INDOT contract B-45068-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on September 2, 2026, Fountain, Crawfordsville. 4 bids received; low bid $1,188,653 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 82
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $1,188,653 | Low |
| 2 | Milestone Contractors LP | $1,227,541 | +3.0% |
| 3 | Pontem Contractors Inc | $1,287,543 | +8.0% |
| 4 | Duncan Robertson Inc | $1,292,610 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. Pontem Contractors Inc | 4. Duncan Robertson Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $10,000 | $12,500 | $6,300.00 | $12,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $106,979 | $60,000 | $64,255 | $60,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $11,887 | $12,000 | $45,000 | $12,000 |
| 0011 | Pavement removal (202-02240) | SYS | 284 | $14.31 | $50.00 | $30.00 | $50.00 |
| 0012 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $167,025 | $66,815 | $156,929 | $125,000 |
| 0013 | Bridge railing, remove (202-62420) | LFT | 222 | $13.00 | $13.00 | $15.00 | $70.00 |
| 0014 | Excavation, common (203-02000) | CYS | 140 | $101.81 | $90.00 | $80.00 | $50.00 |
| 0015 | Linear grading (203-08607) | LFT | 380 | $1.79 | $5.00 | $8.50 | $5.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 16,170 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $6,019.67 | $12,650 | $6,000.00 | $20,000 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $21,792 | $19,500 | $95,000 | $30,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 107 | $76.70 | $90.00 | $49.50 | $65.00 |
| 0020 | Structure backfill, type 1 (211-09264) | CYS | 1 | $350.77 | $475.00 | $475.00 | $200.00 |
| 0021 | Structure backfill, type 4 (211-09267) | CYS | 2 | $466.19 | $275.00 | $350.00 | $1,000.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 417 | $2.57 | $3.00 | $5.50 | $4.00 |
| 0023 | Subbase for PCCP (302-06464) | CYS | 76 | $112.51 | $250.00 | $202.50 | $200.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 6 | $411.40 | $225.00 | $100.00 | $85.00 |
| 0025 | Milling, transition (306-08043) | SYS | 734 | $6.20 | $8.00 | $5.00 | $5.50 |
| 0026 | Milling, asphalt , 1/4 inch (306-08159) | SYS | 196 | $12.50 | $8.00 | $6.50 | $5.50 |
| 0027 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 85 | $235.00 | $225.00 | $228.00 | $258.00 |
| 0028 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 13 | $220.00 | $650.00 | $537.00 | $242.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 43 | $220.00 | $300.00 | $295.50 | $242.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 690 | $0.45 | $4.00 | $1.60 | $0.50 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 1,223 | $0.01 | $0.20 | $2.75 | $0.27 |
| 0032 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $1,000.00 | $945.00 | $9,450.00 | $1,100.00 |
| 0033 | Guardrail, remove (601-02241) | LFT | 610 | $2.00 | $2.00 | $2.50 | $5.50 |
| 0034 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 300 | $24.00 | $24.00 | $25.50 | $24.00 |
| 0035 | Guardrail height transition, MGS (601-12289) | EACH | 2 | $1,227.00 | $1,227.00 | $1,288.50 | $1,023.00 |
| 0036 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,099.00 | $3,099.00 | $3,254.00 | $4,180.00 |
| 0037 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $2,900.00 | $2,900.00 | $3,045.00 | $3,272.00 |
| 0038 | Barrier delineator (602-06729) | EACH | 8 | $54.12 | $30.00 | $150.00 | $25.00 |
| 0039 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 210 | $49.38 | $2.00 | $5.00 | $8.00 |
| 0040 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 308 | $148.34 | $175.00 | $240.50 | $300.00 |
| 0041 | Riprap, class 1 (616-05688) | TON | 765 | $162.79 | $195.00 | $134.00 | $40.00 |
| 0042 | Riprap, revetment (616-06405) | TON | 56 | $108.94 | $225.00 | $73.00 | $40.00 |
| 0043 | Geotextile for riprap, type 1A (616-12246) | SYS | 958 | $1.30 | $1.50 | $4.00 | $4.00 |
| 0044 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $1,000.00 | $1,000.00 | $1,050.00 | $1,100.00 |
| 0045 | Clean and coat steel piling, bridge no. 1 (619-12507) | LS | 1 | $37,000 | $60,000 | $38,850 | $41,000 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $650.00 | $650.00 | $682.50 | $715.00 |
| 0047 | Mulched seeding, type R (621-06559) | SYS | 400 | $3.55 | $3.55 | $3.75 | $4.00 |
| 0048 | Sodding (621-06574) | SYS | 32 | $69.75 | $69.75 | $125.00 | $92.00 |
| 0049 | Tree protection and trimming , structure no 1 (622-03672) | LS | 1 | $5,000.00 | $33,500 | $15,750 | $8,000.00 |
| 0050 | Field office, type C (628-09403) | MOS | 12 | $3,679.79 | $5,500.00 | $3,331.00 | $2,500.00 |
| 0051 | Computer system equipment (628-11976) | EACH | 1 | $1,082.29 | $1,750.00 | $1,656.00 | $1,000.00 |
| 0052 | Field drilled hole in concrete (702-51863) | EACH | 632 | $29.96 | $15.00 | $19.50 | $15.00 |
| 0053 | Reinforcing bars, epoxy coated (703-06029) | LBS | 54,026 | $1.62 | $1.75 | $1.65 | $2.00 |
| 0054 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 8 | $78.79 | $85.00 | $60.00 | $65.00 |
| 0055 | Concrete, C, superstructure (704-51002) | CYS | 55.70 | $2,453.38 | $1,500.00 | $1,941.00 | $2,150.00 |
| 0056 | Railing, concrete type FC (706-11600) | CYS | 23 | $770.00 | $770.00 | $808.50 | $1,205.00 |
| 0057 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,000.00 | $2,000.00 | $2,100.00 | $2,200.00 |
| 0058 | Surface seal , structure no 1 (709-51821) | LS | 1 | $1.08 | $509.00 | $6,000.00 | $1,000.00 |
| 0059 | Patching concrete structures (710-09158) | SFT | 198 | $183.46 | $183.46 | $195.00 | $217.00 |
| 0060 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 22 | $43.71 | $135.00 | $43.00 | $25.00 |
| 0061 | Outlet protector, type 3 (718-06531) | EACH | 2 | $1,847.28 | $3,000.00 | $1,080.00 | $2,000.00 |
| 0062 | Bridge deck overlay, rigid (722-000134) | SYS | 535 | $87.39 | $155.00 | $124.00 | $250.00 |
| 0063 | Hydrodemolition (722-01066) | SYS | 474 | $92.10 | $95.00 | $129.00 | $250.00 |
| 0064 | Bridge deck overlay budget (722-12380) | DOL | 9,300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0065 | Bridge deck, remove concrete surface (722-12464) | SYS | 474 | $12.53 | $14.00 | $11.50 | $5.00 |
| 0066 | Longitudinal grooving (722-12732) | SYS | 832 | $4.30 | $3.39 | $12.00 | $6.00 |
| 0067 | Bridge deck patching, full depth (722-51401) | SFT | 50 | $261.84 | $2.00 | $70.00 | $100.00 |
| 0068 | Road closure sign assembly (801-04308) | EACH | 5 | $235.00 | $275.00 | $250.00 | $302.00 |
| 0069 | Detour route marker assembly (801-06625) | EACH | 35 | $118.00 | $120.00 | $125.00 | $132.00 |
| 0070 | Construction sign, type A (801-06640) | EACH | 18 | $187.00 | $170.00 | $197.00 | $187.00 |
| 0071 | Maintaining traffic (801-06775) | LS | 1 | $4,068.11 | $74,990 | $8,500.00 | $40,000 |
| 0072 | Barricade, type III-A (801-07118) | LFT | 48 | $14.09 | $15.00 | $15.00 | $16.50 |
| 0073 | Barricade, type III-B (801-07119) | LFT | 72 | $14.09 | $15.00 | $15.00 | $16.50 |
| 0074 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 80 | $42.00 | $42.00 | $44.50 | $42.00 |
| 0075 | Sign, sheet, relocate (802-07060) | EACH | 9 | $106.00 | $106.00 | $111.50 | $220.00 |
| 0076 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 8 | $25.00 | $25.00 | $26.50 | $27.50 |
| 0077 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 18 | $26.00 | $26.00 | $27.50 | $27.50 |
| 0078 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 764 | $1.03 | $1.00 | $1.08 | $1.10 |
| 0079 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 382 | $1.03 | $1.00 | $1.08 | $1.10 |
| 0080 | Grooving for pavement markings (808-12032) | LFT | 420 | $2.49 | $1.00 | $2.61 | $1.10 |
| 0081 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 96 | $1.27 | $1.50 | $1.33 | $1.65 |
| 0082 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 1 | $197.20 | $100.00 | $150.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.