National Water Main Cleaning Company: NJDOT bid record
National Water Main Cleaning Company submitted 14 bids on New Jersey DOT contracts in the data, from 10 JAN 2019 to 28 OCT 2025, and was the low bidder on 8 of them (57%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $52,908,267
- Latest bid
- 28 OCT 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 0 | 0% |
| 2020 | 1 | 0 | 0% |
| 2021 | 1 | 1 | 100% |
| 2022 | 2 | 1 | 50% |
| 2023 | 3 | 0 | 0% |
| 2024 | 3 | 3 | 100% |
| 2025 | 3 | 3 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 5 | 2 | 40% |
| S4 | 3 | 2 | 67% |
| C4 | 3 | 2 | 67% |
| N4 | 2 | 1 | 50% |
| N1 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Manhole cover | 602207M | U | 7 | 5 (71%) | $1,200.00 | $707.50 |
| Bicycle safe grate | 602210M | U | 7 | 4 (57%) | $1,300.00 | $469.00 |
| Selective clearing | 801012M | SY | 6 | 4 (67%) | $3.00 | $15.00 |
| Flashing arrow board, 4' X 8' | MMR060M | DAY | 6 | 4 (67%) | $1.00 | $1.00 |
| Traffic control truck with mounted crash cushion and flashing arrow board, 4' X 8' | MMG008M | DAY | 5 | 4 (80%) | $265.00 | $1.00 |
| Video inspection of pipe | 601664M | LF | 9 | 3 (33%) | $5.80 | $6.00 |
| Performance bond and payment bond | 151006M | DOL | 8 | 3 (38%) | $32,500 | $32,468 |
| Excavation, unclassified | 202009P | CY | 9 | 2 (22%) | $35.00 | $78.60 |
| Field office type C set UP | 155009M | U | 8 | 2 (25%) | $35,000 | $38,053 |
| Field office type C maintenance | 155027M | MO | 8 | 2 (25%) | $3,000.00 | $3,500.00 |
| Culvert cleaning | MMD059M | LF | 5 | 1 (20%) | $35.00 | $30.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mount Construction Co., Inc. | 8 | 5 of 8 |
| Joseph M. Sanzari, Inc. | 5 | 2 of 5 |
| Colonnelli Brothers, Inc. | 1 | 0 of 1 |
| Jrcruz Corp. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2025 | 25468 | N4 | Re-Advertisement Drainage Restoration Contract, North-2025 | 1 of 3 | $11,208,778 | Low, 6.0% under the second |
| 23 OCT 2025 | 25469 | S4 | Re-Adv Drainage Restoration Contract, South-2025 | 1 of 1 | $7,217,770 | Low |
| 03 JUN 2025 | 25420 | C4 | Drainage Restoration Contract, Central-2025 | 1 of 1 | $6,777,457 | Low |
| 04 JUN 2024 | 24417 | N1 | Drainage Restoration Contract, North-2024-1 | 1 of 1 | $5,905,777 | Low |
| 30 MAY 2024 | 24421 | S4 | Drainage Restoration Contract, South-2024-1 | 1 of 1 | $4,401,777 | Low |
| 21 MAY 2024 | 24419 | C4 | Drainage Restoration Contract, Central-2024-1 | 1 of 1 | $4,931,578 | Low |
| 11 MAY 2023 | 23454 | N4 | Drainage Restoration Contract, North-2023 | 2 of 3 | $4,482,386 | +2.0% |
| 04 MAY 2023 | 23455 | C4 | Drainage Restoration Contract, Central-2023 | 2 of 3 | $6,717,706 | +4.0% |
| 27 APR 2023 | 23456 | S4 | Drainage Restoration Contract, South-2023 | 2 of 2 | $6,177,798 | +1.0% |
| 09 JUN 2022 | 22454 | H4 | Drainage Restoration Contract Statewide 2022-2 | 3 of 3 | $5,195,204 | +25% |
| 02 JUN 2022 | 22453 | H4 | Drainage Restoration Contract Statewide 2022-1 | 1 of 4 | $6,160,935 | Low, 4.0% under the second |
| 18 NOV 2021 | 20453 | H4 | Drainage Restoration Contract, Statewide 2020 | 1 of 3 | $6,304,196 | Low, 13% under the second |
| 30 JUL 2020 | 19482 | H4 | Drainage Restoration Contract Statewide 2019 | 2 of 2 | $8,198,871 | +24% |
| 10 JAN 2019 | 18463 | H4 | DRAINAGE RESTORATION CONTRACT, STATEWIDE-2018 | 2 of 2 | $4,832,453 | +20% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.