| 1 | Clearing and grubbing (201E11000) | LS | 1 | $500.00 | $4,000.00 |
| 2 | Guardrail removed, as per plan (202E38001) | FT | 1,555 | $2.00 | $2.00 |
| 3 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 15 | $340.00 | $300.00 |
| 4 | Anchor assembly removed, type T, as per plan (202E42041) | EACH | 2 | $80.00 | $120.00 |
| 5 | Embankment, as per plan (203E20001) | CY | 344 | $81.50 | $35.00 |
| 6 | Linear grading (209E60200) | STA | 115 | $90.00 | $60.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 1,326 | $21.00 | $20.50 |
| 8 | Anchor assembly, MGS type A (606E25550) | EACH | 2 | $1,630.00 | $1,700.00 |
| 9 | Anchor assembly, MGS type E (606E26150) | EACH | 11 | $2,680.00 | $2,500.00 |
| 10 | Anchor assembly, MGS type T (606E26550) | EACH | 7 | $1,375.00 | $1,200.00 |
| 11 | Bridge terminal assembly, type 4, as per plan (606E35141) | EACH | 4 | $1,445.00 | $1,500.00 |
| 12 | Guardrail, misc.: alternative guardrail placement (606E98000) | FT | 200 | $14.00 | $20.00 |
| 13 | Monument assembly, type D, as per plan (623E38551) | EACH | 2 | $500.00 | $2,500.00 |
| 14 | Topsoil (659E00300) | CY | 220 | $75.00 | $54.00 |
| 15 | Seeding and mulching (659E10000) | SY | 2,068 | $2.95 | $2.70 |
| 16 | Repair seeding and mulching (659E14000) | SY | 104 | $0.90 | $0.80 |
| 17 | Inter-seeding (659E15000) | SY | 104 | $0.10 | $0.80 |
| 18 | Commercial fertilizer (659E20000) | TON | 0.28 | $615.00 | $885.00 |
| 19 | Lime (659E31000) | ACRE | 0.43 | $40.00 | $161.00 |
| 20 | Water (659E35000) | MGAL | 11 | $25.00 | $1.00 |
| 21 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 22 | 6" conduit, type C (611E01100) | FT | 10 | $125.00 | $120.00 |
| 23 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 4,725 | $33.00 | $33.00 |
| 24 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 2,386 | $35.00 | $50.00 |
| 25 | Pavement repair, as per plan (253E02001) | CY | 97 | $800.00 | $400.00 |
| 26 | Pavement planing, asphalt concrete, as per plan, 1 (254E01001) | SY | 60,444 | $0.70 | $1.00 |
| 27 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2 | $600.00 | $1,800.00 |
| 28 | Non-tracking tack coat (407E20000) | GAL | 5,137 | $2.60 | $3.25 |
| 29 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 56 | $29.00 | $48.00 |
| 30 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 2,501 | $177.00 | $185.00 |
| 31 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 22 | $350.00 | $750.00 |
| 32 | Aggregate drains (605E31100) | FT | 361 | $3.00 | $35.00 |
| 33 | Compacted aggregate, as per plan (617E10101) | CY | 340 | $50.00 | $65.00 |
| 34 | Shoulder preparation (617E20000) | SY | 4,817 | $0.10 | $4.00 |
| 35 | Water (617E25000) | MGAL | 2 | $25.00 | $100.00 |
| 36 | RPM (621E00100) | EACH | 199 | $53.00 | $48.00 |
| 37 | Raised pavement marker removed (621E54000) | EACH | 199 | $3.00 | $15.00 |
| 38 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 58 | $13.50 | $12.00 |
| 39 | Edge line, 6" (644E00104) | MI | 8.12 | $3,450.00 | $3,450.00 |
| 40 | Center line (644E00300) | MI | 4.01 | $4,150.00 | $4,150.00 |
| 41 | Stop line (644E00500) | FT | 10 | $12.50 | $12.50 |
| 42 | Transverse/diagonal line (644E00700) | FT | 957 | $8.40 | $8.40 |
| 43 | Dotted line, 12" (644E01520) | FT | 40 | $3.50 | $3.50 |
| 44 | Yield line (644E20800) | FT | 44 | $12.50 | $12.50 |
| 45 | Removal of pavement marking (644E30000) | FT | 893 | $1.50 | $1.50 |
| 46 | Removal of pavement marking (644E30020) | EACH | 1 | $120.00 | $120.00 |
| 47 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 60 | $80.00 | $90.00 |
| 48 | Detour signing, as per plan (614E12421) | LS | 1 | $8,803.60 | $5,500.00 |
| 49 | Work zone marking sign (614E12460) | EACH | 26 | $153.24 | $70.00 |
| 50 | Asphalt concrete for maintaining traffic (614E13000) | CY | 80 | $125.00 | $300.00 |
| 51 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $967.50 | $1,000.00 |
| 52 | Work zone center line, class III, 642 paint (614E21550) | MI | 4.03 | $945.00 | $945.00 |
| 53 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 8.06 | $690.00 | $690.00 |
| 54 | Water (616E10000) | MGAL | 2 | $25.00 | $100.00 |
| 55 | Center line, type 1 (642E00300) | MI | 0.20 | $1,000.00 | $2,000.00 |
| 56 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $7,500.00 |
| 57 | Maintaining traffic (614E11000) | LS | 1 | $55,100 | $129,730 |
| 58 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $1,210.00 | $5,000.00 |
| 59 | Mobilization (624E10000) | LS | 1 | $60,000 | $40,000 |