ODOT contract 250519 bid tabulation
D07-CHIP-FY26 (A) (CHIP SEAL). Let by Ohio DOT on November 13, 2025, District 7. 2 bids received; low bid $1,920,421 by Ward Construction Co, -2.8% against the engineer's estimate of $1,975,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 34
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ward Construction Co | $1,920,421 | Low | -3.0% |
| 2 | Shelly Company | $2,059,505 | +7.0% | +4.0% |
Engineer's estimate: $1,975,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ward Construction Co | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 1,750 | $62.00 | $85.00 |
| 2 | Aggregate, single chip seal, type A (422E11000) | SY | 436,697 | $0.87 | $1.12 |
| 3 | Emulsion, chip seal (422E25000) | GAL | 174,677 | $3.70 | $3.00 |
| 4 | Fog seal (886E11000) | GAL | 16,315 | $3.80 | $3.60 |
| 5 | RPM (621E00100) | EACH | 2,129 | $49.75 | $36.00 |
| 6 | Raised pavement marker removed (621E54000) | EACH | 2,129 | $15.25 | $22.75 |
| 7 | Edge line, 6", type 1 (642E00104) | MI | 112.72 | $730.00 | $778.00 |
| 8 | Center line, type 1 (642E00300) | MI | 56.36 | $1,060.00 | $825.00 |
| 9 | Channelizing line, 8", type 1 (642E00400) | FT | 1,000 | $1.25 | $1.65 |
| 10 | Stop line, type 1 (642E00500) | FT | 364 | $5.80 | $5.50 |
| 11 | Crosswalk line, 12", type 1 (642E00620) | FT | 730 | $3.40 | $2.55 |
| 12 | Railroad symbol marking, type 1 (642E01000) | EACH | 8 | $275.00 | $450.00 |
| 13 | Parking lot stall marking, type 1 (642E01200) | FT | 962 | $0.25 | $1.25 |
| 14 | Handicap symbol marking, type 1 (642E01702) | EACH | 4 | $50.00 | $85.00 |
| 15 | Removal of pavement marking (642E30000) | FT | 500 | $0.27 | $1.00 |
| 16 | Removal of pavement marking (642E30000) | FT | 365 | $0.30 | $2.00 |
| 17 | Removal of pavement marking (642E30000) | FT | 481 | $0.25 | $2.00 |
| 18 | Removal of pavement marking (642E30000) | FT | 182 | $3.00 | $3.50 |
| 19 | Removal of pavement marking (642E30020) | EACH | 2 | $75.00 | $80.00 |
| 20 | Removal of pavement marking (642E30020) | EACH | 4 | $150.00 | $200.00 |
| 21 | Removal of pavement marking (642E30030) | MI | 28.18 | $1,015.00 | $933.00 |
| 22 | Removal of pavement marking (642E30030) | MI | 56.36 | $995.00 | $933.00 |
| 23 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $100.00 | $100.00 |
| 24 | Work zone center line, class I, 642 paint (614E21100) | MI | 64.29 | $805.00 | $885.00 |
| 25 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 128.58 | $805.00 | $660.00 |
| 26 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 1,500 | $0.40 | $1.00 |
| 27 | Work zone stop line, class I, 642 paint (614E26200) | FT | 445 | $5.00 | $4.00 |
| 28 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 1,095 | $5.00 | $2.50 |
| 29 | Work zone railroad symbol marking, class I, 642 paint (614E32200) | EACH | 8 | $200.00 | $375.00 |
| 30 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $8,000.00 | $8,500.00 |
| 31 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,000 | $5,500.00 |
| 32 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $235,000 |
| 33 | Mobilization (624E10000) | LS | 1 | $39,000 | $55,000 |
| 100 | Work zone marking sign (614E12460) | EACH | 246 | $82.50 | $120.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.