MoDOT contract 250919-G3A bid tabulation
JSR0310 - ROUTE 52 - BATES COUNTY. Let by Missouri DOT on September 19, 2025, Bates, Southwest. 3 bids received; low bid $4,672,063 by APAC-Central, Inc..
- Owner
- Missouri DOT
- Letting
- 19 SEP 2025
- Pay items
- 29
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | APAC-Central, Inc. | $4,672,063 | Low |
| 2 | Emery Sapp & Sons, Inc. | $4,795,994 | +3.0% |
| 3 | Capital Paving & Construction, LLC | $5,367,174 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. APAC-Central, Inc. | 2. Emery Sapp & Sons, Inc. | 3. Capital Paving & Construction, LLC |
|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0025 | Shaping slopes, class III (2153000) | 100F | 2 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0030 | Misc.permanent aggregate edge treatment (3049910) | TON | 5,308.80 | $17.00 | $45.75 | $46.24 |
| 0040 | Gravel (A) or crushed stone (B) (3105002) | TON | 1,118 | $56.15 | $52.00 | $46.24 |
| 0050 | Bituminous pavement mixture PG64-22, (BP-2) (4011211) | TON | 41,586 | $88.25 | $88.75 | $103.10 |
| 0060 | Tack coat (4071005) | GAL | 41,904 | $2.65 | $3.00 | $2.74 |
| 0070 | Prime-liquid asphalt MC 800 (4081018) | GAL | 15,662 | $3.05 | $3.50 | $3.80 |
| 0080 | Construction signs (6161005) | SF | 2,205 | $6.60 | $6.50 | $6.50 |
| 0090 | Channelizer (trim-line) (6161025) | EACH | 100 | $21.25 | $21.00 | $21.00 |
| 0095 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 4 | $4,550.05 | $4,500.00 | $4,500.00 |
| 0120 | Mobilization (6181000) | LS | 1 | $311,272 | $277,890 | $220,450 |
| 0130 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 50 | $44.50 | $25.00 | $44.00 |
| 0140 | Preformed thermoplastic pavement marking, R/R crossing marker (6200033) | EACH | 2 | $1,769.50 | $1,200.00 | $1,750.00 |
| 0150 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 287,070 | $0.11 | $0.15 | $0.11 |
| 0160 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 135,380 | $0.11 | $0.14 | $0.11 |
| 0170 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 6,056 | $2.65 | $3.05 | $6.87 |
| 0180 | Modified coldmilling (depth transitions) (6224010) | SY | 5,000 | $6.80 | $5.25 | $15.88 |
| 0190 | Bituminous shoulder rumble strip (6261000A) | STA | 2,478.70 | $22.75 | $19.25 | $5.30 |
| 0200 | Contractor furnished surveying and staking (6274000) | LS | 1 | $1,000.00 | $3,000.00 | $5,000.00 |
| 0220 | MGS guardrail (6061060) | LF | 1,250 | $24.00 | $24.00 | $24.00 |
| 0230 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $3,600.00 | $3,600.00 | $3,600.00 |
| 0240 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 2 | $2,950.00 | $2,950.00 | $2,950.00 |
| 0250 | Scarification of bridge deck (2161000) | SY | 953 | $16.20 | $9.75 | $7.46 |
| 0260 | Removal of asphalt wearing surface (2161501) | SF | 8,580 | $1.90 | $1.10 | $0.83 |
| 0270 | Emulsified asphalt, seal coat (4091048) | GAL | 381 | $4.60 | $3.60 | $16.24 |
| 0280 | Seal coat aggregate, grade B1 (4094011) | SY | 953 | $12.70 | $10.20 | $24.41 |
| 0290 | Misc.misc (barrier ED modification) (7039902) | EACH | 4 | $10,100 | $9,500.00 | $7,000.00 |
| 0300 | Misc.(cored void tube weep holes) (7049902) | EACH | 156 | $252.50 | $150.00 | $200.16 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.