NYSDOT contract D265413 bid tabulation

HIGHWAY - ADA IMPROVEMENTS - US RT 11, NYS RT 12E, 180, 411. Let by New York State DOT on January 23, 2025, Jefferson, Region 07. 4 bids received; low bid $1,182,132 by Bothar Construction LLC.

Owner
New York State DOT
Letting
23 JAN 2025
Pay items
41
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Bothar Construction LLC$1,182,132Low
2Tadcon Electric LLC$1,545,331+31%
3Mattoon Construction Services Inc$1,545,877+31%
4Vector Construction Corp$1,669,999+41%
NYSDOT contract D265413: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bothar Construction LLC2. Tadcon Electric LLC3. Mattoon Construction Services Inc4. Vector Construction Corp
1Unclassified Excavation and Disposal (203.02)CY717$103.00$158.45$91.83$100.00
2Embankment In Place (203.03)CY42$57.00$156.04$439.85$350.00
3Seed and Mulch – Temporary (209.1003)SY1,020$5.50$5.54$18.42$6.00
4Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703)LF50$65.44$50.93$57.79$25.00
5Subbase Course, Type 2 (304.12)CY349$148.00$424.61$188.82$200.00
6 (404.0001)TON9$75.00$75.00$75.00$75.00
7 (404.0983)TON44$443.00$1,183.92$287.64$500.00
8 (404.2589)TON118$253.00$491.67$183.36$500.00
9Stabilized Gravel Surface Course (411.01)CY1$493.90$340.24$528.78$150.00
10 (604.070101)EACH2$1,125.00$1,132.32$895.63$3,400.00
11Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$75.00$75.00$75.00$75.00
12Concrete Sidewalks and Driveways (608.0101)CY95$2,400.00$3,306.80$3,172.67$2,500.00
13Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON9$250.70$438.93$393.20$500.00
14 (608.21000003)152$285.65$504.58$570.97$675.00
15 (609.0401)LF837$127.00$159.33$74.58$180.00
16Turf Establishment – Performance (610.1605)SY511$28.00$12.84$22.85$25.00
17 (615.02060124)1$1,209.00$7,739.39$1,296.53$5,000.00
18Basic Work Zone Traffic Control (Daily Operations) (619.0101)LS1$360,000$266,101$404,409$625,000
19Type III Construction Barricades (619.04)EACH50$200.00$415.86$150.27$340.00
20 (619.080102)LF3,114$3.25$3.60$9.97$4.00
21Survey Operations (625.01)LS1$11,000$3,600.00$141,376$15,000
22 (625.09010015)LS1$998.00$3,600.00$11,000$100.00
23 (627.50140008)2,571$6.00$22.89$18.53$8.00
24Cleaning and Preparation of Pavement Surfaces-Lines (635.0103)LF3,681$2.85$3.60$4.05$4.00
25Engineer’s Field Office – Type 2 (637.12)MONTH18$2,000.00$4,047.99$2,510.25$2,000.00
26Office Technology and Supplies (637.34)DOL3,000$1.00$1.00$1.00$1.00
27Construction Testing supplies – Consumables (637.36)DOL120$1.00$1.00$1.00$1.00
28Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF6$69.40$448.49$416.55$500.00
29Type A Sign Posts (645.81)EACH24$342.50$224.60$280.18$500.00
30Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH20$253.65$395.24$181.87$400.00
31Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH18$169.10$191.86$73.95$90.00
32Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH18$169.10$119.39$84.95$90.00
33Adjust Existing Valve Box Elevation (663.33)EACH2$391.10$451.86$1,369.13$2,000.00
34Adjust Existing Hydrant Elevation (663.34)EACH1$2,500.00$2,603.31$2,572.42$2,000.00
35 (670.14480010)1$617.85$3,032.39$605.70$2,000.00
36White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF3,812$4.50$4.80$7.50$6.00
37Field Change Payment (FCP) (697.03)DOL53,000$1.00$1.00$1.00$1.00
38Asphalt Price Adjustment (698.04)DOL312$1.00$1.00$1.00$1.00
39Fuel Price Adjustment (698.05)DOL202$1.00$1.00$1.00$1.00
40Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00
41Mobilization (699.040001)LS1$45,402$59,436$59,457$50,000
NYSDOT contract D265413: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy