ODOT contract 250586 bid tabulation

DEL-SR 229-00.12 (TWO LANE RESURFACING). Let by Ohio DOT on December 18, 2025, DEL. 3 bids received; low bid $1,686,864 by Shelly & Sands Inc, -12% against the engineer's estimate of $1,914,000.

Owner
Ohio DOT
Letting
18 DEC 2025
Pay items
72
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly & Sands Inc$1,686,864Low-12%
2Kokosing Construction Company Inc$1,789,621+6.0%-6.0%
3Shelly Company$1,896,968+12%-1.0%
ODOT contract 250586: bids by rank

Engineer's estimate: $1,914,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc2. Kokosing Construction Company Inc3. Shelly Company
1Pavement removed (202E23000)SY37$45.00$57.00$87.45
2Walk removed, as per plan (202E30001)SF1,172$9.00$4.75$8.00
3Curb removed (202E32000)FT148$35.00$26.00$24.15
4Guardrail removed, as per plan (202E38001)FT6,221.88$2.00$2.00$2.00
5Guardrail removed for reuse, as per plan (202E38201)FT350$2.50$2.50$2.50
6Anchor assembly removed, type A, as per plan (202E42001)EACH10$350.00$350.00$350.00
7Anchor assembly removed, type E, as per plan (202E42011)EACH1$128.60$128.60$128.60
8Removal misc.: stone walk (202E98400)SF113$7.50$10.25$10.05
9Embankment, as per plan (203E20001)CY1,228$40.00$30.00$40.00
10Linear grading (209E60200)STA74.20$45.00$60.00$45.00
11Guardrail, type MGS (606E15050)FT112.50$24.50$24.50$24.50
12Guardrail, type MGS with long posts (606E15100)FT6,131.25$24.75$24.75$24.75
13Anchor assembly, MGS type A (606E25550)EACH1$1,850.00$1,850.00$1,850.00
14Anchor assembly, MGS type E (606E26150)EACH8$2,500.00$2,500.00$2,500.00
15Anchor assembly, MGS type T (606E26550)EACH8$1,150.00$1,150.00$1,150.00
16Bridge terminal assembly, type 4, as per plan (606E35141)EACH4$1,350.00$1,350.00$1,350.00
17Guardrail, misc.: alternative guardrail placement (606E98000)FT50$12.00$12.00$12.00
184" concrete walk, as per plan (608E10001)SF603$11.00$14.00$15.55
19Curb ramp (608E52000)SF1,192$35.00$23.00$31.15
20Detectable warning (608E53020)SF20$45.00$35.75$69.00
21Walkway, misc.: brick paver, remove and reset (608E98000)SF26$65.00$28.00$50.00
22Topsoil (659E00300)CY411$50.00$35.00$51.78
23Seeding and mulching (659E10000)SY3,733$1.60$1.15$1.59
24Repair seeding and mulching (659E14000)SY187$0.80$1.15$0.80
25Inter-seeding (659E15000)SY187$0.80$1.15$0.80
26Commercial fertilizer (659E20000)TON0.53$884.00$1,250.00$884.74
27Lime (659E31000)ACRE0.52$160.00$150.00$160.54
28Water (659E35000)MGAL22$1.00$1.00$1.00
29Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
30Catch basin adjusted to grade (611E98630)EACH4$800.00$900.00$1,025.00
31Manhole adjusted to grade (611E99654)EACH4$950.00$750.00$1,025.00
32Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY172$30.00$40.00$72.25
33Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY2,492$45.00$40.00$42.50
34Pavement repair, as per plan (253E01001)SY80$290.00$260.00$252.75
35Pavement planing, asphalt concrete, 1.5" (254E01000)SY94,648$1.25$1.40$2.10
36Aggregate base (304E20000)CY8$80.00$144.00$259.85
37Non-tracking tack coat (407E20000)GAL8,048$3.50$2.65$4.10
38Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000)CY3,897$180.00$204.00$192.25
39Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY45$400.00$500.00$435.00
40Combination curb and gutter, type 2 (609E12000)FT13$220.00$138.00$81.75
41Curb, type 6 (609E26000)FT104$75.00$44.00$48.60
424" concrete median (609E70000)SY27$220.00$108.00$105.50
43Compacted aggregate (617E10100)CY420$80.00$75.00$88.75
44Shoulder preparation (617E20000)SY7,198$1.00$0.30$2.35
45Water (617E25000)MGAL2$1.00$7.00$1.00
46Rumble stripes, center line (asphalt concrete) (618E43000)MI5.73$1,195.00$1,195.00$1,405.00
47Longitudinal joint preparation (874E21000)MI6.01$1,000.00$2,000.00$2,210.00
48Valve box adjusted to grade (638E10800)EACH4$800.00$650.00$415.00
49Delineator, post surface mounted (620E60000)EACH6$150.00$89.78$150.00
50RPM (621E00100)EACH457$37.50$37.05$41.00
51Raised pavement marker removed (621E54000)EACH457$8.00$2.00$4.25
52Barrier reflector, type 2, bidirectional (626E00110)EACH93$12.00$12.00$12.00
53Ground mounted support, no. 2 post (630E02100)FT154$10.00$18.00$14.00
54Sign, flat sheet (630E80100)SF92.80$20.00$20.00$24.00
55Removal of ground mounted sign and disposal (630E84900)EACH4$50.00$35.00$20.00
56Signing, misc.: solar-powered rectangular rapid FL (630E97700)EACH4$8,500.00$8,000.00$8,500.00
57Edge line, 4", type 1 (642E00100)MI12.25$633.00$633.00$625.00
58Center line, type 1 (642E00300)MI6.13$980.00$980.00$850.00
59Removal of pavement marking (642E30000)FT150$10.00$10.00$12.00
60Stop line (644E00500)FT85$9.50$9.50$10.00
61Crosswalk line, 12" (644E00620)FT113$4.85$4.85$5.00
62Crosswalk line, 24" (644E00630)FT110$9.50$9.50$12.00
63Yield line (644E20800)FT44$15.00$15.00$15.00
64Law enforcement officer with patrol car for assistance (614E11110)HR16$95.00$125.00$85.00
65Work zone marking sign, as per plan (614E12461)EACH28$85.00$125.00$85.00
66Work zone center line, class III, 642 paint (614E21550)MI12.26$785.00$975.32$975.00
67Work zone edge line, class III, 6", 642 paint (614E22360)MI12.26$610.00$500.00$500.00
68Premium for contract performance bond and for payment bond (103E05000)LS1$6,184.73$7,500.00$5,000.00
69Maintaining traffic (614E11000)LS1$63,600$94,587$120,000
70Construction layout stakes and surveying, as per plan (623E10001)LS1$3,926.00$1,500.00$2,500.00
71Mobilization (624E10000)LS1$60,000$89,000$69,000
100Guardrail rebuilt, type MGS with long posts, as per plan (606E16561)FT350$21.00$21.00$21.00
ODOT contract 250586: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy