INDOT contract R-43174-A bid tabulation
BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on March 12, 2025, St. Joseph, LaPorte. 3 bids received; low bid $1,659,900 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 12 MAR 2025
- Pay items
- 50
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $1,659,900 | Low |
| 2 | Selge Construction Co Inc | $1,834,002 | +10% |
| 3 | Rieth-Riley Construction Co., Inc. | $2,118,697 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Selge Construction Co Inc | 3. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $27,295 | $17,500 | $98,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $75,000 | $89,500 | $328,706 |
| 0009 | Tree, 10 in., remove (201-02250) | EACH | 4 | $750.00 | $525.00 | $500.00 |
| 0010 | Tree, 18 in., remove (201-02255) | EACH | 1 | $1,300.00 | $1,040.00 | $1,000.00 |
| 0011 | Tree, 30 in., remove (201-02260) | EACH | 9 | $2,000.00 | $1,650.00 | $1,600.00 |
| 0012 | Tree, 48 in., remove (201-02265) | EACH | 17 | $2,300.00 | $2,075.00 | $2,000.00 |
| 0013 | Tree, 60 in., remove (201-02270) | EACH | 1 | $3,200.00 | $2,600.00 | $2,500.00 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $56,000 | $229,100 | $9,164.63 |
| 0015 | Curb, concrete, remove (202-02278) | LFT | 1,045 | $20.00 | $37.00 | $31.44 |
| 0016 | Sidewalk concrete, remove (202-52710) | SYS | 5,176 | $45.00 | $39.25 | $26.19 |
| 0017 | Stump, remove (202-91922) | EACH | 2 | $200.00 | $250.00 | $200.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 16,120 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $2,674.26 | $30,000 | $70,932 |
| 0020 | SWQCP preparation (205-12618) | LS | 1 | $2,150.00 | $2,500.00 | $1,600.00 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 220 | $90.00 | $118.25 | $109.54 |
| 0022 | Subgrade treatment, type III (207-08266) | SYS | 6,649 | $18.00 | $1.50 | $3.28 |
| 0023 | Dense graded subbase (302-07455) | CYS | 56 | $225.00 | $185.00 | $293.08 |
| 0024 | HMA patching, full depth, type B (304-12623) | TON | 99 | $300.00 | $470.00 | $867.67 |
| 0025 | Asphalt for tack coat (406-05520) | TON | 0.20 | $500.00 | $1,000.00 | $1.00 |
| 0026 | PCCP patching, full depth (506-06333) | SYS | 33 | $300.00 | $210.00 | $361.30 |
| 0027 | Brick pavers (604-03643) | SYS | 9 | $1,200.00 | $800.00 | $400.00 |
| 0028 | Sidewalk, concrete (604-06070) | SYS | 5,104 | $68.00 | $73.45 | $81.36 |
| 0029 | Curb ramp, concrete (604-08086) | SYS | 423 | $200.00 | $236.35 | $392.74 |
| 0030 | Detectable warning surfaces (604-12083) | SYS | 85 | $175.00 | $305.00 | $266.09 |
| 0031 | Curb, concrete (605-06120) | LFT | 1,045 | $60.00 | $79.35 | $56.12 |
| 0032 | PCCP for approaches, 6 in. (610-08446) | SYS | 1,545 | $90.00 | $98.75 | $132.68 |
| 0033 | Geomembrane (616-09395) | SYS | 203 | $80.00 | $125.00 | $55.37 |
| 0034 | Topsoil (621-06570) | CYS | 841 | $74.00 | $0.01 | $177.45 |
| 0035 | Sodding (621-06574) | SYS | 7,566 | $8.10 | $8.10 | $8.10 |
| 0036 | Tree protection (621-07643) | EACH | 42 | $225.00 | $155.00 | $533.95 |
| 0037 | Tree protection and trimming (622-03672) | LS | 1 | $25,000 | $5,000.00 | $4,000.00 |
| 0038 | Plant, deciduous tree, single stem, over 2.5 in. to 3.5 in. (622-05651) | EACH | 12 | $775.00 | $775.00 | $775.00 |
| 0039 | Field office, type C (628-09403) | MOS | 12 | $3,600.00 | $5,300.00 | $900.00 |
| 0040 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 2,520 | $2.10 | $2.10 | $7.39 |
| 0041 | Construction sign, type A (801-06640) | EACH | 51 | $264.00 | $264.00 | $264.00 |
| 0042 | Construction sign, type B (801-06645) | EACH | 24 | $209.00 | $209.00 | $209.00 |
| 0043 | Maintaining traffic (801-06775) | LS | 1 | $23,500 | $18,000 | $4,300.00 |
| 0044 | Temporary curb ramp (801-11990) | EACH | 16 | $500.00 | $3,200.00 | $100.00 |
| 0045 | Temporary accessible pedestrian path (801-12641) | SYS | 45 | $100.00 | $215.00 | $10.00 |
| 0046 | Temporary pedestrian channelizer (801-12862) | LFT | 160 | $40.00 | $105.00 | $55.00 |
| 0047 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $250.00 | $250.00 | $750.00 |
| 0048 | Handhole, adjust to grade (807-98690) | EACH | 1 | $1,500.00 | $500.00 | $1,453.07 |
| 0049 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 883 | $15.00 | $15.00 | $15.00 |
| 0050 | Transverse marking, multi-component, crosswalk line, white, 6 in. (808-10056) | LFT | 566 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 12, 2025. Compiled by Mirage Metrics.