Gunter Construction Company: MoDOT bid record
Gunter Construction Company submitted 12 bids on Missouri DOT contracts in the data, from 21 FEB 2020 to 17 APR 2026, and was the low bidder on 3 of them (25%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $1,618,157
- Latest bid
- 17 APR 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 1 | 33% |
| 2021 | 4 | 2 | 50% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Advanced warning rail system | 6161008 | EACH | 10 | 9 (90%) | $35.00 | $51.40 |
| Construction signs | 6161005 | SF | 13 | 8 (62%) | $6.00 | $7.00 |
| Type III moveable barricade | 6161030 | EACH | 10 | 6 (60%) | $120.00 | $156.69 |
| Silt fence | 8061019 | LF | 9 | 6 (67%) | $1.65 | $3.45 |
| Preformed thermoplastic pavement marking, 24 in. white | 6200015 | LF | 8 | 6 (75%) | $15.00 | $23.50 |
| Additional mobilization for seeding | 6181020 | EACH | 6 | 6 (100%) | $600.00 | $600.00 |
| Type 5 aggregate for base (6 in. thick) | 3040506 | SY | 10 | 5 (50%) | $15.50 | $15.50 |
| Flashing arrow panel | 6161040 | EACH | 8 | 5 (63%) | $1,156.50 | $1,000.00 |
| Pavement marking removal | 6207001 | LF | 6 | 5 (83%) | $0.78 | $1.04 |
| Curb inlet check | 8061007A | EACH | 6 | 5 (83%) | $69.50 | $145.38 |
| Misc. ADA compliant moveable barricade | 6169902 | EACH | 5 | 5 (100%) | $45.00 | $77.00 |
| Channelizer (trim line) | 6161025 | EACH | 13 | 4 (31%) | $20.00 | $18.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Leavenworth Excavating & Equipment Company, Inc. | 7 | 4 of 7 |
| Ideker, Inc. | 5 | 2 of 5 |
| Amino Brothers Co. Inc. | 4 | 3 of 4 |
| Radmacher Brothers Excavating Co., Inc. | 4 | 4 of 4 |
| MegaKC Corporation | 4 | 2 of 4 |
| MegaKC Corporation dba Mega Industries C | 3 | 1 of 3 |
| Phillips Hardy, Inc. | 3 | 1 of 3 |
| Emery Sapp & Sons, Inc. | 3 | 3 of 3 |
| Freeman Concrete Construction LLC | 3 | 0 of 3 |
| Amino Bros. Co., Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 APR 2026 | 260417-C02 | Kansas City | J4P3268I - VARIOUS ROUTES - JACKSON COUNTY | 5 of 5 | $2,435,254 | +78% |
| 14 MAR 2025 | 250314-C03 | Kansas City | JKR0134 - HIGHWAY 50 - JOHNSON COUNTY | 4 of 4 | $2,879,526 | +51% |
| 15 NOV 2024 | 241115-C02 | Kansas City | J4P3268D - ROUTE 58, 2, 7, A, O, OUTTER ROAD 71 - CASS COUNTY | 2 of 5 | $2,493,986 | +13% |
| 17 FEB 2023 | 230217-C02 | Kansas City | J3P3085E, J3S3076 - ROUTE 23 - JOHNSON COUNTY | 3 of 3 | $439,919 | +39% |
| 16 SEP 2022 | 220916-C03 | Kansas City | J4S3272 - ROUTE 58 - CASS COUNTY | 7 of 7 | $1,983,870 | +47% |
| 19 NOV 2021 | 211119-C06 | Kansas City | J4P3295D - ROUTE A - CLAY COUNTY | 3 of 7 | $1,268,442 | +27% |
| 19 MAR 2021 | 210319-C05 | Kansas City | J4S3298 - ROUTE 7 - JACKSON COUNTY | 1 of 4 | $549,764 | Low, 18% under the second |
| 19 MAR 2021 | 210319-C07 | Kansas City | J4S3338 - ROUTE 350 - JACKSON COUNTY | 1 of 5 | $313,821 | Low, 12% under the second |
| 19 FEB 2021 | 210219-C03 | Kansas City | J4P3268B - ROUTE 169 - CLAY COUNTY | 2 of 5 | $748,186 | +2.0% |
| 18 SEP 2020 | 200918-C03 | Kansas City | J4P3212 - ROUTE H - JACKSON COUNTY | 7 of 9 | $966,705 | +22% |
| 15 MAY 2020 | 200515-C11 | Kansas City | J4S3167 - ROUTE 7 - JACKSON COUNTY | 1 of 3 | $754,573 | Low, 3.0% under the second |
| 21 FEB 2020 | 200221-C03 | Kansas City | J4P3212D - ROUTE 2 - CASS COUNTY | 6 of 6 | $709,293 | +31% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.