ODOT contract 250568 bid tabulation
PIC-SR-SR 188-02.56 (TWO LANE RESURFACING). Let by Ohio DOT on December 4, 2025, PIC. 2 bids received; low bid $1,390,293 by Kokosing Construction Company Inc, -16% against the engineer's estimate of $1,646,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 57
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $1,390,293 | Low | -16% |
| 2 | Shelly Company | $1,549,960 | +11% | -6.0% |
Engineer's estimate: $1,646,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Guardrail removed, as per plan (202E38001) | FT | 2,537.50 | $2.16 | $2.00 |
| 2 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 20 | $242.74 | $350.00 |
| 3 | Bridge terminal assembly removed, as per plan (202E47001) | EACH | 4 | $161.83 | $125.00 |
| 4 | Special - parking block removed (202E52990) | EACH | 4 | $190.00 | $110.00 |
| 5 | Special - parking block removed and reset (202E53010) | EACH | 82 | $80.00 | $65.00 |
| 6 | Mailbox removed, as per plan (202E53101) | EACH | 1 | $50.00 | $150.00 |
| 7 | Removal misc.: iron fence (202E98200) | FT | 260 | $1.50 | $0.50 |
| 8 | Embankment, as per plan (203E20001) | CY | 383 | $68.00 | $45.00 |
| 9 | Linear grading (209E60200) | STA | 40.96 | $95.00 | $45.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 193.75 | $21.53 | $20.75 |
| 11 | Guardrail, type MGS with long posts (606E15100) | FT | 2,563 | $22.87 | $24.75 |
| 12 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,546.06 | $2,500.00 |
| 13 | Anchor assembly, MGS type E (606E26150) | EACH | 21 | $2,384.24 | $2,500.00 |
| 14 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,068.05 | $1,200.00 |
| 15 | Bridge terminal assembly, type 4, as per plan (606E35141) | EACH | 4 | $992.53 | $1,500.00 |
| 16 | Guardrail, misc.: alternative guardrail placement (606E98000) | FT | 50 | $32.37 | $12.00 |
| 17 | Monument assembly adjusted to grade (623E39500) | EACH | 3 | $1,000.00 | $1,000.00 |
| 18 | Tied concrete block mat with type 1 underlayment, as per plan (601E21051) | SY | 111 | $100.00 | $73.00 |
| 19 | Topsoil (659E00300) | CY | 253 | $30.00 | $55.00 |
| 20 | Seeding and mulching (659E10000) | SY | 2,276 | $1.50 | $2.50 |
| 21 | Repair seeding and mulching (659E14000) | SY | 113 | $1.50 | $0.80 |
| 22 | Inter-seeding (659E15000) | SY | 113 | $1.50 | $0.80 |
| 23 | Commercial fertilizer (659E20000) | TON | 0.41 | $1,250.00 | $697.37 |
| 24 | Lime (659E31000) | ACRE | 0.54 | $150.00 | $137.26 |
| 25 | Water (659E35000) | MGAL | 12 | $1.00 | $1.00 |
| 26 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 27 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 141 | $37.00 | $68.25 |
| 28 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 3,866 | $50.00 | $54.25 |
| 29 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 59 | $1.70 | $3.00 |
| 30 | Pavement planing, asphalt concrete, as per plan, 1 (254E01001) | SY | 77,653 | $1.70 | $2.55 |
| 31 | Non-tracking tack coat (407E20000) | GAL | 6,607 | $2.65 | $4.10 |
| 32 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 3,180 | $192.00 | $181.00 |
| 33 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 58 | $480.00 | $458.00 |
| 34 | Compacted aggregate (617E10100) | CY | 383 | $35.00 | $87.00 |
| 35 | Shoulder preparation (617E20000) | SY | 6,370 | $0.30 | $2.30 |
| 36 | Water (617E25000) | MGAL | 4 | $5.00 | $1.00 |
| 37 | Fog seal (886E11000) | GAL | 3,616 | $4.00 | $4.65 |
| 38 | RPM (621E00100) | EACH | 410 | $38.00 | $38.00 |
| 39 | Raised pavement marker removed (621E54000) | EACH | 410 | $1.00 | $4.35 |
| 40 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 50 | $11.87 | $12.00 |
| 41 | Edge line, 6", type 1 (642E00104) | MI | 10.75 | $825.00 | $825.00 |
| 42 | Center line, type 1 (642E00300) | MI | 5.28 | $1,130.00 | $1,130.00 |
| 43 | Stop line, type 1 (642E00500) | FT | 35 | $8.00 | $8.00 |
| 44 | Parking lot stall marking, type 1 (642E01200) | FT | 6,141 | $0.90 | $0.90 |
| 45 | Lane arrow, type 1 (642E01300) | EACH | 12 | $95.00 | $95.00 |
| 46 | Handicap symbol marking, type 1 (642E01702) | EACH | 9 | $95.00 | $95.00 |
| 47 | Pavement marking, misc.: campground site numbers (642E50010) | EACH | 60 | $70.00 | $70.00 |
| 48 | Stop line (644E00500) | FT | 15 | $15.00 | $15.00 |
| 49 | Work zone marking sign (614E12460) | EACH | 32 | $125.00 | $125.00 |
| 50 | Work zone center line, class III, 642 paint (614E21550) | MI | 5.28 | $950.00 | $965.00 |
| 51 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 10.75 | $675.00 | $1,135.00 |
| 52 | Special - sawing and sealing bituminous concrete joints (516E31200) | FT | 36 | $120.00 | $50.00 |
| 53 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,600.00 | $5,500.00 |
| 54 | Maintaining traffic (614E11000) | LS | 1 | $30,630 | $103,250 |
| 55 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $1,500.00 | $2,500.00 |
| 56 | Mobilization (624E10000) | LS | 1 | $69,000 | $40,000 |
| 100 | Partial depth repair, misc.:campground pavement RE (251E98000) | CY | 4 | $500.00 | $3,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.