MoDOT contract 251212-H2A bid tabulation
J9S3696-ROUTE 95, VV-DENT, LACLEDE, TEXAS, WRIGHT COUNTIES. Let by Missouri DOT on December 12, 2025, Wright, Southeast. 5 bids received; low bid $2,976,000 by Pace Construction Company, LLC.
- Owner
- Missouri DOT
- Letting
- 12 DEC 2025
- Pay items
- 32
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pace Construction Company, LLC | $2,976,000 | Low |
| 2 | Magruder Paving, LLC | $3,184,345 | +7.0% |
| 3 | APAC-Central, Inc. | $3,527,486 | +19% |
| 4 | Apex Paving Co. | $3,624,050 | +22% |
| 5 | Capital Paving & Construction, LLC | $3,816,997 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pace Construction Company, LLC | 2. Magruder Paving, LLC | 3. APAC-Central, Inc. | 4. Apex Paving Co. | 5. Capital Paving & Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $2,857.88 | $1,000.00 | $2,650.56 | $2,624.05 | $1,000.00 |
| 0020 | Misc.shaping slopes class III - modified material requirement (2159903) | LF | 500 | $15.42 | $10.00 | $15.58 | $15.42 | $20.00 |
| 0030 | Misc.permanent aggregate edge treatment (3049910) | TON | 1,163.60 | $68.50 | $51.50 | $17.00 | $42.72 | $60.82 |
| 0045 | Gravel (A) or crushed stone (B) (3105002) | TON | 205.40 | $94.00 | $80.81 | $37.54 | $42.71 | $60.82 |
| 0050 | Bituminous pavement mixture PG64-22 (surface leveling) (4020520) | TON | 29,475.10 | $72.75 | $80.79 | $93.36 | $92.29 | $101.17 |
| 0060 | Tack coat (4071005) | GAL | 42,584.60 | $2.50 | $3.33 | $2.78 | $2.15 | $2.30 |
| 0070 | Prime-liquid asphalt MC 800 (4081018) | GAL | 2,493.40 | $3.80 | $4.61 | $2.80 | $4.46 | $3.63 |
| 0080 | Work zone crash cushion (narrow) (6122040) | EACH | 2 | $6,500.00 | $6,500.00 | $6,161.62 | $6,500.00 | $6,500.00 |
| 0090 | Work zone crash cushion (narrow) (relocation) (6122041) | EACH | 2 | $1,000.00 | $1,000.00 | $1,767.68 | $1,000.00 | $1,000.00 |
| 0100 | Channelizer (trim-line) (6161025) | EACH | 200 | $18.00 | $24.00 | $18.18 | $18.27 | $8.00 |
| 0110 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $4,500.00 | $4,500.00 | $4,545.46 | $4,568.53 | $4,000.00 |
| 0120 | Work zone traffic signal system (6162000A) | EACH | 1 | $8,200.00 | $3,800.00 | $4,141.41 | $4,162.44 | $6,000.00 |
| 0130 | Temporary long-term rumble strips (6162002) | EACH | 2 | $130.00 | $1,200.00 | $1,414.14 | $1,421.32 | $1,780.00 |
| 0140 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $19,995 | $28,415 | $20,157 | $20,259 | $44,700 |
| 0150 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 750 | $27.00 | $27.00 | $27.55 | $27.00 | $27.00 |
| 0160 | Relocating temporary traffic barrier (6175010A) | LF | 750 | $12.00 | $12.00 | $12.24 | $12.00 | $12.00 |
| 0170 | Mobilization (6181000) | LS | 1 | $205,000 | $154,195 | $251,000 | $362,750 | $222,650 |
| 0180 | Temporary removable marking tape 4 in., white (6205301B) | LF | 1,486 | $3.00 | $3.00 | $3.29 | $3.00 | $3.25 |
| 0190 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 2,000 | $3.00 | $3.00 | $1.11 | $3.00 | $1.10 |
| 0200 | Temporary removable marking tape, 24 in., white (6205309) | LF | 22 | $10.00 | $10.00 | $10.11 | $10.00 | $10.00 |
| 0210 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 301,655 | $0.14 | $0.14 | $0.13 | $0.14 | $0.13 |
| 0220 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 304,594 | $0.14 | $0.14 | $0.09 | $0.14 | $0.09 |
| 0230 | Pavement marking removal (6207001) | LF | 3,508 | $2.00 | $2.00 | $1.67 | $2.00 | $1.65 |
| 0235 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 2,514.30 | $5.00 | $14.09 | $6.22 | $5.61 | $5.37 |
| 0240 | Modified coldmilling (depth transitions) (6224010) | SY | 5,021.50 | $7.75 | $7.30 | $4.70 | $6.12 | $13.49 |
| 0250 | Bituminous shoulder rumble strip (6261000A) | STA | 915.20 | $29.00 | $19.91 | $25.31 | $12.00 | $12.00 |
| 0260 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 150 | $41.17 | $32.00 | $41.59 | $41.17 | $40.00 |
| 0270 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $3,755.33 | $3,800.00 | $3,793.26 | $3,755.33 | $4,200.00 |
| 0280 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,342.09 | $3,800.00 | $3,375.85 | $3,342.09 | $4,000.00 |
| 0310 | Curb blockout (7034600) | LF | 509 | $150.00 | $138.00 | $150.00 | $138.00 | $138.00 |
| 0320 | Cleaning and epoxy coating (7040113) | SF | 1,900 | $10.50 | $9.50 | $9.63 | $9.50 | $9.50 |
| 0330 | Protective coating - concrete bents and piers (urethane) (7110100) | LS | 1 | $4,400.00 | $4,000.00 | $4,053.00 | $4,000.00 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of December 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.