ODOT contract 260135 bid tabulation
SHE-PAVE-FY26 (TWO LANE RESURFACING). Let by Ohio DOT on March 12, 2026, SHE. 2 bids received; low bid $4,995,500 by Barrett Paving Materials Inc, -12% against the engineer's estimate of $5,704,000.
- Owner
- Ohio DOT
- Letting
- 12 MAR 2026
- Pay items
- 50
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $4,995,500 | Low | -12% |
| 2 | Shelly Company | $6,086,254 | +22% | +7.0% |
Engineer's estimate: $5,704,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 1,043 | $10.00 | $6.00 |
| 2 | Curb and gutter removed (202E32500) | FT | 136 | $20.00 | $16.00 |
| 3 | 4" concrete walk (608E10000) | SF | 448 | $20.00 | $25.00 |
| 4 | Curb ramp (608E52000) | SF | 889 | $20.00 | $25.00 |
| 5 | Detectable warning (608E53020) | SF | 225 | $60.00 | $42.00 |
| 6 | Monument assembly adjusted to grade (623E39500) | EACH | 8 | $800.00 | $200.00 |
| 7 | Special - mailbox removed and reset (690E50350) | EACH | 7 | $280.00 | $350.00 |
| 8 | Special - asphalt pavement interlayer matting (690E98300) | SY | 11,399 | $4.09 | $4.09 |
| 9 | Topsoil (659E00300) | CY | 1 | $250.00 | $250.00 |
| 10 | Seeding and mulching, class 1 (659E00500) | SY | 40 | $10.00 | $10.00 |
| 11 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 12 | Manhole adjusted to grade (611E99654) | EACH | 13 | $800.00 | $1,200.00 |
| 13 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 4,127 | $60.00 | $60.00 |
| 14 | Pavement repair, as per plan (253E01001) | SY | 111 | $82.00 | $130.00 |
| 15 | Pavement planing, asphalt concrete, 1 1/2" depth (254E01000) | SY | 364,180 | $1.90 | $2.25 |
| 16 | Patching planed surface, as per plan (254E01601) | SY | 375 | $10.00 | $25.00 |
| 17 | Asphalt concrete base, (449), as per plan, PG 64-2 (301E56001) | CY | 14 | $650.00 | $350.00 |
| 18 | Non-tracking tack coat (407E20000) | GAL | 30,989 | $2.00 | $3.00 |
| 19 | Non-tracking tack coat (407E20000) | GAL | 2,967 | $2.00 | $3.00 |
| 20 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 15,214 | $210.00 | $250.00 |
| 21 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 3 | $60.00 | $125.00 |
| 22 | Compacted aggregate (617E10100) | CY | 1,273 | $100.00 | $110.00 |
| 23 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 22.84 | $800.00 | $1,160.00 |
| 24 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 11.42 | $1,600.00 | $1,200.00 |
| 25 | Longitudinal joint preparation (874E21000) | MI | 11.42 | $4,500.00 | $6,000.00 |
| 26 | Valve box adjusted to grade (638E10800) | EACH | 41 | $300.00 | $775.00 |
| 27 | RPM (621E00100) | EACH | 1,351 | $34.50 | $34.50 |
| 28 | Raised pavement marker removed (621E54000) | EACH | 1,351 | $6.00 | $7.00 |
| 29 | Edge line, 6", type 1 (642E00104) | MI | 38.25 | $894.00 | $800.00 |
| 30 | Center line, type 1 (642E00300) | MI | 20.72 | $777.00 | $900.00 |
| 31 | Stop line (644E00500) | FT | 234 | $7.00 | $5.00 |
| 32 | Crosswalk line, 12" (644E00620) | FT | 970 | $3.50 | $6.00 |
| 33 | Crosswalk line, 24" (644E00630) | FT | 72 | $7.00 | $9.00 |
| 34 | School symbol marking, 96" (644E01110) | EACH | 3 | $550.00 | $500.00 |
| 35 | Parking lot stall marking (644E01200) | FT | 128 | $5.00 | $1.20 |
| 36 | Lane arrow (644E01300) | EACH | 1 | $275.00 | $120.00 |
| 37 | Lane arrow (644E01300) | EACH | 2 | $147.00 | $120.00 |
| 38 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $80.00 | $120.00 |
| 39 | Work zone marking sign (614E12460) | EACH | 96 | $110.00 | $101.51 |
| 40 | Work zone center line, class I, 642 paint (614E21100) | MI | 41.44 | $1,729.00 | $950.00 |
| 41 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 76.50 | $1,100.00 | $695.00 |
| 42 | Work zone stop line, class III, 642 paint (614E26610) | FT | 468 | $3.00 | $5.00 |
| 43 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 1,940 | $1.50 | $4.00 |
| 44 | Work zone crosswalk line, class III, 24", 642 paint (614E27260) | FT | 144 | $3.00 | $5.00 |
| 45 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 2 | $77.00 | $60.00 |
| 46 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 4 | $50.00 | $60.00 |
| 47 | Work zone school symbol marking, 96", class III, 6 (614E31750) | EACH | 6 | $223.00 | $300.00 |
| 48 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,594 | $50,000 |
| 49 | Maintaining traffic (614E11000) | LS | 1 | $65,000 | $200,000 |
| 50 | Mobilization (624E10000) | LS | 1 | $55,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 12, 2026. Compiled by Mirage Metrics.