ODOT contract 250350 bid tabulation
WAY-SR 57-04.819 (TWO LANE RESURFACING). Let by Ohio DOT on July 17, 2025, WAY. 2 bids received; low bid $1,115,657 by Kokosing Construction Company Inc.
- Owner
- Ohio DOT
- Letting
- 17 JUL 2025
- Pay items
- 39
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $1,115,657 | Low |
| 2 | Karvo Companies Inc | $1,207,214 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. Karvo Companies Inc |
|---|---|---|---|---|---|
| 1 | Linear grading (209E60500) | MI | 8.30 | $1,500.00 | $2,000.00 |
| 2 | Grading mailbox approaches (209E80000) | EACH | 17 | $20.00 | $100.00 |
| 3 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 1 | $1,600.00 | $2,000.00 |
| 4 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 1 | $2,000.00 | $3,000.00 |
| 5 | Post construction survey monument verification and report (623E51000) | LS | 1 | $3,000.00 | $2,000.00 |
| 6 | Special - mailbox support system, single (690E50100) | EACH | 3 | $250.00 | $350.00 |
| 7 | Special - mailbox support system, double (690E50200) | EACH | 1 | $350.00 | $500.00 |
| 8 | Erosion control (832E30000) | EACH | 1,500 | $1.00 | $1.00 |
| 9 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 279 | $300.00 | $325.00 |
| 10 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 49 | $350.00 | $500.00 |
| 11 | Pavement repair (253E02000) | CY | 28 | $320.00 | $400.00 |
| 12 | Pavement repair (253E02000) | CY | 5 | $370.00 | $800.00 |
| 13 | Pavement planing, asphalt concrete (1.25") (254E01000) | SY | 1,427 | $5.00 | $9.08 |
| 14 | Patching planed surface (254E01600) | SY | 71 | $1.25 | $1.00 |
| 15 | Tack coat (407E10000) | GAL | 6,070 | $2.90 | $2.25 |
| 16 | Prime coat, as per plan (408E10001) | GAL | 3,887 | $5.00 | $5.00 |
| 17 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 2,597 | $245.00 | $245.00 |
| 18 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 50 | $425.00 | $450.00 |
| 19 | Compacted aggregate (617E10100) | CY | 359 | $30.00 | $100.00 |
| 20 | Shoulder preparation (617E20000) | SY | 9,719 | $0.10 | $1.00 |
| 21 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 3.77 | $1,815.00 | $3,354.51 |
| 22 | Longitudinal joint preparation (874E21000) | MI | 3.77 | $4,500.00 | $2,500.00 |
| 23 | Pavement planing, asphalt concrete, class A (1.25" (897E01010) | SY | 74,461 | $0.70 | $1.20 |
| 24 | Patching planed surface (897E02000) | SY | 372 | $1.25 | $1.00 |
| 25 | RPM (621E00100) | EACH | 341 | $36.95 | $58.80 |
| 26 | Raised pavement marker removed (621E54000) | EACH | 341 | $3.00 | $15.00 |
| 27 | Edge line, 6", type 1 (642E00104) | MI | 8.18 | $700.00 | $700.00 |
| 28 | Center line, type 1 (642E00300) | MI | 4.09 | $900.00 | $900.00 |
| 29 | Stop line (644E00500) | FT | 232 | $4.50 | $4.50 |
| 30 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $100.00 | $100.00 |
| 31 | Work zone marking sign (614E12460) | EACH | 57 | $60.00 | $60.00 |
| 32 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $100.00 | $100.00 |
| 33 | Work zone center line, class III, 642 paint (614E21550) | MI | 8.18 | $985.00 | $985.00 |
| 34 | Work zone stop line, class III, 642 paint (614E26610) | FT | 132 | $1.00 | $4.50 |
| 35 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,000.00 | $5,000.00 |
| 36 | Maintaining traffic (614E11000) | LS | 1 | $77,110 | $45,000 |
| 37 | Field office, type B (619E16010) | MNTH | 4 | $3,200.00 | $3,000.00 |
| 38 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,000.00 | $2,000.00 |
| 39 | Mobilization (624E10000) | LS | 1 | $50,000 | $67,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 17, 2025. Compiled by Mirage Metrics.