INDOT contract B-45312-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on July 9, 2025, Franklin, Seymour. 5 bids received; low bid $706,980 by Dave Omara Contractor Inc.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 69
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dave Omara Contractor Inc | $706,980 | Low |
| 2 | 5 Star Company Inc | $748,467 | +6.0% |
| 3 | Paul H Rohe Company Inc | $751,347 | +6.0% |
| 4 | Olco Inc | $755,245 | +7.0% |
| 5 | Morphey Construction Inc. | $788,000 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dave Omara Contractor Inc | 2. 5 Star Company Inc | 3. Paul H Rohe Company Inc | 4. Olco Inc | 5. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $12,500 | $22,500 | $7,900.00 | $12,900 | $10,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $35,000 | $29,000 | $28,425 | $12,950 | $39,400 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $27,500 | $25,000 | $22,080 | $23,296 | $39,400 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $12,500 | $7,500.00 | $36,580 | $24,431 | $20,000 |
| 0012 | Fence, farm field, remove (202-99187) | LFT | 149 | $9.00 | $12.00 | $7.50 | $16.50 | $6.00 |
| 0013 | Excavation, common (203-02000) | CYS | 1,198 | $42.00 | $45.00 | $45.00 | $45.05 | $40.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 8,780 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $9,500.00 | $5,000.00 | $2,500.00 | $4,003.71 | $5,000.00 |
| 0016 | Subgrade treatment, type IC (207-09935) | SYS | 1,240 | $23.00 | $50.00 | $40.00 | $50.70 | $30.00 |
| 0017 | B borrow (211-02050) | CYS | 535 | $43.00 | $42.00 | $72.00 | $80.23 | $20.00 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 289 | $78.00 | $58.00 | $74.00 | $77.98 | $60.00 |
| 0019 | Geogrid, type IB (214-11796) | SYS | 271 | $7.00 | $5.00 | $4.25 | $3.27 | $5.00 |
| 0020 | Geotextile for pavement, type 2A (214-12238) | SYS | 709 | $6.00 | $5.50 | $5.00 | $4.27 | $5.00 |
| 0021 | Compacted aggregate, no. 8 (301-12233) | CYS | 85 | $74.00 | $59.00 | $110.00 | $89.51 | $100.00 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 151 | $65.00 | $55.00 | $87.00 | $91.41 | $90.00 |
| 0023 | Widening with HMA, type B (304-07493) | TON | 202 | $110.00 | $205.00 | $225.00 | $171.95 | $200.00 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,132 | $7.00 | $3.50 | $6.00 | $6.77 | $6.50 |
| 0025 | Milling, approach (306-08432) | SYS | 28 | $24.00 | $3.50 | $22.00 | $2.93 | $25.00 |
| 0026 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 116 | $202.00 | $205.00 | $180.00 | $205.88 | $200.00 |
| 0027 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 38 | $142.00 | $185.00 | $165.00 | $190.02 | $182.00 |
| 0028 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 91 | $115.00 | $180.00 | $155.00 | $166.12 | $175.00 |
| 0029 | Joint adhesive, surface (401-10258) | LFT | 1,500 | $2.00 | $1.20 | $0.70 | $1.72 | $0.70 |
| 0030 | Joint adhesive, intermediate (401-10259) | LFT | 225 | $7.00 | $1.20 | $1.10 | $1.72 | $1.30 |
| 0031 | Asphalt for tack coat (406-05520) | TON | 1 | $695.00 | $1,500.00 | $1,000.00 | $1,899.30 | $1,200.00 |
| 0032 | Guardrail, MGS, structure top-mounted post (601-12293) | EACH | 4 | $380.00 | $600.00 | $325.00 | $675.00 | $550.00 |
| 0033 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,600.00 | $3,100.00 | $3,200.00 | $3,250.00 | $2,950.00 |
| 0034 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 563 | $25.00 | $24.00 | $21.50 | $26.50 | $22.00 |
| 0035 | Fence, farm field, reset (603-06060) | LFT | 140 | $53.00 | $50.00 | $45.00 | $24.50 | $15.00 |
| 0036 | HMA for approaches, type C (610-07488) | TON | 9 | $230.00 | $210.00 | $250.00 | $288.09 | $300.00 |
| 0037 | Mailbox assembly, reset, single (611-08232) | EACH | 2 | $265.00 | $300.00 | $228.00 | $400.00 | $257.00 |
| 0038 | Right-of-way marker (615-06490) | EACH | 10 | $200.00 | $200.00 | $175.00 | $225.00 | $185.00 |
| 0039 | Monument, type B (615-06505) | EACH | 2 | $1,400.00 | $1,700.00 | $1,200.00 | $1,050.00 | $1,600.00 |
| 0040 | Monument, type C (615-06510) | EACH | 1 | $800.00 | $2,200.00 | $700.00 | $425.00 | $2,100.00 |
| 0041 | Riprap, class 1 (616-05688) | TON | 87 | $75.00 | $120.00 | $100.00 | $71.72 | $130.00 |
| 0042 | Riprap, class 2 (616-05689) | TON | 57 | $80.00 | $120.00 | $102.00 | $76.73 | $140.00 |
| 0043 | Riprap, revetment (616-06405) | TON | 186 | $60.00 | $85.00 | $80.00 | $54.20 | $120.00 |
| 0044 | Geotextile for riprap, type 1A (616-12246) | SYS | 367 | $5.00 | $4.80 | $3.30 | $3.23 | $5.00 |
| 0045 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,700.00 | $1,000.00 | $1,500.00 | $369.32 | $1,500.00 |
| 0046 | Fertilizer, for permanent seeding , for permanent seeding (621-06545) | TON | 1 | $55.00 | $1,000.00 | $50.00 | $1,771.45 | $10.00 |
| 0047 | Seed mixture, type R (621-06553) | LBS | 55 | $115.00 | $50.00 | $100.00 | $14.23 | $50.00 |
| 0048 | Mulching material (621-06565) | TON | 1 | $225.00 | $250.00 | $200.00 | $1,799.65 | $10.00 |
| 0049 | Water (621-06567) | KGAL | 1 | $1.00 | $1.00 | $0.01 | $477.21 | $1.00 |
| 0050 | Sodding (621-06574) | SYS | 122 | $55.00 | $35.00 | $50.00 | $17.86 | $50.00 |
| 0051 | Computer system equipment (628-11976) | EACH | 2 | $890.00 | $500.00 | $950.00 | $650.00 | $800.00 |
| 0052 | Field office, type D (628-12683) | MOS | 12 | $2,950.00 | $2,000.00 | $3,200.00 | $950.00 | $2,400.00 |
| 0053 | Concrete, B, footings (702-51015) | CYS | 47 | $575.00 | $715.00 | $673.00 | $319.92 | $600.00 |
| 0054 | Waterproofing membrane type 2 (714-000086) | SFT | 1,599 | $5.00 | $2.60 | $4.00 | $7.25 | $5.00 |
| 0055 | Structure, reinforced concrete, box sections, 12 FT X 5 FT (714-11087) | LFT | 70 | $2,198.00 | $2,500.00 | $1,995.00 | $2,969.15 | $2,600.00 |
| 0056 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 25 | $167.00 | $120.00 | $150.00 | $166.06 | $80.00 |
| 0057 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $2,215.00 | $1,100.00 | $1,125.00 | $1,509.11 | $2,000.00 |
| 0058 | Detour route marker assembly (801-06625) | EACH | 32 | $200.00 | $80.00 | $75.00 | $75.00 | $75.00 |
| 0059 | Construction sign, type A (801-06640) | EACH | 12 | $260.00 | $215.00 | $200.00 | $200.00 | $200.00 |
| 0060 | Maintaining traffic (801-06775) | LS | 1 | $10,000 | $18,900 | $11,385 | $15,909 | $49,215 |
| 0061 | Barricade, type III-A (801-07118) | LFT | 56 | $18.00 | $13.00 | $12.00 | $12.00 | $12.00 |
| 0062 | Barricade, type III-B (801-07119) | LFT | 90 | $18.00 | $13.00 | $12.00 | $12.00 | $12.00 |
| 0063 | Grooving for pavement markings (808-12032) | LFT | 2,000 | $1.00 | $2.20 | $2.00 | $2.00 | $2.00 |
| 0064 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 1,000 | $1.90 | $2.75 | $2.50 | $2.50 | $2.50 |
| 0065 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 1,000 | $1.90 | $2.75 | $2.50 | $2.50 | $2.50 |
| 0066 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 10 | $75.00 | $15.00 | $31.77 | $18.47 | $10.00 |
| 0067 | Snowplowable raised pavement marker (808-75998) | EACH | 10 | $140.00 | $165.00 | $150.00 | $150.00 | $150.00 |
| 0068 | Road closure sign assembly (801-04308) | EACH | 8 | $320.00 | $165.00 | $150.00 | $150.00 | $150.00 |
| 0069 | Pump around (205-11626) | EACH | 1 | $25,800 | $7,500.00 | $19,000 | $5,070.33 | $12,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.