| 0001 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0002 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0003 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization, idiq (110-12655) | DOL | 100,000 | $1.00 | $1.00 | $1.00 |
| 0010 | Pavement removal (202-02240) | SYS | 500 | $65.00 | $50.00 | $50.00 |
| 0011 | Sidewalk concrete, remove (202-52710) | SYS | 60 | $40.00 | $50.00 | $45.00 |
| 0012 | Excavation, common (203-02000) | CYS | 35 | $130.00 | $100.00 | $250.00 |
| 0013 | Compacted aggregate, no. 53 (303-01180) | TON | 100 | $100.00 | $50.00 | $50.00 |
| 0014 | Compacted aggregate, no. 73 (303-07449) | TON | 70 | $100.00 | $50.00 | $50.00 |
| 0015 | HMA patching, full depth, type C (304-12625) | TON | 300 | $295.00 | $325.00 | $350.00 |
| 0016 | HMA patching, partial depth, type C (304-12626) | TON | 300 | $415.00 | $325.00 | $350.00 |
| 0017 | HMA patching, full depth, type D (304-12627) | TON | 250 | $300.00 | $325.00 | $350.00 |
| 0018 | HMA patching, partial depth, type D (304-12628) | TON | 260 | $420.00 | $325.00 | $350.00 |
| 0019 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 5,000 | $7.00 | $5.00 | $5.00 |
| 0020 | Joint adhesive, surface (401-10258) | LFT | 7,500 | $1.00 | $0.30 | $0.30 |
| 0021 | Liquid asphalt sealant (401-11785) | LFT | 7,500 | $0.01 | $0.10 | $0.10 |
| 0022 | HMA wedge and level, type C (402-07452) | TON | 250 | $250.00 | $110.00 | $110.00 |
| 0023 | Asphalt for tack coat (406-05520) | TON | 6 | $630.00 | $800.00 | $800.00 |
| 0024 | Retrofitted tie bars (503-03489) | EACH | 60 | $116.00 | $20.00 | $50.00 |
| 0025 | D-1 contraction joint (503-05240) | LFT | 115 | $15.00 | $20.00 | $53.50 |
| 0026 | PCCP patching, full depth (506-06333) | SYS | 425 | $232.00 | $400.00 | $625.00 |
| 0027 | PCCP patching, partial depth (506-06334) | SYS | 300 | $365.00 | $500.00 | $525.00 |
| 0028 | Cracks in PCCP, filled (507-08269) | LFT | 4,000 | $2.20 | $4.00 | $6.25 |
| 0029 | Joints in PCCP, saw and seal (507-08272) | LFT | 3,500 | $3.10 | $5.00 | $5.00 |
| 0030 | Sidewalk, concrete (604-06070) | SYS | 5 | $300.00 | $100.00 | $375.00 |
| 0031 | Curb ramp, concrete (604-08086) | SYS | 50 | $325.00 | $275.00 | $500.00 |
| 0032 | Curb, concrete (605-06120) | LFT | 60 | $120.00 | $75.00 | $125.00 |
| 0033 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 2,500 | $3.00 | $3.00 | $2.00 |
| 0034 | Construction sign, type A (801-06640) | EACH | 150 | $250.00 | $250.00 | $250.00 |
| 0035 | Construction sign, type B (801-06645) | EACH | 10 | $150.00 | $150.00 | $150.00 |
| 0036 | Flashing arrow sign (801-06710) | DAY | 100 | $26.75 | $25.00 | $25.00 |
| 0037 | Portable changeable message sign (801-11642) | EACH | 2 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0038 | Truck mounted attenuator (801-12042) | DAY | 10 | $890.00 | $450.00 | $850.00 |
| 0039 | Maintaining traffic, idiq (801-12440) | DOL | 100,000 | $1.00 | $1.00 | $1.00 |
| 0040 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 2,600 | $1.25 | $1.00 | $1.00 |
| 0041 | Line, paint, broken, white, 6 in. (808-75002) | LFT | 2,600 | $1.25 | $1.00 | $1.00 |
| 0042 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 5,280 | $1.25 | $1.00 | $1.00 |
| 0043 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 5,280 | $1.25 | $1.00 | $1.00 |