ODOT contract 258020 bid tabulation
LOR-US 6-09.67 Span Locks (BRIDGE REPAIR). Let by Ohio DOT on July 31, 2025, LOR. 1 bid received; low bid $388,774 by Ruhlin Company, +69% against the engineer's estimate of $230,000.
- Owner
- Ohio DOT
- Letting
- 31 JUL 2025
- Pay items
- 14
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ruhlin Company | $388,774 | Low | +69% |
Engineer's estimate: $230,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ruhlin Company |
|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 1,000 | $1.00 |
| 2 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $11,629 |
| 3 | Special - structures bridge operational programmin (530E00200) | LS | 1 | $25,000 |
| 4 | Special - structures bridge personnel training (530E00200) | LS | 1 | $11,108 |
| 5 | Special - structures lock bar interference investi (530E00200) | LS | 1 | $23,670 |
| 6 | Special - structures lock bar interference remedia (530E00200) | LS | 1 | $126,339 |
| 7 | Special - structures operating manual updates (530E00200) | LS | 1 | $11,154 |
| 8 | Special - structures refurbish span lock actuator (530E00400) | EACH | 40,000 | $1.00 |
| 9 | Special - structures replace span lock actuator as (530E00400) | EACH | 2 | $63,030 |
| 10 | Special - structures span lock damage evaluation (530E00400) | EACH | 2 | $1,107.49 |
| 11 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,827.23 |
| 12 | Maintaining traffic (614E11000) | LS | 1 | $6,970.00 |
| 13 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1,596.10 |
| 14 | Mobilization (624E10000) | LS | 1 | $205.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 31, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.