MoDOT contract 260515-H02 bid tabulation
J9P3855 - ROUTE 61 - STE GENEVIEVE COUNTY. Let by Missouri DOT on May 15, 2026, Ste Genevieve, Southeast. 4 bids received; low bid $789,457 by Fronabarger Concreters, Inc..
- Owner
- Missouri DOT
- Letting
- 15 MAY 2026
- Pay items
- 61
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Fronabarger Concreters, Inc. | $789,457 | Low |
| 2 | Kimes Contracting LLC | $803,750 | +2.0% |
| 3 | RL Persons Construction, Inc. | $989,995 | +25% |
| 4 | N.B. West Contracting Company | $1,197,000 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fronabarger Concreters, Inc. | 2. Kimes Contracting LLC | 3. RL Persons Construction, Inc. | 4. N.B. West Contracting Company |
|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $48,500 | $65,000 | $86,000 | $100,000 |
| 0020 | Demolition and removal of buildingscolormoor property (2029950) | LS | 1 | $12,000 | $20,000 | $25,000 | $25,000 |
| 0030 | Unclassified excavation (2035000) | CY | 1,412 | $20.00 | $20.00 | $24.50 | $31.00 |
| 0040 | Compacting embankment (2036000) | CY | 1,130 | $8.00 | $20.00 | $5.50 | $17.00 |
| 0050 | Class 3 excavation (2063000) | CY | 389 | $30.00 | $30.00 | $50.00 | $26.50 |
| 0060 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 9.10 | $1,100.00 | $500.00 | $1,510.00 | $1,780.00 |
| 0070 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 1,622 | $9.00 | $7.50 | $11.95 | $24.00 |
| 0080 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 2,111 | $12.00 | $10.50 | $15.00 | $25.00 |
| 0090 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 80.40 | $343.29 | $165.00 | $175.00 | $150.00 |
| 0100 | Misc.optional pavement (4039905) | SY | 2,071.50 | $93.00 | $85.00 | $98.50 | $105.00 |
| 0110 | Tack coat (4071005) | GAL | 72 | $3.78 | $15.00 | $9.65 | $4.09 |
| 0120 | Misc.adjustment of monitoring well (6049902) | EACH | 3 | $450.00 | $300.00 | $6,000.00 | $379.00 |
| 0130 | Concrete curb ramp (6081010) | SY | 35.60 | $165.00 | $135.00 | $135.00 | $1,050.00 |
| 0140 | Truncated domes (6081012) | SF | 26 | $25.00 | $60.00 | $50.00 | $30.00 |
| 0150 | Paved approach, 8 in. (6085008) | SY | 1,038 | $92.00 | $100.00 | $86.50 | $166.00 |
| 0160 | Concrete sidewalk, 4 in. (6086004) | SY | 149.80 | $110.00 | $72.00 | $95.05 | $185.00 |
| 0170 | Misc.island tubular marker (6089902) | EACH | 5 | $100.00 | $125.00 | $165.00 | $125.00 |
| 0180 | Misc.3 in. tinted concrete median strip (6089905) | SY | 22 | $165.00 | $200.00 | $360.00 | $305.00 |
| 0190 | Concrete curb (6 in. height and under) type S (6091010) | LF | 112 | $40.00 | $35.00 | $110.00 | $61.00 |
| 0200 | Concrete curb (over 6 in. height) type S (6091011) | LF | 102 | $48.00 | $55.00 | $120.00 | $67.00 |
| 0210 | Concrete gutter type A (6091041) | LF | 57 | $75.00 | $40.00 | $69.25 | $282.00 |
| 0220 | Curb and gutter type B (6091052) | LF | 782 | $45.00 | $36.00 | $65.00 | $99.00 |
| 0230 | Paved ditch (6091060) | SY | 3.80 | $350.00 | $100.00 | $435.00 | $647.00 |
| 0240 | Concrete curb low profile type E (6092031) | LF | 24 | $20.00 | $50.00 | $100.00 | $127.00 |
| 0250 | Furnishing type 1 rock ditch liner (6096010A) | CY | 39 | $65.00 | $40.00 | $40.50 | $68.00 |
| 0260 | Placing type 1 rock ditch liner (6096041) | CY | 39 | $45.00 | $40.00 | $18.50 | $51.00 |
| 0270 | Rock lining (6097000) | CY | 4 | $125.00 | $80.00 | $140.00 | $636.00 |
| 0280 | Misc.3 FT. rollback curb & gutter (6099903) | LF | 53 | $65.00 | $40.00 | $105.00 | $67.00 |
| 0290 | Curved vane grate and frame (2 FT. X 2 FT. or 600MM X 600MM) (6141120) | EACH | 1 | $700.00 | $600.00 | $2,150.00 | $518.00 |
| 0300 | Manhole frame and cover, type 3 (6143013) | EACH | 5 | $450.00 | $450.00 | $725.00 | $309.00 |
| 0310 | Construction signs (6161005) | SF | 1,103 | $7.50 | $7.00 | $12.85 | $5.50 |
| 0320 | Channelizer (trim-line) (6161025) | EACH | 45 | $18.00 | $30.00 | $51.00 | $18.00 |
| 0330 | Type 3 moveable barricade (6161030) | EACH | 17 | $155.00 | $200.00 | $161.00 | $125.00 |
| 0340 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 6 | $2,500.00 | $3,100.00 | $3,215.00 | $2,500.00 |
| 0350 | Mobilization (6181000) | LS | 1 | $58,000 | $80,000 | $92,179 | $120,922 |
| 0360 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 81 | $23.00 | $26.00 | $29.60 | $23.00 |
| 0370 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 28 | $23.00 | $26.00 | $29.60 | $23.00 |
| 0380 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 5 | $45.00 | $60.00 | $130.00 | $100.00 |
| 0390 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 466 | $0.50 | $1.15 | $1.95 | $1.50 |
| 0400 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 2,046 | $0.50 | $1.15 | $1.95 | $1.50 |
| 0410 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 573 | $29.48 | $26.00 | $19.25 | $15.00 |
| 0420 | Contractor furnished surveying and staking (6274000) | LS | 1 | $10,000 | $16,000 | $9,725.00 | $14,400 |
| 0430 | 15 in. pipe group A (7261015) | LF | 537 | $85.00 | $85.00 | $120.00 | $90.00 |
| 0440 | Precast concrete drop inlet 2 FT X 2 FT (7311022) | FT | 3 | $1,000.00 | $600.00 | $895.00 | $950.00 |
| 0450 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 18 | $1,100.00 | $625.00 | $1,010.00 | $1,210.00 |
| 0460 | Misc.modified type T inlet 5 FT X 3 FT (7319913) | FT | 5 | $1,350.00 | $650.00 | $1,750.00 | $1,080.00 |
| 0470 | 15 in. or allowed substitute group A flared end section (7320615A) | EACH | 1 | $950.00 | $2,500.00 | $1,350.00 | $1,350.00 |
| 0480 | Misc.seeding and mulch (8059901) | LS | 1 | $7,500.00 | $8,000.00 | $4,950.00 | $3,850.00 |
| 0490 | Sediment trap excavation (8061003) | CY | 10 | $40.00 | $10.00 | $68.95 | $55.00 |
| 0500 | Sediment trap rock (8061004) | CY | 10 | $85.00 | $10.00 | $155.00 | $85.00 |
| 0510 | Alternate ditch check (8061006) | LF | 252 | $10.00 | $15.00 | $15.50 | $12.00 |
| 0520 | Curb inlet check (8061007A) | EACH | 3 | $150.00 | $125.00 | $65.00 | $50.00 |
| 0530 | Sediment removal (8061016) | CY | 34 | $45.00 | $10.00 | $75.00 | $55.00 |
| 0540 | Concrete footings, embedded (9031010) | CY | 1.80 | $1,000.00 | $2,900.00 | $3,600.00 | $2,800.00 |
| 0550 | Pipe posts (9031220) | LB | 860 | $10.00 | $8.25 | $10.50 | $8.00 |
| 0560 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 144 | $20.00 | $36.75 | $46.25 | $36.00 |
| 0570 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 8 | $125.00 | $255.00 | $315.00 | $250.00 |
| 0580 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 1 | $250.00 | $305.00 | $385.00 | $300.00 |
| 0590 | SH-flat sheet (9035004A) | SF | 48 | $30.00 | $33.00 | $41.25 | $32.00 |
| 0600 | ST-structural (9035011A) | SF | 48 | $26.00 | $40.00 | $50.00 | $38.00 |
| 0610 | SHF-flat sheet fluorescent (9035069A) | SF | 38 | $40.00 | $40.00 | $46.50 | $36.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.