MoDOT contract 250314-C03 bid tabulation
JKR0134 - HIGHWAY 50 - JOHNSON COUNTY. Let by Missouri DOT on March 14, 2025, Johnson, Kansas City. 4 bids received; low bid $1,904,947 by Leavenworth Excavating & Equipment Company, Inc..
- Owner
- Missouri DOT
- Letting
- 14 MAR 2025
- Pay items
- 75
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Leavenworth Excavating & Equipment Company, Inc. | $1,904,947 | Low |
| 2 | Radmacher Brothers Excavating Co., Inc. | $2,028,359 | +6.0% |
| 3 | Clarkson Construction Company | $2,667,840 | +40% |
| 4 | Gunter Construction Company | $2,879,526 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Leavenworth Excavating & Equipment Company, Inc. | 2. Radmacher Brothers Excavating Co., Inc. | 3. Clarkson Construction Company | 4. Gunter Construction Company |
|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $151,645 | $111,719 | $225,780 | $255,000 |
| 0030 | Unclassified excavation (2035000) | CY | 3,944 | $25.00 | $18.10 | $35.00 | $33.00 |
| 0040 | Embankment in place (2035500) | CY | 1,373 | $37.58 | $23.60 | $25.00 | $49.00 |
| 0050 | Compacting embankment (2036000) | CY | 2,588 | $5.00 | $1.80 | $7.50 | $17.00 |
| 0060 | Class 3 excavation (2063000) | CY | 57 | $20.00 | $25.35 | $112.61 | $37.00 |
| 0070 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 13,564 | $16.50 | $15.90 | $14.00 | $17.00 |
| 0080 | Type A2 shoulder (4010150) | SY | 1,007 | $45.70 | $49.05 | $100.00 | $99.00 |
| 0090 | Misc.optional pavement (4019905) | SY | 9,639 | $44.03 | $47.25 | $76.00 | $99.00 |
| 0100 | Misc.optional shoulder (4019905) | SY | 2,490 | $44.03 | $47.25 | $95.00 | $98.00 |
| 0110 | Concrete pavement (8 in. non-reinforced, 15 FT. joints) (5021308) | SY | 428 | $78.60 | $102.75 | $77.00 | $104.00 |
| 0120 | Pipe collar, type A (6044011) | EACH | 1 | $1,615.00 | $3,122.50 | $850.00 | $757.00 |
| 0130 | 3 in. concrete median strip (6083003) | SY | 42 | $100.00 | $89.85 | $140.00 | $165.00 |
| 0140 | Impact attenuator 65 MPH (sand barrel array) (6122017) | EACH | 2 | $1,500.00 | $1,610.00 | $4,500.00 | $1,514.00 |
| 0150 | Replacement sand barrel (6122020) | EACH | 2 | $300.00 | $322.00 | $500.00 | $303.00 |
| 0160 | Construction signs (6161005) | SF | 837 | $7.25 | $7.80 | $9.00 | $7.50 |
| 0170 | Relocated signs (6161010) | SF | 7 | $15.00 | $16.10 | $9.00 | $15.00 |
| 0180 | Channelizer (trim line) (6161025) | EACH | 84 | $24.00 | $25.75 | $16.50 | $24.00 |
| 0190 | Type III moveable barricade (6161030) | EACH | 14 | $230.00 | $247.00 | $185.00 | $232.00 |
| 0200 | Flashing arrow panel (6161040) | EACH | 2 | $1,350.00 | $1,449.00 | $1,700.00 | $1,363.00 |
| 0210 | Changeable message sign with communication interface, contractor furnished, contractor retained (6161099) | EACH | 4 | $4,200.00 | $4,508.50 | $4,000.00 | $4,240.00 |
| 0220 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 800 | $37.00 | $30.35 | $27.00 | $38.00 |
| 0230 | Mobilization (6181000) | LS | 1 | $188,000 | $279,996 | $267,000 | $50,121 |
| 0240 | Additional mobilization for seeding (6181020) | EACH | 4 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0250 | Pavement edge treatment (6191000) | LF | 8,798 | $6.10 | $8.05 | $7.00 | $16.00 |
| 0260 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 254 | $27.00 | $29.00 | $22.50 | $27.00 |
| 0270 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 12 | $275.00 | $295.25 | $335.00 | $278.00 |
| 0280 | Preformed thermoplastic pavement marking, 12 in white, yield line triangles (6200042) | EACH | 4 | $55.00 | $59.05 | $51.00 | $56.00 |
| 0290 | 4 in. yellow high build waterborne pavement marking paint, type L beads (6205901A) | LF | 175 | $2.40 | $2.60 | $1.15 | $2.50 |
| 0300 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 5,765 | $0.38 | $0.40 | $0.50 | $0.40 |
| 0310 | 6 in. yellow high build waterborne pavement marking paint, type L beads (6205903A) | LF | 7,874 | $0.38 | $0.40 | $0.50 | $0.40 |
| 0320 | 4 in. white standard waterborne pavement marking paint, type P beads (6206000C) | LF | 207 | $2.40 | $2.60 | $1.15 | $2.50 |
| 0330 | Pavement marking removal (6207001) | LF | 93 | $3.50 | $3.75 | $6.00 | $3.50 |
| 0340 | Contractor furnished surveying and staking (6274000) | LS | 1 | $12,576 | $20,396 | $50,000 | $12,695 |
| 0350 | 15 in. pipe group A (7261015) | LF | 107 | $80.00 | $126.25 | $95.00 | $76.00 |
| 0360 | 18 in. pipe group A (7261018) | LF | 84 | $89.00 | $136.00 | $100.00 | $81.00 |
| 0370 | Misc.23 in. X 14 in. precast concrete elliptical flared end section (7269902) | EACH | 2 | $3,070.00 | $3,996.50 | $5,000.00 | $2,524.00 |
| 0380 | Misc.18 in. class IV reinforced concrete pipe (7269903) | LF | 117 | $105.00 | $145.75 | $115.00 | $86.00 |
| 0390 | Misc.23 in. X 14 in. class IV reinforced concrete elliptical pipe (7269913) | FT | 51 | $199.00 | $245.00 | $190.00 | $151.00 |
| 0400 | 15 in. or allowed substitute group A flared end section (7320615A) | EACH | 3 | $1,715.00 | $2,501.50 | $2,500.00 | $1,817.00 |
| 0410 | 18 in. or allowed substitute group A flared end section (7320618A) | EACH | 2 | $2,155.00 | $2,831.00 | $2,500.00 | $1,817.00 |
| 0420 | Misc.18 in. precast concrete flared end section (7329902) | EACH | 6 | $2,060.00 | $2,645.50 | $2,500.00 | $1,817.00 |
| 0430 | Misc.median culvert repair (7339901) | LS | 1 | $20,050 | $33,177 | $25,000 | $41,010 |
| 0440 | Seeding - cool season grasses (8051000A) | ACRE | 2.50 | $1,800.00 | $1,986.00 | $2,100.00 | $2,019.00 |
| 0450 | Sediment trap excavation (8061003) | CY | 12 | $35.00 | $45.20 | $50.00 | $138.00 |
| 0460 | Sediment trap rock (8061004) | CY | 12 | $120.00 | $90.10 | $125.00 | $89.00 |
| 0470 | Alternate ditch check (8061006) | LF | 1,910 | $8.31 | $11.80 | $15.00 | $8.00 |
| 0480 | Sediment removal (8061016) | CY | 210 | $14.55 | $16.00 | $23.00 | $178.00 |
| 0490 | Silt fence (8061019) | LF | 739 | $5.10 | $4.10 | $5.00 | $3.00 |
| 0500 | Type 3 turf reinforcement mat (8064130) | SY | 9,962 | $5.10 | $4.15 | $4.50 | $7.00 |
| 0510 | Type 3B erosion control blanket (8064140) | SY | 7,317 | $1.65 | $2.30 | $2.50 | $2.50 |
| 0520 | Relocated pole (9011010) | EACH | 1 | $2,005.00 | $2,152.50 | $2,300.00 | $1,090.00 |
| 0530 | Lighting pole, 45 FT. or 13.5 M, type at design 1 (9011060) | EACH | 1 | $3,285.00 | $3,526.50 | $3,700.00 | $4,586.00 |
| 0540 | Lighting pole, 45 FT. or 13.5 M, type at design 2 (9011062) | EACH | 6 | $3,210.00 | $3,446.00 | $3,700.00 | $3,958.00 |
| 0550 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 8 | $1,355.00 | $1,454.50 | $1,600.00 | $1,244.00 |
| 0560 | Luminaire, LED-B (9011312) | EACH | 8 | $470.00 | $504.50 | $550.00 | $467.00 |
| 0570 | Base mounted control station 240 volt - 4 circuit (9012230) | EACH | 2 | $3,280.00 | $3,521.00 | $3,700.00 | $1.00 |
| 0580 | Conduit, 2 in. rigid, in trench (9013002) | LF | 51 | $43.00 | $46.15 | $50.00 | $20.00 |
| 0590 | Conduit, 4 in. rigid, pushed (9014004) | LF | 602 | $24.00 | $25.75 | $30.00 | $37.00 |
| 0600 | Trenching type I (9015010) | LF | 4,143 | $3.40 | $3.65 | $4.00 | $7.00 |
| 0610 | Pull box, preformed class 1 (9016110) | EACH | 13 | $1,280.00 | $1,374.00 | $1,500.00 | $1,837.00 |
| 0620 | Cable, 2 AWG 1 conductor (9017002) | LF | 230 | $8.25 | $8.85 | $10.00 | $4.00 |
| 0630 | Cable, 6 AWG 1 conductor (9017006) | LF | 4,120 | $5.90 | $6.35 | $6.60 | $2.50 |
| 0640 | Cable, 8 AWG 1 conductor (9017008) | LF | 1,000 | $4.85 | $5.20 | $5.50 | $2.00 |
| 0650 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 840 | $1.20 | $1.30 | $1.35 | $1.50 |
| 0660 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 7 | $1,305.00 | $1,401.00 | $1,500.00 | $2,461.00 |
| 0670 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 2 | $3,285.00 | $3,526.50 | $7,400.00 | $11,104 |
| 0680 | Concrete footings, embedded (9031010) | CY | 15 | $1,100.00 | $1,181.00 | $1,200.00 | $1,110.00 |
| 0690 | Pipe posts (9031220) | LB | 9,130 | $5.00 | $5.35 | $5.75 | $5.00 |
| 0700 | 2 in. PSST post - 12 GA. (9031270A) | LF | 280 | $20.00 | $21.45 | $22.50 | $20.00 |
| 0710 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 17 | $185.00 | $198.50 | $210.00 | $187.00 |
| 0720 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 88 | $21.00 | $22.55 | $24.00 | $21.00 |
| 0730 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 5 | $200.00 | $214.75 | $225.00 | $202.00 |
| 0740 | SH-flat sheet (9035004A) | SF | 793 | $17.00 | $18.25 | $19.00 | $17.00 |
| 0750 | SHF-flat sheet fluorescent (9035069A) | SF | 36 | $18.50 | $19.85 | $20.00 | $19.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of March 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way