| 1 | Special - parking block removed and reset (202E53010) | EACH | 310 | $75.00 |
| 2 | Excavation (203E10000) | CY | 268 | $100.00 |
| 3 | Embankment (203E20000) | CY | 31 | $150.00 |
| 4 | Subgrade compaction (204E10000) | SY | 778 | $5.00 |
| 5 | Ditch cleanout (209E10000) | FT | 635 | $15.00 |
| 6 | Linear grading (209E60500) | MI | 1.49 | $2,450.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 100 | $38.40 |
| 8 | Guardrail rebuilt (606E16000) | FT | 50 | $29.20 |
| 9 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $3,475.00 |
| 10 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,780.00 |
| 11 | Seeding and mulching, as per plan (659E10001) | SY | 93 | $8.00 |
| 12 | Erosion control (832E30000) | EACH | 1,000 | $1.00 |
| 13 | Aggregate drains (605E31100) | FT | 24 | $25.00 |
| 14 | Catch basin adjusted to grade (611E98630) | EACH | 8 | $2,150.00 |
| 15 | Manhole adjusted to grade (611E99654) | EACH | 2 | $2,000.00 |
| 16 | Partial depth pavement repair (441) (251E01010) | CY | 685 | $450.00 |
| 17 | Full depth pavement sawing (252E01500) | FT | 510 | $6.50 |
| 18 | Pavement planing, asphalt concrete, 1.50" (254E01000) | SY | 31,543 | $5.50 |
| 19 | Pavement planing, asphalt concrete, as per plan, 1 (254E01001) | SY | 10,095 | $3.50 |
| 20 | Pavement planing, asphalt concrete, as per plan, 3 (254E01001) | SY | 8,502 | $7.50 |
| 21 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 67 | $250.00 |
| 22 | Aggregate base (304E20000) | CY | 191 | $150.00 |
| 23 | Non-tracking tack coat (407E20000) | GAL | 15,369 | $3.50 |
| 24 | Prime coat (408E10000) | GAL | 700 | $5.00 |
| 25 | Crack sealing, type II (423E00104) | LB | 6,000 | $3.20 |
| 26 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 2,481 | $240.00 |
| 27 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 4,434 | $260.00 |
| 28 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 415 | $200.00 |
| 29 | 8" reinforced concrete pavement, class QC 1P (451E13010) | SY | 380 | $145.00 |
| 30 | Compacted aggregate (617E10100) | CY | 74 | $200.00 |
| 31 | Pavement planing, asphalt concrete, class A, 1.25" (897E01010) | SY | 108,868 | $2.15 |
| 32 | RPM (621E00100) | EACH | 936 | $40.50 |
| 33 | Raised pavement marker removed (621E54000) | EACH | 936 | $9.00 |
| 34 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 10 | $12.00 |
| 35 | Ground mounted support, no. 2 post (630E02100) | FT | 110 | $27.00 |
| 36 | Sign post reflector (630E08600) | EACH | 10 | $45.00 |
| 37 | Sign, flat sheet (630E80100) | SF | 30 | $32.00 |
| 38 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $25.00 |
| 39 | Edge line, 6", type 1 (642E00104) | MI | 13.66 | $895.00 |
| 40 | Center line, type 1 (642E00300) | MI | 8 | $1,250.00 |
| 41 | Channelizing line, 8" (644E00400) | FT | 215 | $3.00 |
| 42 | Stop line (644E00500) | FT | 479 | $8.65 |
| 43 | Crosswalk line, 24" (644E00630) | FT | 36 | $8.50 |
| 44 | Transverse/diagonal line (644E00700) | FT | 280 | $8.80 |
| 45 | Island marking (644E00900) | SF | 120 | $2.80 |
| 46 | Railroad symbol marking (644E01000) | EACH | 2 | $830.00 |
| 47 | School symbol marking, 96" (644E01110) | EACH | 4 | $830.00 |
| 48 | Parking lot stall marking (644E01200) | FT | 18,203 | $1.80 |
| 49 | Lane arrow (644E01300) | EACH | 33 | $100.00 |
| 50 | Handicap symbol marking (644E01600) | EACH | 28 | $110.00 |
| 51 | Bike crossing symbol (644E01620) | EACH | 2 | $500.00 |
| 52 | Work zone marking sign (614E12460) | EACH | 62 | $88.00 |
| 53 | Work zone center line, class I, 642 paint (614E21100) | MI | 15.83 | $1,210.00 |
| 54 | Work zone center line, class II (614E21400) | MI | 15.83 | $200.00 |
| 55 | Work zone stop line, class I (614E26000) | FT | 41 | $12.00 |
| 56 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $1,550.00 |
| 57 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,489.00 |
| 58 | Maintaining traffic (614E11000) | LS | 1 | $245,000 |
| 59 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,500 |
| 60 | Mobilization (624E10000) | LS | 1 | $85,000 |