Kyle Conti Construction, LLC: NJDOT bid record
Kyle Conti Construction, LLC submitted 22 bids on New Jersey DOT contracts in the data, from 30 NOV 2017 to 19 FEB 2026, and was the low bidder on 2 of them (9%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $17,954,224
- Latest bid
- 19 FEB 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 3 | 0 | 0% |
| 2020 | 3 | 1 | 33% |
| 2021 | 2 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
| 2025 | 7 | 1 | 14% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C1 | 7 | 1 | 14% |
| N1 | 6 | 0 | 0% |
| C4 | 4 | 1 | 25% |
| H4 | 2 | 0 | 0% |
| S1 | 1 | 0 | 0% |
| S4 | 1 | 0 | 0% |
| N4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sheeting | 501003P | SF | 51 | 41 (80%) | $1.00 | $18.06 |
| Crosshole sonic logging | 503012M | U | 23 | 13 (57%) | $1,000.00 | $2,500.00 |
| Concrete pier column and cap, HPC | 504026P | CY | 41 | 12 (29%) | $2,500.00 | $2,291.62 |
| Fuel price adjustment | 160004M | DOL | 12 | 12 (100%) | $4,450.00 | $2,700.00 |
| 3" rigid metallic conduit | 701021P | LF | 20 | 11 (55%) | $46.50 | $65.00 |
| Asphalt price adjustment | 160007M | DOL | 9 | 9 (100%) | $30,400 | $10,200 |
| Breakaway barricade | 159003M | U | 16 | 8 (50%) | $28.00 | $1.00 |
| Hot mix asphalt pavement repair | 401021M | SY | 16 | 8 (50%) | $46.00 | $75.00 |
| Traffic cone | 159009M | U | 15 | 8 (53%) | $1.00 | $9.20 |
| Full depth concrete pavement repair, HMA | 453006M | SY | 11 | 8 (73%) | $50.00 | $200.00 |
| Construction signs | 159012M | SF | 20 | 7 (35%) | $15.75 | $15.00 |
| Traffic stripes, 4" | 610003M | LF | 20 | 7 (35%) | $0.50 | $0.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 10 | 4 of 10 |
| Crisdel Group, Inc. | 7 | 1 of 7 |
| D'Annunzio & Sons, Inc. | 7 | 3 of 7 |
| Schifano Construction Corp. | 7 | 6 of 7 |
| Della Pello Paving, Inc. | 7 | 2 of 7 |
| Earle Asphalt Company | 6 | 3 of 6 |
| Anselmi & Decicco, Inc. | 6 | 3 of 6 |
| Ferreira Construction Co., Inc. | 6 | 3 of 6 |
| Black Rock Enterprises, LLC | 6 | 1 of 6 |
| Midlantic Construction, LLC | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 FEB 2026 | 26402 | N1 | Maintenance Roadway Contract N112 | 8 of 9 | $9,595,959 | +28% |
| 15 JAN 2026 | 26404 | C4 | MTN ROADWAY CONTRACT C316 | 3 of 7 | $11,139,931 | +8.0% |
| 13 JAN 2026 | 26401 | N4 | MTN ROADWAY CONTRACT N111, DP No. 26401 | 3 of 6 | $10,321,123 | +35% |
| 09 DEC 2025 | 26403 | C4 | MTN ROADWAY CONTRACT C219, DP No. 26403 | 1 of 7 | $9,698,969 | Low, 2.0% under the second |
| 20 NOV 2025 | 25422 | H4 | MTN JOC Basin Restoration Contract, Statewide 2025 | 3 of 3 | $3,542,500 | +38% |
| 30 OCT 2025 | 25130 | N1 | Rt 15 NB, Bridge over Abandoned Mount Hope Mineral Railroad | 4 of 4 | $34,444,443 | +48% |
| 01 MAY 2025 | 25407 | S4 | MAINTENANCE ROADWAY CONTRACT S215 | 3 of 3 | $8,268,862 | +38% |
| 18 MAR 2025 | 25438 | C4 | MTN Infrastructure Repair Central - 2025 | 7 of 7 | $9,898,989 | +66% |
| 27 FEB 2025 | 25404 | C4 | MTN ROADWAY CONTRACT C119, DP 25404 | 3 of 6 | $9,470,749 | +21% |
| 30 JAN 2025 | 24154 | C1 | Rt 1, Townsley St to Garden State Parkway | 2 of 6 | $3,397,933 | +6.0% |
| 19 DEC 2024 | 24440 | H4 | MTN JOC Basin Restoration Contract, Statewide 2024 | 3 of 4 | $3,515,000 | +8.0% |
| 21 NOV 2024 | 24143 | N1 | Route 80 EB, Ridgeway Avenue to Route 206 | 4 of 6 | $8,448,448 | +9.0% |
| 10 JUN 2021 | 21131 | S1 | Route 42 Bridges Over Blackwood Railroad Trail | 4 of 10 | $25,151,152 | +18% |
| 27 MAY 2021 | 21121 | N1 | Rt 22 Rockfall Mitigation, Phillipsburg | 2 of 6 | $6,144,416 | +23% |
| 21 MAY 2020 | 20120 | C1 | Milltown Rd/North Main St (CR 606), Bridge over Rt 1 | 7 of 10 | $11,333,311 | +30% |
| 16 APR 2020 | 20117 | C1 | SIGN STRUCTURE REPLACEMENT 2016-5 | 3 of 6 | $10,555,555 | +14% |
| 19 MAR 2020 | 20101 | C1 | CR 577 (Main Street) Bridge over Route 78 | 1 of 10 | $8,255,255 | Low, 7.0% under the second |
| 31 DEC 2019 | 19147 | C1 | RIVER ROAD, BRIDGE OVER RARITAN VALLEY RAILROAD | 3 of 5 | $5,624,826 | +28% |
| 30 JUL 2019 | 19128 | N1 | ROUTE 78, BRIDGES OVER ROUTE 202/206 | 8 of 9 | $36,103,939 | +30% |
| 17 JAN 2019 | 18147 | C1 | SIGN STRUCTURE REPLACEMENT CONTRACT 2013-2 | 2 of 6 | $16,327,191 | +5.0% |
| 27 NOV 2018 | 18138 | N1 | Route 80, Bridges over Rockaway River | 3 of 5 | $22,787,879 | +10% |
| 30 NOV 2017 | 17144 | C1 | ROUTE US 206 BYPASS - CONTRACT B SEC 14A & 15A | 2 of 13 | $38,888,889 | +6.0% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.