MoDOT contract 250314-F04 bid tabulation

JST0134 - ROUTE V - FRANKLIN COUNTY. Let by Missouri DOT on March 14, 2025, Franklin, St. Louis. 4 bids received; low bid $607,364 by Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction.

Owner
Missouri DOT
Letting
14 MAR 2025
Pay items
10
Data through
16 OCT 2026

Bidders

MoDOT contract 250314-F04: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction2. N.B. West Contracting Company3. Pace Construction Company, LLC4. Gershenson Construction Co., Inc.
0010Gravel (A) or crushed stone (B) (3105002)TON14$40.00$356.00$436.70$99.89
0020Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON6,443$78.00$80.65$84.50$86.65
0030Tack coat (4071005)GAL9,565$3.30$2.15$2.60$3.80
0040Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A)EACH2$3,000.00$3,000.00$3,000.00$2,200.00
0050Misc.temporary traffic control (6169901)LS1$2,000.00$6,532.00$6,532.00$32,012
0060Mobilization (6181000)LS1$35,000$17,971$61,396$30,070
0070Preformed thermoplastic pavement marking, 24 in. white (6200015)LF35$20.00$20.00$20.00$50.00
00804 in. white standard waterborne pavement marking paint, type P beads (6206000C)LF80,995$0.11$0.11$0.11$0.15
00904 in. yellow standard waterborne pavement marking paint, type P beads (6206001C)LF80,995$0.10$0.10$0.10$0.14
0100Modified coldmilling (depth transitions) (6224010)SY932$12.85$16.75$14.75$12.85
MoDOT contract 250314-F04: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of March 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy