ODOT contract 15630 bid tabulation
Or99w: marys river br - kiger island rd (corvallis). Let by Oregon DOT on December 11, 2025, Region 2. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 11 DEC 2025
- Pay items
- 106
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Control joint (0585-0300000A) | LF | 20 | $32.50 | $33.50 | $35.00 | $33.00 | $95.00 |
| 2 | Temporary walks (0228-0167680J) | SF | 2,500 | $3.00 | $2.70 | $7.00 | $9.50 | $4.50 |
| 3 | Portable changeable message signs (0222-0164000E) | EACH | 4 | $4,800.00 | $8,550.00 | $4,000.00 | $6,000.00 | $8,350.00 |
| 4 | Flaggers (0223-0168000T) | HR | 400 | $76.00 | $88.00 | $75.00 | $95.00 | $80.50 |
| 5 | Temporary plastic drums (0224-0145000E) | EACH | 81 | $30.00 | $70.00 | $50.00 | $50.00 | $27.50 |
| 6 | Asphalt pavement sawcutting, 8 inches deep (0310-0119100F) | LF | 1,530 | $3.50 | $3.25 | $6.00 | $2.60 | $2.80 |
| 7 | Bridge identification markers (0842-0401000E) | EACH | 2 | $220.00 | $375.00 | $250.00 | $400.00 | $380.00 |
| 8 | Emulsified asphalt for tack coat (0730-0100000M) | TON | 26 | $1.00 | $520.00 | $700.00 | $1.00 | $1.00 |
| 9 | Pavement bar, type B-HS (0867-0145100J) | SF | 1,980 | $17.00 | $16.50 | $17.00 | $17.00 | $17.50 |
| 10 | Remove existing signs (0905-0100000A) | LS | 1 | $300.00 | $265.00 | $400.00 | $300.00 | $275.00 |
| 11 | Pavement legend, type B-HS: "xing" (0867-0153100E) | EACH | 4 | $1,300.00 | $1,250.00 | $1,250.00 | $1,300.00 | $1,375.00 |
| 12 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 44,130 | $2.00 | $2.66 | $1.70 | $3.15 | $3.60 |
| 13 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 30 | $42.00 | $43.00 | $40.00 | $40.00 | $42.50 |
| 14 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 119.50 | $12.55 | $10.75 | $10.04 | $10.04 | $10.88 |
| 15 | Level 3, 1/2 inch ACP in leveling (0745-0331000M) | TON | 210 | $150.00 | $93.00 | $150.00 | $150.00 | $120.00 |
| 16 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 2 | $3,600.00 | $3,745.00 | $3,500.00 | $3,600.00 | $3,900.00 |
| 17 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 4 | $3,000.00 | $4,280.00 | $1,500.00 | $3,700.00 | $4,300.00 |
| 18 | Bridge deck cold plane pavement removal, 2-6 inches deep (0503-0102000J) | SY | 584 | $15.00 | $18.20 | $20.00 | $19.00 | $24.00 |
| 19 | Hot applied joint sealant (0585-0400000A) | LF | 67 | $9.70 | $10.00 | $10.45 | $9.85 | $11.19 |
| 20 | Bridge approach slab cold plane pavement removal, 2-4 inches deep (0503-0103100J) | SY | 59 | $17.00 | $7.50 | $12.00 | $20.00 | $60.00 |
| 21 | Concrete walks (0759-0128000J) | SF | 8,464 | $20.50 | $10.50 | $10.00 | $12.00 | $19.00 |
| 22 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 75 | $36.00 | $37.50 | $36.00 | $36.00 | $36.00 |
| 23 | Sod lawn (1040-0189000J) | SY | 18 | $125.00 | $133.00 | $125.00 | $125.00 | $140.00 |
| 24 | Irrigation system (1120-0100000A) | LS | 1 | $4,000.00 | $3,950.00 | $3,800.00 | $4,000.00 | $4,100.00 |
| 25 | Connection to existing structures (0490-0104000E) | EACH | 1 | $1,000.00 | $1,075.00 | $2,500.00 | $2,000.00 | $2,700.00 |
| 26 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 1 | $4,500.00 | $4,550.00 | $5,000.00 | $4,300.00 | $1,100.00 |
| 27 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $5,100.00 | $5,190.00 | $6,000.00 | $5,000.00 | $1,950.00 |
| 28 | PG 64-22 asphalt in level 3 1/2 inch ACP (0745-0620000M) | TON | 1,036 | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 |
| 29 | Concrete manholes, with inlet (0470-0103000E) | EACH | 4 | $3,000.00 | $6,315.00 | $10,000 | $8,800.00 | $15,000 |
| 30 | Control joint (0585-0300000A) | LF | 24 | $27.08 | $27.92 | $29.17 | $27.50 | $77.92 |
| 31 | Contaminated soil disposal (0294-0200010M) | TON | 32 | $150.00 | $177.00 | $150.00 | $130.00 | $140.00 |
| 32 | Bridge approach slab cold plane pavement removal, 2-6 inches deep (0503-0103100J) | SY | 503 | $13.00 | $18.20 | $12.00 | $19.00 | $22.00 |
| 33 | Pollution control plan (0290-0100000A) | LS | 1 | $500.00 | $3,200.00 | $500.00 | $500.00 | $500.00 |
| 34 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 367 | $56.00 | $48.00 | $20.00 | $46.00 | $58.00 |
| 35 | 6 inch concrete surfacing (0759-0140000J) | SF | 276 | $24.75 | $12.50 | $30.00 | $15.00 | $25.00 |
| 36 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 16 | $240.00 | $257.00 | $275.00 | $205.00 | $160.00 |
| 37 | Hot applied joint sealant (0585-0400000A) | LF | 64 | $10.16 | $10.47 | $10.94 | $10.31 | $23.05 |
| 38 | Stone embankment (0330-0126000K) | CY | 37 | $135.00 | $80.25 | $110.00 | $50.00 | $160.00 |
| 39 | Flagger station lighting (0223-0168100E) | EACH | 4 | $500.00 | $4,250.00 | $1,000.00 | $5,500.00 | $2,700.00 |
| 40 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 29 | $420.00 | $400.00 | $400.00 | $400.00 | $425.00 |
| 41 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 732 | $31.00 | $67.50 | $85.00 | $80.00 | $40.00 |
| 42 | General excavation (0330-0105000K) | CY | 635 | $66.00 | $43.00 | $125.00 | $110.00 | $84.00 |
| 43 | Concrete sawcutting, 6 inches deep (0310-0119200F) | LF | 195 | $8.50 | $5.35 | $4.50 | $9.50 | $5.00 |
| 44 | Temporary striping (0225-0153000F) | LF | 72,000 | $0.20 | $0.01 | $0.08 | $0.20 | $0.08 |
| 45 | Mono-directional white type iar markers (0855-0101100E) | EACH | 2 | $50.00 | $50.00 | $51.00 | $50.00 | $52.50 |
| 46 | Soil conditioner (1040-0107000K) | CY | 1 | $900.00 | $963.00 | $900.00 | $900.00 | $1,000.00 |
| 47 | Pavement legend, type B-HS: "school" (0867-0111100E) | EACH | 4 | $1,500.00 | $1,450.00 | $1,450.00 | $1,500.00 | $1,550.00 |
| 48 | Concrete curbs, standard curb (0759-0110000F) | LF | 847 | $29.00 | $46.00 | $75.00 | $59.00 | $37.00 |
| 49 | Thermoplastic, extruded or sprayed, surface, non-profiled (0865-0160000F) | LF | 117,000 | $1.15 | $1.15 | $1.18 | $1.15 | $1.20 |
| 50 | Pedestrian channelizing devices (0228-0141600F) | LF | 3,000 | $5.50 | $21.50 | $0.01 | $31.00 | $7.75 |
| 51 | Soil sample collection and analytical testing (0294-0700000E) | EACH | 5 | $1,500.00 | $1,600.00 | $1,100.00 | $1,800.00 | $1,650.00 |
| 52 | Concrete storm sewer manholes (0470-0101000E) | EACH | 1 | $5,100.00 | $5,775.00 | $10,000 | $6,800.00 | $13,500 |
| 53 | Inlet protection, type 10 (0280-0114100E) | EACH | 119 | $47.00 | $198.00 | $50.00 | $60.00 | $49.00 |
| 54 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 48 | $350.00 | $2,140.00 | $0.01 | $500.00 | $1,375.00 |
| 55 | Inlet protection, type 3 (0280-0114030E) | EACH | 9 | $74.00 | $184.00 | $50.00 | $75.00 | $75.50 |
| 56 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 9 | $46.00 | $53.50 | $28.00 | $45.00 | $47.50 |
| 57 | Minor adjustment of manholes (0490-0120000E) | EACH | 4 | $2,000.00 | $3,210.00 | $2,000.00 | $1,800.00 | $2,500.00 |
| 58 | Concrete repair (0542-0102001J) | SF | 5 | $450.00 | $455.00 | $500.00 | $450.00 | $625.00 |
| 59 | Health and safety plan (0294-0100000A) | LS | 1 | $3,700.00 | $10,500 | $1,500.00 | $1,100.00 | $2,765.00 |
| 60 | Temporary signs (0222-0102000J) | SF | 705 | $35.00 | $34.50 | $30.00 | $34.00 | $11.00 |
| 61 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $1,750.00 | $2,675.00 | $2,000.00 | $2,800.00 | $4,125.00 |
| 62 | Check dam, type 3 (0280-0106030E) | EACH | 7 | $165.00 | $187.00 | $200.00 | $140.00 | $150.00 |
| 63 | Metal handrail, 3 rail with optional rail (1069-0300000F) | LF | 26 | $255.00 | $270.00 | $200.00 | $250.00 | $425.00 |
| 64 | Green bicycle lane, preformed thermoplastic film (0868-0100000J) | SF | 920 | $19.00 | $18.50 | $19.00 | $19.00 | $20.00 |
| 65 | Flashing beacon installation, MP 84.36 (0990-0106000A) | EACH | 1 | $14,000 | $14,800 | $14,000 | $14,000 | $16,250 |
| 66 | Sign support footings (0920-0100000A) | CY | 0.30 | $4,333.33 | $4,283.33 | $4,333.33 | $4,000.00 | $4,333.33 |
| 67 | Mainline video inspection (0415-0100000F) | LF | 50 | $35.00 | $65.00 | $35.00 | $20.00 | $42.00 |
| 68 | Capping existing concrete structures (0490-0125000E) | EACH | 5 | $1,000.00 | $3,750.00 | $2,000.00 | $1,200.00 | $1,600.00 |
| 69 | Concrete curbs, low profile mountable curb (0759-0106000F) | LF | 54 | $51.00 | $50.00 | $65.00 | $60.00 | $64.50 |
| 70 | Core correlation of nuclear gauge readings (0745-0900000E) | EACH | 3 | $3,500.00 | $3,210.00 | $1,000.00 | $1,000.00 | $2,775.00 |
| 71 | Topsoil (1040-0101000K) | CY | 3 | $300.00 | $325.00 | $300.00 | $300.00 | $330.00 |
| 72 | 29 inch asphalt concrete pavement repair (0748-0116000J) | SY | 300 | $84.00 | $80.25 | $100.00 | $115.00 | $110.00 |
| 73 | BI-directional yellow type iar markers (0855-0103100E) | EACH | 2 | $50.00 | $50.00 | $51.00 | $50.00 | $52.50 |
| 74 | Temporary barricades, type III (0224-0105000E) | EACH | 8 | $105.00 | $295.00 | $200.00 | $200.00 | $97.00 |
| 75 | Flashing beacon installation, MP 84.73 (0990-0106000A) | EACH | 1 | $15,000 | $15,725 | $15,000 | $15,000 | $16,250 |
| 76 | Traffic signal modification, OR99W at alexander ave (0990-0102000A) | EACH | 1 | $87,000 | $92,900 | $89,000 | $90,000 | $96,000 |
| 77 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 4 | $400.00 | $400.00 | $385.00 | $380.00 | $110.00 |
| 78 | Bridge identification markers (0842-0401000E) | EACH | 1 | $220.00 | $375.00 | $250.00 | $400.00 | $375.00 |
| 79 | Bridge identification markers (0842-0401000E) | EACH | 1 | $220.00 | $375.00 | $250.00 | $400.00 | $375.00 |
| 80 | Inlet protection, type 11 (0280-0114110E) | EACH | 1 | $235.00 | $267.00 | $60.00 | $170.00 | $130.00 |
| 81 | Bridge approach slab cold plane pavement removal, 2-6 inches deep (0503-0103100J) | SY | 110 | $14.00 | $7.50 | $12.00 | $16.00 | $44.00 |
| 82 | CL-4 chain link fence (1050-0135000F) | LF | 50 | $105.00 | $43.00 | $100.00 | $100.00 | $110.00 |
| 83 | Sediment fence (0280-0113000F) | LF | 153 | $3.00 | $6.50 | $4.00 | $7.00 | $9.00 |
| 84 | Sediment barrier, type 3 (0280-0115030F) | LF | 232 | $7.25 | $5.35 | $6.00 | $6.00 | $5.50 |
| 85 | Flashing beacon installation, MP 85.12 (0990-0106000A) | EACH | 1 | $14,000 | $15,000 | $14,000 | $14,000 | $16,250 |
| 86 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 25 | $77.00 | $80.25 | $77.00 | $76.00 | $73.50 |
| 87 | Aggregate base (0640-0100000M) | TON | 480 | $56.00 | $42.00 | $100.00 | $50.00 | $90.00 |
| 88 | Rolled waterproof membrane (0592-0101000J) | SF | 6,080 | $3.75 | $4.85 | $4.00 | $4.00 | $5.00 |
| 89 | Control joint (0585-0300000A) | LF | 396 | $17.93 | $18.78 | $17.68 | $18.94 | $18.94 |
| 90 | Temporary flexible pavement markers (0225-0149000E) | EACH | 5,000 | $0.55 | $1.65 | $1.00 | $3.00 | $2.50 |
| 91 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $4,500.00 | $10,500 | $3,000.00 | $1,500.00 | $1,850.00 |
| 92 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 2 | $3,000.00 | $4,280.00 | $5,000.00 | $3,400.00 | $7,500.00 |
| 93 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 3 | $1,500.00 | $3,210.00 | $5,000.00 | $1,100.00 | $575.00 |
| 94 | Bridge identification markers (0842-0401000E) | EACH | 1 | $220.00 | $375.00 | $250.00 | $400.00 | $375.00 |
| 95 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 3 | $1,000.00 | $1.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 96 | Temporary barricades, type II (0224-0104000E) | EACH | 28 | $25.00 | $165.00 | $80.00 | $70.00 | $36.00 |
| 97 | Guardrail transition (0810-0126000E) | EACH | 2 | $4,500.00 | $4,225.00 | $4,000.00 | $4,000.00 | $3,650.00 |
| 98 | Cold plane pavement removal, 4 inches deep (0620-0123000J) | SY | 43,680 | $2.50 | $3.05 | $2.00 | $4.00 | $4.60 |
| 99 | Hot applied joint sealant (0585-0400000A) | LF | 51 | $12.75 | $13.14 | $13.73 | $12.94 | $27.45 |
| 100 | Class 2 preparation (0504-0100000J) | SY | 12 | $450.00 | $455.00 | $450.00 | $430.00 | $500.00 |
| 101 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $2,500.00 | $97,250 | $2,000.00 | $10,000 | $5,250.00 |
| 102 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $15,000 | $13,375 | $5,000.00 | $17,000 | $20,750 |
| 103 | Flashing beacon installation, MP 84.85 (0990-0106000A) | EACH | 1 | $15,000 | $15,875 | $15,000 | $15,000 | $16,250 |
| 104 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 17,278 | $77.50 | $73.00 | $93.00 | $88.00 | $91.00 |
| 105 | Control joint (0585-0300000A) | LF | 26 | $25.00 | $25.77 | $26.92 | $25.38 | $24.04 |
| 106 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 66 | $400.00 | $400.00 | $400.00 | $400.00 | $425.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of December 11, 2025. Compiled by Mirage Metrics.