KYTC unit bid prices and bid tabulations
Unit prices bid on 4,414 Kentucky Transportation Cabinet contracts let from 22 NOV 2019 to 22 OCT 2026, read from KYTC's own tabulations. 423 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 4,414
- Bids
- 9,448
- Unit prices
- 336,278
- Latest letting
- 22 OCT 2026
Price a KYTC pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The KYTC pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Temporary signs | SF | $8.20 | 41 | Last 24 months | 5,296 | |
| Asphalt pave milling & texturing | TON | $58.91 | 38 | Last 24 months | 3,939 | |
| Leveling & wedging PG64-22 | TON | $121.85 | 43 | Last 24 months | 3,662 | |
| CL2 asph surf 0.38D PG64-22 | TON | $122.19 | 42 | Last 24 months | 3,494 | |
| Pave striping-temp paint-4 in | LF | $0.30 | 19 | Last 24 months | 3,356 | |
| Pave striping-perm paint-4 in | LF | $0.32 | 23 | Last 24 months | 3,169 | |
| Pave marking-thermo stop bar-24IN | LF | $14.00 | 22 | Last 24 months | 3,095 | |
| Portable changeable message sign | EACH | $2,337.00 | 11 | Last 24 months | 3,083 | |
| Dga base | TON | $55.00 | 28 | Last 24 months | 2,581 | |
| Maintain & control traffic | LS A A | $8,500.00 | 1,036 | Last 24 months | 2,439 | |
| Fuel adjustment | DOL | $1.00 | 26 | Last 24 months | 2,398 | |
| Asphalt adjustment | DOL | $1.00 | 25 | Last 24 months | 2,338 | |
| Asphalt material for tack | TON | $10.00 | 25 | Last 24 months | 2,315 | |
| Concrete-class a | CY | $1,080.00 | 11 | Last 24 months | 2,162 | |
| Pave marking-thermo curv arrow | EACH | $110.06 | 10 | Last 24 months | 2,096 | |
| Steel reinforcement | LB | $1.65 | 7 | Last 24 months | 1,872 | |
| Demobilization | LS A A | $9,557.51 | 696 | Last 24 months | 1,682 | |
| Armored edge for concrete | LF | $107.00 | 11 | Last 24 months | 1,668 | |
| Asphalt material for tack non-tracking | TON | $708.40 | 14 | Last 24 months | 1,632 | |
| Delineator for guardrail bi directional white | EACH | $16.01 | 14 | Last 24 months | 1,618 | |
| Pave striping-thermo-6 in w | LF | $1.18 | 7 | Last 24 months | 1,615 | |
| Arrow panel | EACH | $1,007.00 | 7 | Last 24 months | 1,606 | |
| Pave striping-thermo-6 in y | LF | $1.18 | 7 | Last 24 months | 1,589 | |
| Edgeline rumble strips | LF | $0.25 | 18 | Last 24 months | 1,543 | |
| Guardrail-steel w beam-s face | LF | $40.00 | 16 | Last 24 months | 1,528 | |
| Guardrail terminal section no 1 | EACH | $105.06 | 8 | Last 24 months | 1,468 | |
| Mobilization for mill & text | LS A A | $3,500.00 | 669 | Last 24 months | 1,395 | |
| Asphalt seal aggregate | TON | $350.00 | 9 | Last 24 months | 1,371 | |
| Steel reinforcement-epoxy coated | LB | $1.64 | 9 | Last 24 months | 1,359 | |
| Edge key | LF | $59.65 | 11 | Last 24 months | 1,349 | |
| CL2 asph base 1.00D PG64-22 | TON | $170.50 | 8 | Last 24 months | 1,341 | |
| Asphalt seal coat | TON | $1,272.23 | 8 | Last 24 months | 1,338 | |
| Pave striping-perm paint-6 in | LF | $0.30 | 16 | Last 24 months | 1,316 | |
| Temporary signs | SQFT A A | $7.83 | 498 | Last 24 months | 1,300 | |
| Concrete-class aa | CY | $1,600.00 | 11 | Last 24 months | 1,249 | |
| Concrete sealing | SF | $1.75 | 10 | Last 24 months | 1,222 | |
| Base failure repair | SY | $117.94 | 12 | Last 24 months | 1,164 | |
| Remove guardrail | LF | $3.50 | 9 | Last 24 months | 1,131 | |
| Seeding and protection | SY | $0.60 | 2 | Last 24 months | 1,096 | |
| Maintain & control traffic | LS A | $9,000.00 | 431 | Last 24 months | 1,077 | |
| Barricade-type iii | EACH | $159.00 | 9 | Last 24 months | 1,072 | |
| Maintenance fertilizer | TON | $1,298.99 | 2 | Last 24 months | 1,061 | |
| Erosion control blanket | SY | $3.25 | 4 | Last 24 months | 1,056 | |
| Initial fertilizer | TON | $1,298.99 | 2 | Last 24 months | 1,020 | |
| Guardrail end treatment type 1 | EACH | $4,243.09 | 9 | Last 24 months | 999 | |
| Temp silt fence | LF | $3.84 | 3 | Last 24 months | 998 | |
| Asphalt pave milling & texturing | TON A A | $36.20 | 462 | Last 24 months | 984 | |
| Silt trap type b | EACH | $170.00 | 3 | Last 24 months | 975 | |
| Trenching and backfilling | LF | $9.25 | 1 | Last 24 months | 966 | |
| Temp seeding and protection | SY | $0.43 | 1 | Last 24 months | 965 | |
| Leveling & wedging PG64-22 | TON A A | $108.88 | 466 | Last 24 months | 963 | |
| Cyclopean stone rip rap | TON | $60.00 | 7 | Last 24 months | 960 | |
| Temp mulch | SY | $0.42 | 1 | Last 24 months | 944 | |
| Agricultural limestone | TON | $80.31 | 2 | Last 24 months | 944 | |
| CL2 asph surf 0.38D PG64-22 | TON A A | $111.40 | 422 | Last 24 months | 928 | |
| Channel lining class ii | TON | $46.00 | 3 | Last 24 months | 923 | |
| Roadway excavation | CY | $40.99 | 7 | Last 24 months | 901 | |
| Crushed aggregate size no 2 | TON | $37.83 | 1 | Last 24 months | 879 | |
| Pave striping-temp paint-4 in | LF A A | $0.09 | 405 | Last 24 months | 839 | |
| Detectable warnings | SF | $47.25 | 408 | All lettings | 831 | |
| Loop saw slot and fill | LF | $11.99 | 1 | Last 24 months | 826 | |
| Silt trap type c | EACH | $210.00 | 3 | Last 24 months | 825 | |
| Remove pavement marker type v | EACH | $8.25 | 2 | Last 24 months | 825 | |
| Loop wire | LF | $1.50 | 1 | Last 24 months | 820 | |
| Silt trap type a | EACH | $155.00 | 2 | Last 24 months | 818 | |
| Pave marking-thermo cross-hatch | SF | $6.16 | 7 | Last 24 months | 809 | |
| Portable changeable message sign | EACH A A | $1,500.00 | 292 | Last 24 months | 804 | |
| Pave marking-thermo stop bar-24IN | LF A A | $12.50 | 370 | Last 24 months | 784 | |
| Test piles | LF | $169.50 | 6 | Last 24 months | 780 | |
| Pave marking-thermo comb arrow | EACH | $172.50 | 4 | Last 24 months | 770 | |
| Asphalt adjustment | DOLL A A | $1.00 | 364 | Last 24 months | 740 | |
| Temp ditch | LF | $1.50 | 3 | Last 24 months | 735 | |
| Fabric-geotextile class 1 | SY | $3.30 | 1 | Last 24 months | 729 | |
| Guardrail end treatment type 7 | EACH | $1,866.36 | 4 | Last 24 months | 728 | |
| Staking | LS A A | $10,500 | 241 | Last 24 months | 721 | |
| Clean silt trap type b | EACH | $35.00 | 3 | Last 24 months | 718 | |
| Fuel adjustment | DOLL A A | $1.00 | 351 | Last 24 months | 714 | |
| Crushed stone base | TON | $45.61 | 4 | Last 24 months | 713 | |
| Bridge overlay approach pavement | SY | $36.00 | 1 | Last 24 months | 712 | |
| Sidewalk-4 in concrete | SY | $145.00 | 327 | All lettings | 696 | |
| Demobilization | LS A | $11,082 | 291 | Last 24 months | 695 | |
| Pave marking-thermo x-walk-6 in | LF | $4.50 | 2 | Last 24 months | 689 | |
| Barcode sign inventory | EACH | $50.00 | 1 | Last 24 months | 680 | |
| Centerline rumble strips | LF | $0.21 | 4 | Last 24 months | 677 | |
| Structure granular backfill | CY | $87.50 | 6 | Last 24 months | 663 | |
| Structure excav-solid rock | CY | $350.00 | 1 | Last 24 months | 660 | |
| Pave striping-temp rem tape-w | LF | $1.90 | 5 | Last 24 months | 656 | |
| Fabric-geotextile class 2 | SY | $2.50 | 3 | Last 24 months | 655 | |
| Dga base | TON A A | $50.00 | 275 | Last 24 months | 653 | |
| Granular embankment | CY | $81.00 | 1 | Last 24 months | 626 | |
| Channel lining class iii | TON | $50.00 | 3 | Last 24 months | 623 | |
| CL3 asph surf 0.38B PG64-22 | TON | $131.88 | 2 | Last 24 months | 618 | |
| Clean silt trap type c | EACH | $53.19 | 2 | Last 24 months | 617 | |
| Pave striping-temp rem tape-y | LF | $1.95 | 6 | Last 24 months | 617 | |
| Clean silt trap type a | EACH | $22.50 | 2 | Last 24 months | 615 | |
| Sbm alum sheet signs .080 in | SF | $36.02 | 310 | All lettings | 614 | |
| Steel post type 1 | LF | $25.07 | 307 | All lettings | 600 | |
| Right-of-way monument type 1 | EACH | $216.06 | 3 | Last 24 months | 598 | |
| Shoulder rumble strips | LF | $11.50 | 1 | Last 24 months | 597 | |
| Witness post | EACH | $199.51 | 3 | Last 24 months | 596 | |
| Asphalt material for tack | TON A A | $10.00 | 255 | Last 24 months | 584 | |
| Temporary signs | SQFT A | $8.00 | 211 | Last 24 months | 579 | |
| Culvert pipe-18 in | LF | $170.00 | 2 | Last 24 months | 575 | |
| Pave striping-perm paint-4 in | LF A A | $0.24 | 276 | Last 24 months | 575 | |
| Electrical junction box type b | EACH | $962.00 | 299 | All lettings | 574 | |
| Piles-steel HP12X53 | LF | $75.00 | 2 | Last 24 months | 569 | |
| Mobilization for mill & text | LS A | $3,000.00 | 271 | Last 24 months | 559 | |
| Pave marking-thermo only | EACH | $300.00 | 251 | All lettings | 557 | |
| Pave striping-temp rem tape-b | LF | $2.25 | 5 | Last 24 months | 556 | |
| Conduit-1 1/4 in | LF | $10.50 | 1 | Last 24 months | 546 | |
| Remove pavement | SY | $7.00 | 1 | Last 24 months | 538 | |
| Edgeline rumble strips | LF A A | $0.26 | 256 | Last 24 months | 530 | |
| Fabric-geotextile class 2 for pipe | SY | $2.00 | 1 | Last 24 months | 529 | |
| G/r steel w beam-s face (7 ft post) | LF | $36.87 | 1 | Last 24 months | 529 | |
| Object marker ty 3 | EACH | $138.95 | 3 | Last 24 months | 528 | |
| Pave striping-thermo-12 in w | LF | $2.30 | 2 | Last 24 months | 525 | |
| Clean temp ditch | LF | $0.50 | 1 | Last 24 months | 514 | |
| Extra length guardrail post | EACH | $154.34 | 3 | Last 24 months | 510 | |
| Pre-drilling for piles | LF | $616.00 | 3 | Last 24 months | 509 | |
| Lane closure | EACH | $2,692.43 | 2 | Last 24 months | 505 | |
| Blast cleaning | SY | $7.20 | 1 | Last 24 months | 503 | |
| Concrete-class a | CUYD A A | $1,300.00 | 193 | Last 24 months | 502 | |
| Cable-no. 14/1 pair | LF | $1.59 | 259 | All lettings | 501 | |
| Remove pipe | LF | $46.00 | 1 | Last 24 months | 495 | |
| Pave marking-thermo curv arrow | EACH A A | $120.00 | 210 | Last 24 months | 492 | |
| Embankment in place | CY | $25.64 | 2 | Last 24 months | 488 | |
| Concrete overlay-latex | CY | $1,105.00 | 1 | Last 24 months | 484 | |
| Epoxy sand slurry | SY | $39.00 | 1 | Last 24 months | 482 | |
| Partial depth patching | CY | $1,350.00 | 1 | Last 24 months | 481 | |
| Culvert pipe-24 in | LF | $210.00 | 237 | All lettings | 475 | |
| Joint adhesive | LF | $1.60 | 2 | Last 24 months | 472 | |
| Pave striping-thermo-6 in w | LF A A | $1.15 | 201 | Last 24 months | 468 | |
| Perforated pipe-4 in | LF | $15.00 | 203 | All lettings | 466 | |
| Microsurfacing-leveling course | SY | $1.63 | 59 | All lettings | 465 | |
| Traffic bound base | TON | $30.00 | 1 | Last 24 months | 456 | |
| Pave striping-temp paint-6 in | LF | $0.30 | 2 | Last 24 months | 451 | |
| Pave striping-thermo-6 in y | LF A A | $1.10 | 193 | Last 24 months | 451 | |
| Concrete barrier wall type 9T | LF | $44.82 | 3 | Last 24 months | 442 | |
| Longitudinal edge key | LF | $13.47 | 2 | Last 24 months | 441 | |
| CL2 asph base 0.75D PG64-22 | TON | $210.95 | 5 | Last 24 months | 439 | |
| Temp signal 2 phase | EACH | $3,360.28 | 6 | Last 24 months | 432 | |
| Pave marking-thermo str arrow | EACH | $106.49 | 2 | Last 24 months | 432 | |
| Pave striping-temp paint-4 in | LF A | $0.16 | 203 | Last 24 months | 432 | |
| Non-perforated pipe-4 in | LF | $21.50 | 191 | All lettings | 425 | |
| Conc class m full depth patch | CY | $890.00 | 1 | Last 24 months | 424 | |
| Pile points-12 in | EACH | $167.50 | 2 | Last 24 months | 422 | |
| Arrow panel | EACH A A | $560.00 | 155 | Last 24 months | 414 | |
| Leveling & wedging PG64-22 | TON A | $112.00 | 197 | Last 24 months | 410 | |
| Rail system side mounted mgs | LF | $315.02 | 1 | Last 24 months | 409 | |
| Entrance pipe-15 in | LF | $110.00 | 1 | Last 24 months | 409 |
273 more items have a page; search any item in the explorer above.
Latest lettings
| Let | Contract | District | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 22 OCT 2026 | 26-5417 | BRIDGE REPLACEMENT KY 795 OVER CHESTNUT CREEK | 5 | $984,605 | KYTC | |
| 22 OCT 2026 | 26-4701 | HIGH FRICTION SURFACE VARIOUS ROUTES IN DISTRICT 10 AND DISTRICT 12 | 4 | $429,429 | KYTC | |
| 22 OCT 2026 | 26-4702 | HIGH FRICTION SURFACE VARIOUS ROUTES IN DISTRICT 7 AND DISTRICT 8 AND DISTRICT 11 | 4 | $284,284 | KYTC | |
| 22 OCT 2026 | 26-4703 | HIGH FRICTION SURFACE VARIOUS ROUTES IN DISTRICT 6 AND DISTRICT 7 | 4 | $235,235 | KYTC | |
| 22 OCT 2026 | 26-4705 | HIGH FRICTION SURFACE HFST ON VARIOUS ROUTES IN DISTRICT 5 | 4 | $561,561 | KYTC | |
| 22 OCT 2026 | 26-4704 | HIGH FRICTION SURFACE VARIOUS ROUTES IN DISTRICTS 1, 2, AND 3 | 3 | $203,203 | KYTC | |
| 22 OCT 2026 | 26-2162 | ASPHALT RESURFACING JEFFERSON COUNTY (KY 61, KY 1703) | 5 | $1,605,000 | KYTC | |
| 22 OCT 2026 | 26-2253 | ASPHALT RESURFACING KY 32 IN HARRISON COUNTY | 2 | $1,153,250 | KYTC | |
| 22 OCT 2026 | 26-1522 | AIRPORT CONSTRUCTION PAPI REPLACEMENT AT ROUGH RIVER STATE PARK AIRPORT | 1 | $117,250 | KYTC | |
| 22 OCT 2026 | 26-3053 | ASPHALT RESURFACING AUSTIN TRACY RD (KY 87) | 2 | $783,059 | KYTC | |
| 22 OCT 2026 | 26-3046 | ASPHALT RESURFACING PERKINS RIDGE RD (KY 1011) | 3 | $218,857 | KYTC | |
| 22 OCT 2026 | 26-3064 | ASPHALT RESURFACING SANDY CREEK RD (KY 1153) | 2 | $503,738 | KYTC |
Where these numbers come from
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
| Year | Contracts |
|---|---|
| 2019 | 51 |
| 2020 | 395 |
| 2021 | 810 |
| 2022 | 840 |
| 2023 | 787 |
| 2024 | 629 |
| 2025 | 595 |
| 2026 | 307 |
Every state's coverage and check is on the bid results hub.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.