0024 | Aggregate for end bent backfill (211-06467) | CYS | 16 | $80.00 | $206.00 | $146.00 |
| 0025 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,629 | $3.00 | $4.50 | $5.00 |
| 0026 | Subbase for PCCP (302-06464) | CYS | 170 | $95.00 | $152.00 | $115.00 |
| 0027 | Compacted aggregate, no. 53 (303-01180) | TON | 135 | $50.00 | $210.00 | $69.00 |
| 0028 | Milling, transition (306-08043) | SYS | 2,002 | $4.00 | $8.00 | $6.70 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 210 | $400.00 | $251.00 | $261.00 |
| 0030 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 50 | $450.00 | $295.00 | $307.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 124 | $335.00 | $165.00 | $171.00 |
| 0032 | Joint adhesive, surface (401-10258) | LFT | 1,995 | $1.75 | $1.00 | $1.00 |
| 0033 | Joint adhesive, intermediate (401-10259) | LFT | 267 | $1.75 | $1.00 | $1.00 |
| 0034 | Asphalt for tack coat (406-05521) | SYS | 2,200 | $1.50 | $1.00 | $1.00 |
| 0035 | Guardrail transition, type TGB (601-01522) | EACH | 2 | $2,800.00 | $2,800.00 | $2,910.00 |
| 0036 | Guardrail connector system, W-beam, curved, type 2 (601-01626) | EACH | 1 | $2,100.00 | $2,100.00 | $2,182.00 |
| 0037 | Guardrail terminal system, W-beam curved, type 1 (601-01700) | EACH | 1 | $3,450.00 | $3,450.00 | $3,585.00 |
| 0038 | Guardrail, remove (601-02241) | LFT | 915 | $7.50 | $7.50 | $7.80 |
| 0039 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 63 | $22.50 | $22.50 | $23.00 |
| 0040 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,325.00 | $1,325.00 | $1,377.00 |
| 0041 | Guardrail transition, MGS with curb (601-12291) | EACH | 1 | $4,200.00 | $4,200.00 | $4,364.00 |
| 0042 | Guardrail transition, MGS without curb (601-12292) | EACH | 9 | $3,500.00 | $3,500.00 | $3,637.00 |
| 0043 | Guardrail end treatment, type OS (601-94689) | EACH | 9 | $3,200.00 | $3,200.00 | $3,325.00 |
| 0044 | Guardrail end treatment, type OS , SKT 350 (601-94689) | EACH | 1 | $3,200.00 | $3,200.00 | $3,325.00 |
| 0045 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 50 | $22.00 | $22.00 | $23.00 |
| 0046 | Barrier delineator (602-06729) | EACH | 18 | $20.00 | $32.00 | $27.00 |
| 0047 | Curb, integral concrete, modified (605-06105) | LFT | 9 | $350.00 | $425.00 | $148.00 |
| 0048 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 66 | $70.00 | $120.00 | $89.00 |
| 0049 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 466 | $175.00 | $190.00 | $174.00 |
| 0050 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 216 | $185.00 | $222.00 | $205.00 |
| 0051 | Monument, type B (615-06505) | EACH | 2 | $1,300.00 | $1,300.00 | $1,351.00 |
| 0052 | Riprap, revetment (616-06405) | TON | 83 | $110.00 | $85.00 | $103.00 |
| 0053 | Riprap, grouted, 30 in. (616-11954) | SYS | 292 | $280.00 | $160.00 | $256.00 |
| 0054 | Geotextile for riprap, type 1A (616-12246) | SYS | 59 | $3.00 | $15.00 | $14.00 |
| 0055 | Geotextile for riprap, type 2A (616-12248) | SYS | 733 | $3.00 | $4.50 | $6.20 |
| 0056 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $1,050.00 | $1,050.00 | $1,247.00 |
| 0057 | Mulched seeding, type R (621-06559) | SYS | 1,099 | $4.04 | $8.48 | $1.80 |
| 0058 | Sodding (621-06574) | SYS | 314 | $12.00 | $29.00 | $73.00 |
| 0059 | Computer system equipment (628-11976) | EACH | 1 | $1,000.00 | $500.00 | $890.00 |
| 0060 | Field office, type D (628-12683) | MOS | 14 | $2,250.00 | $2,850.00 | $4,157.00 |
| 0061 | Field drilled hole in concrete (702-51863) | EACH | 1,116 | $25.00 | $35.00 | $28.00 |
| 0062 | Concrete, C, substructure (702-92857) | CYS | 1 | $5,000.00 | $3,800.00 | $6,809.00 |
| 0063 | Reinforcing bars, epoxy coated (703-06029) | LBS | 80,046 | $2.00 | $1.74 | $1.70 |
| 0064 | Embedded galvanic anode , bridge no. 2 (703-08247) | EACH | 46 | $45.00 | $35.00 | $71.00 |
| 0065 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 50 | $60.00 | $50.00 | $60.00 |
| 0066 | Concrete, C, superstructure (704-51002) | CYS | 67.20 | $3,000.00 | $3,400.00 | $2,424.00 |
| 0067 | Railing, concrete type FC (706-09960) | LFT | 250 | $71.00 | $71.00 | $74.00 |
| 0068 | Railing, concrete type FC (706-11600) | CYS | 27 | $989.00 | $989.00 | $1,028.00 |
| 0069 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 12 | $975.00 | $975.00 | $1,013.00 |
| 0070 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $1.00 | $2,706.00 |
| 0071 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $1.00 | $1.00 | $2,884.00 |
| 0072 | Surface seal , bridge no. 3 (709-51821) | LS | 1 | $2,500.00 | $3,601.09 | $4,524.00 |
| 0073 | Patching concrete structures (710-09158) | SFT | 521 | $85.00 | $85.00 | $96.00 |
| 0074 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 50 | $25.00 | $20.00 | $45.00 |
| 0075 | Outlet protector, type 2 (718-06529) | EACH | 6 | $1,450.00 | $3,950.00 | $1,393.00 |
| 0076 | Outlet protector, type 3 (718-06531) | EACH | 2 | $1,300.00 | $4,450.00 | $1,689.00 |
| 0077 | Geotextile for underdrains, type 1B (718-12306) | SYS | 66 | $6.50 | $15.00 | $19.00 |
| 0078 | Hydrodemolition (722-01066) | SYS | 935 | $95.00 | $140.00 | $168.00 |
| 0079 | Bridge deck overlay budget (722-12380) | DOL | 25,800 | $1.00 | $1.00 | $1.00 |
| 0080 | Bridge deck, remove existing concrete surface (722-12464) | SYS | 935 | $17.50 | $19.00 | $16.00 |
| 0081 | Longitudinal grooving (722-12732) | SYS | 1,363 | $12.50 | $14.50 | $5.90 |
| 0082 | Bridge deck patching, full depth (722-51401) | SFT | 306 | $125.00 | $45.00 | $53.00 |
| 0083 | Overlay dam (722-51874) | SFT | 162 | $42.00 | $95.00 | $58.00 |
| 0084 | Construction sign, type C (801-03290) | EACH | 2 | $261.00 | $195.00 | $203.00 |
| 0085 | Road closure sign assembly (801-04308) | EACH | 10 | $304.00 | $295.00 | $307.00 |
| 0086 | Detour route marker assembly (801-06625) | EACH | 75 | $163.00 | $120.00 | $125.00 |
| 0087 | Construction sign, type A (801-06640) | EACH | 21 | $227.00 | $195.00 | $203.00 |
| 0088 | Construction sign, type B (801-06645) | EACH | 2 | $118.00 | $98.00 | $102.00 |
| 0089 | Maintaining traffic (801-06775) | LS | 1 | $54,000 | $75,970 | $390,000 |
| 0090 | Barricade, type III-A (801-07118) | LFT | 168 | $15.66 | $12.00 | $12.00 |
| 0091 | Barricade, type III-B (801-07119) | LFT | 144 | $15.66 | $12.00 | $12.00 |
| 0092 | Portable changeable message sign (801-11642) | EACH | 2 | $5,023.00 | $4,850.00 | $5,040.00 |
| 0093 | Delineator with post, type D1 (804-06725) | EACH | 2 | $350.00 | $60.00 | $130.00 |
| 0094 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 199 | $2.11 | $1.50 | $1.60 |
| 0095 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 2,211 | $0.64 | $0.30 | $0.30 |
| 0096 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,180 | $0.64 | $0.30 | $0.30 |
| 0097 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 20 | $50.00 | $90.00 | $130.00 |
| 0098 | Snowplowable raised pavement marker (808-75998) | EACH | 20 | $88.00 | $145.00 | $151.00 |
| 0099 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,034 | $186.00 | ||
| 0100 | Bridge deck overlay, silica fume modified (722-01061) | SYS | 1,034 | $185.00 | $155.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.