ODOT contract 15601 bid tabulation
I-5: monument dr - n. grants pass. Let by Oregon DOT on May 22, 2025, Region 3. 3 bids received.
- Owner
- Oregon DOT
- Letting
- 22 MAY 2025
- Pay items
- 132
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 |
|---|---|---|---|---|---|---|
| 1 | Thermoplastic, extruded, surface, non-profiled (0865-0116610F) | LF | 2,270 | $3.25 | $3.25 | $3.25 |
| 2 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 32 | $31.50 | $31.50 | $31.50 |
| 3 | Type 2 fence (1050-0104000F) | LF | 2,525 | $7.00 | $35.00 | $35.00 |
| 4 | Removal of fences (0310-0112000A) | LF | 2,525 | $2.65 | $2.99 | $2.97 |
| 5 | Temporary plastic drums (0224-0145000E) | EACH | 500 | $52.00 | $0.10 | $60.00 |
| 6 | Removal of barriers (0310-0108000A) | LF | 500 | $19.00 | $19.00 | $20.00 |
| 7 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 2 | $350.00 | $350.00 | $350.00 |
| 8 | Class 2 preparation (0504-0100000J) | SY | 6 | $250.00 | $251.00 | $255.00 |
| 9 | Hot applied joint sealant replacement (0585-0400000A) | LF | 84 | $30.00 | $16.07 | $16.96 |
| 10 | Construct mpco (0556-0500000J) | SY | 859 | $23.70 | $21.00 | $21.00 |
| 11 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 88 | $60.00 | $97.73 | $103.41 |
| 12 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $2,400.00 | $2,400.00 | $2,400.00 |
| 13 | Class 2 preparation (0504-0100000J) | SY | 10 | $250.00 | $204.00 | $205.00 |
| 14 | Furnish mpco material (0556-0300000J) | SY | 800 | $23.70 | $19.95 | $21.00 |
| 15 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 33 | $3,875.00 | $3,850.00 | $3,875.00 |
| 16 | Construct mpco (0556-0500000J) | SY | 859 | $23.70 | $21.00 | $22.50 |
| 17 | Drainage curbs (0480-0100000F) | LF | 2,065 | $13.50 | $17.45 | $17.50 |
| 18 | Inlet protection, type 7 (0280-0114070E) | EACH | 91 | $68.00 | $237.00 | $100.00 |
| 19 | Guardrail connections (0810-0128000E) | EACH | 4 | $300.00 | $300.00 | $300.00 |
| 20 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 17,300 | $8.50 | $2.35 | $6.50 |
| 21 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 88 | $60.00 | $97.73 | $103.41 |
| 22 | Construct mpco (0556-0500000J) | SY | 1,262 | $23.70 | $21.45 | $23.00 |
| 23 | Riprap basins (0390-0139000E) | EACH | 1 | $100.00 | $1,000.00 | $1,100.00 |
| 24 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $500.00 | $1,000.00 |
| 25 | Smart work zone system (0229-0167200U) | DAY | 90 | $500.00 | $254.00 | $1,000.00 |
| 26 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 35,060 | $25.00 | $25.00 | $25.00 |
| 27 | Automatic traffic recorder installation, I-5 milepoint 64.2 (0990-0107000A) | EACH | 1 | $34,500 | $34,400 | $33,312 |
| 28 | Pavement marking tape, grooved, patterned, wet weather (0865-0127100F) | LF | 227,300 | $5.72 | $5.70 | $5.72 |
| 29 | Extra for asphalt approaches (0749-0100000E) | EACH | 33 | $450.00 | $2,900.00 | $2,300.00 |
| 30 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 283 | $35.00 | $10.35 | $14.00 |
| 31 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 55 | $95.00 | $125.00 | $115.00 |
| 32 | Clearing and grubbing (0320-0100000A) | ACRE | 3.50 | $60,000 | $63,714 | $17,143 |
| 33 | Asphalt pavement sawcutting (0310-0119000F) | LF | 20,500 | $1.95 | $3.00 | $2.35 |
| 34 | Pilot cars (0223-0172000T) | HR | 120 | $82.00 | $120.00 | $105.00 |
| 35 | Portable changeable message signs, roller mounted (0222-0167300E) | EACH | 2 | $500.00 | $11,000 | $6,200.00 |
| 36 | Sign support footings (0920-0100000A) | CY | 16.50 | $4,654.55 | $4,654.55 | $4,654.55 |
| 37 | Delineators, type 1 (0840-0100000E) | EACH | 558 | $70.00 | $70.00 | $70.00 |
| 38 | Securing concrete barrier (0820-0400000F) | LF | 425 | $23.00 | $23.00 | $23.00 |
| 39 | Granular structure backfill (0510-0108000A) | CY | 4 | $425.00 | $1,375.00 | $875.00 |
| 40 | Bridge removal work (0501-0100000A) | SF | 84 | $2.98 | $0.01 | $5.95 |
| 41 | Cold plane pavement removal, 5 inches deep (0620-0124000J) | SY | 151,400 | $4.45 | $2.45 | $7.00 |
| 42 | Furnish mpco material (0556-0300000J) | SY | 859 | $23.70 | $20.25 | $21.50 |
| 43 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 919 | $51.14 | $64.53 | $75.08 |
| 44 | Concrete storm sewer manholes (0470-0101000E) | EACH | 2 | $6,000.00 | $6,400.00 | $8,500.00 |
| 45 | Extra for 8 foot posts (0810-0133000E) | EACH | 108 | $150.00 | $150.00 | $150.00 |
| 46 | Structure excavation (0510-0101000A) | CY | 59 | $101.69 | $254.24 | $81.36 |
| 47 | Furnish mpco material (0556-0300000J) | SY | 1,262 | $23.70 | $19.95 | $21.00 |
| 48 | Remove and reinstall cable barrier, test level 3 (0811-0101000F) | LF | 256 | $50.00 | $50.00 | $50.00 |
| 49 | Constructing elastomeric concrete nosing (0584-0104000J) | SF | 134 | $167.00 | $115.00 | $116.00 |
| 50 | Elastomeric concrete nosing material (0584-0103000C) | CF | 25.10 | $119.00 | $120.00 | $120.00 |
| 51 | Impact attenuator, type J (0830-0123000E) | EACH | 2 | $46,500 | $46,500 | $46,500 |
| 52 | Removal of guardrail (0310-0113000A) | LF | 33,600 | $2.86 | $2.85 | $2.98 |
| 53 | PG 70-22ER asphalt in level 4 1/2 inch ACP (0745-0640100M) | TON | 4,350 | $0.01 | $0.10 | $1.00 |
| 54 | Core correlation of nuclear gauge readings (0745-0900000E) | EACH | 2 | $1,200.00 | $1,600.00 | $3,000.00 |
| 55 | Bridge identification markers (0842-0401000E) | EACH | 8 | $225.00 | $225.00 | $225.00 |
| 56 | Continuous rumble strips (0857-0101000L) | MI | 13.80 | $2,250.00 | $2,250.00 | $2,250.00 |
| 57 | Gap pattern rumble strips (0857-0101500L) | MI | 15.20 | $2,250.00 | $2,250.00 | $2,250.00 |
| 58 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $9,000.00 | $20,900 | $60,000 |
| 59 | Bridge removal work (0501-0100000A) | SF | 84 | $2.98 | $0.01 | $5.95 |
| 60 | Portable changeable message signs (0222-0164000E) | EACH | 6 | $4,000.00 | $15,000 | $8,700.00 |
| 61 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 3 | $10,000 | $45,000 | $20,000 |
| 62 | Flaggers (0223-0168000T) | HR | 770 | $75.00 | $85.00 | $86.00 |
| 63 | Traffic control supervisor (0223-0169000E) | EACH | 225 | $1,350.00 | $1,400.00 | $1,100.00 |
| 64 | Stripe removal (0225-0154000F) | LF | 1,850 | $2.50 | $2.50 | $2.50 |
| 65 | Sequential arrow signs (0222-0162000E) | EACH | 3 | $6,800.00 | $4,500.00 | $3,500.00 |
| 66 | General excavation (0330-0105000K) | CY | 11,650 | $46.00 | $51.25 | $51.00 |
| 67 | Sloped end sections, 18 inch (0445-0700180E) | EACH | 1 | $180.00 | $595.00 | $250.00 |
| 68 | Furnish mpco material (0556-0300000J) | SY | 1,971 | $23.70 | $20.25 | $20.25 |
| 69 | Class 2 preparation (0504-0100000J) | SY | 4 | $250.00 | $328.00 | $330.00 |
| 70 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 20 | $16.75 | $16.75 | $16.75 |
| 71 | BI-directional blue type iar markers (0855-0108100E) | EACH | 24 | $25.00 | $25.00 | $25.00 |
| 72 | Remove existing signs (0905-0100000A) | LS | 1 | $7,820.00 | $7,800.00 | $7,820.00 |
| 73 | Class 2 preparation (0504-0100000J) | SY | 4 | $250.00 | $356.00 | $325.00 |
| 74 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 4 | $750.00 | $1,000.00 | $1,000.00 |
| 75 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $3,500.00 | $31,500 | $1,000.00 |
| 76 | Preparation of shoulders (0334-0100000L) | MI | 12 | $1.00 | $3,600.00 | $1,500.00 |
| 77 | Bridge removal work (0501-0100000A) | SF | 230 | $1.09 | $0.00 | $2.17 |
| 78 | Level 4, 1/2 inch lime treated ACP (0745-0422000M) | TON | 76,000 | $89.60 | $100.00 | $104.00 |
| 79 | Class 2 preparation (0504-0100000J) | SY | 4 | $250.00 | $324.00 | $360.00 |
| 80 | Guardrail terminals, downstream anchor terminal (0810-0132200E) | EACH | 26 | $1,685.00 | $1,700.00 | $1,685.00 |
| 81 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 307.30 | $49.00 | $49.00 | $49.00 |
| 82 | Refurbishing and reinstalling existing illumination systems (0970-0106000A) | LS | 1 | $22,300 | $22,900 | $2,850.00 |
| 83 | Multi-post breakaway sign supports (0930-0111000A) | LB | 3,234.50 | $10.20 | $10.20 | $10.20 |
| 84 | Construct mpco (0556-0500000J) | SY | 800 | $23.70 | $23.55 | $25.00 |
| 85 | Class 2 preparation (0504-0100000J) | SY | 6 | $250.00 | $252.00 | $255.00 |
| 86 | Radar speed trailer (0222-0167500E) | EACH | 2 | $10,000 | $10,000 | $14,000 |
| 87 | Compost erosion blanket (0280-0105100J) | SY | 15,730 | $5.80 | $5.80 | $5.80 |
| 88 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 192,100 | $2.30 | $1.35 | $4.50 |
| 89 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 2 | $1,250.00 | $2,050.00 | $2,000.00 |
| 90 | Stone embankment (0330-0126000K) | CY | 1,010 | $95.00 | $56.10 | $78.00 |
| 91 | Temporary signs (0222-0102000J) | SF | 1,570 | $31.00 | $36.00 | $35.00 |
| 92 | Switching, conduit, and wiring (0970-0105000A) | LF | 350 | $23.43 | $23.43 | $102.64 |
| 93 | Bar removal (0225-0156000J) | SF | 183 | $9.00 | $9.00 | $9.00 |
| 94 | Furnish smart work zone system (0229-0167200E) | EACH | 1 | $8,500.00 | $6,500.00 | $15,000 |
| 95 | Secondary sign mounts (0930-0110000A) | LB | 219.60 | $22.77 | $22.77 | $22.77 |
| 96 | Triangular base breakaway sign supports (0930-0112000A) | LB | 2,326.70 | $10.32 | $10.32 | $10.32 |
| 97 | Permanent seeding (1030-0108000R) | ACRE | 3.25 | $4,500.00 | $4,500.00 | $4,500.00 |
| 98 | Hot applied joint sealant replacement (0585-0400000A) | LF | 84 | $30.00 | $16.07 | $16.96 |
| 99 | Check dam, type 1 (0280-0106010E) | EACH | 53 | $350.00 | $416.00 | $250.00 |
| 100 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 306 | $35.00 | $10.10 | $13.00 |
| 101 | Temporary striping (0225-0153000F) | LF | 380,375 | $0.07 | $0.07 | $0.10 |
| 102 | Sediment barrier, type 3 (0280-0115030F) | LF | 3,906 | $4.50 | $5.00 | $5.00 |
| 103 | Temporary flexible pavement markers (0225-0149000E) | EACH | 30,050 | $0.65 | $1.80 | $2.00 |
| 104 | Concrete inlets, type D (0470-0311000E) | EACH | 1 | $2,500.00 | $6,450.00 | $7,000.00 |
| 105 | Guardrail transition (0810-0126000E) | EACH | 17 | $4,185.00 | $4,200.00 | $4,185.00 |
| 106 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 235 | $45.00 | $45.00 | $45.00 |
| 107 | Delineators, type 5 (0840-0105000E) | EACH | 334 | $21.00 | $21.00 | $21.00 |
| 108 | Pavement bar, type B-HS (0867-0145100J) | SF | 1,782 | $16.50 | $16.50 | $16.50 |
| 109 | Wood sign posts (0910-0100000K) | FBM | 788 | $24.00 | $24.00 | $24.00 |
| 110 | Flagger station lighting (0223-0168100E) | EACH | 3 | $1,000.00 | $2,450.00 | $5,500.00 |
| 111 | Emulsified asphalt for tack coat (0730-0100000M) | TON | 155 | $1,400.00 | $523.00 | $1.00 |
| 112 | Concrete barrier, tall (0820-0127000F) | LF | 425 | $145.00 | $145.00 | $145.00 |
| 113 | Guardrail anchors, type 1 modified (0810-0120000E) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 |
| 114 | Milepost marker posts (0840-0106000E) | EACH | 2 | $250.00 | $250.00 | $250.00 |
| 115 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 283 | $35.00 | $10.35 | $14.00 |
| 116 | Furnish mpco material (0556-0300000J) | SY | 859 | $23.70 | $20.15 | $20.25 |
| 117 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 404.30 | $29.00 | $29.00 | $29.00 |
| 118 | Pole foundations (0970-0100000A) | EACH | 1 | $9,100.00 | $9,050.00 | $2,650.00 |
| 119 | Mulching (1030-0140000R) | ACRE | 3.25 | $2,100.00 | $2,100.00 | $2,100.00 |
| 120 | Temporary barricades, type III (0224-0105000E) | EACH | 11 | $165.00 | $250.00 | $205.00 |
| 121 | Emulsified asphalt in fog coat (0705-0101000M) | TON | 45 | $1,045.00 | $804.00 | $720.00 |
| 122 | Paved culvert end slopes (0460-0100000J) | SF | 35 | $50.00 | $72.50 | $86.00 |
| 123 | Construct mpco (0556-0500000J) | SY | 1,971 | $23.70 | $20.80 | $21.00 |
| 124 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 283 | $35.00 | $10.35 | $14.00 |
| 125 | Construct mpco (0556-0500000J) | SY | 1,262 | $23.70 | $21.45 | $23.00 |
| 126 | Type "F" concrete rail, 42 inch, with moment slab (0587-0126100A) | LF | 62.50 | $1,200.00 | $1,648.00 | $1,408.00 |
| 127 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 283 | $35.00 | $10.35 | $14.00 |
| 128 | Furnish mpco material (0556-0300000J) | SY | 1,262 | $23.70 | $19.95 | $21.00 |
| 129 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 2,870 | $16.75 | $16.75 | $16.75 |
| 130 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 213 | $50.00 | $50.00 | $50.00 |
| 131 | 12 inch subgrade stabilization (0331-0106000J) | SY | 350 | $40.00 | $49.95 | $52.00 |
| 132 | Aggregate base (0641-0102000M) | TON | 8,300 | $57.00 | $60.85 | $47.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of May 22, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way