ODOT contract 15632 bid tabulation

Tower road interchange bridge over i-84. Let by Oregon DOT on December 11, 2025, Region 5. 7 bids received.

Owner
Oregon DOT
Letting
11 DEC 2025
Pay items
69
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
6
7
ODOT contract 15632: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5Rank 6
13 tube curb mount rail (0587-0105000A)LF82$304.88$304.88$609.76$365.85$609.76$353.66
2Bridge removal work (0501-0100000A)SF402$149.25$186.57$186.57$199.00$248.76$281.73
3Permanent seeding (1030-0108000R)ACRE0.20$8,600.00$14,100$8,600.00$12,000$8,600.00$8,800.00
4Bridge approach sleeper slabs (0545-0100200F)LF67$350.00$325.00$420.00$400.00$550.00$725.00
5Temporary impact attenuator, truck mounted (0226-0138000E)EACH1$15,000$12,000$15,000$15,000$7,500.00$6,500.00
68 foot type D protective fence (0587-0140000F)LF340$140.00$130.00$125.00$210.00$200.00$265.00
7Constructing elastomeric concrete nosing (0584-0104000J)SF73$130.00$127.00$127.00$140.00$127.00$130.00
8Elastomeric concrete nosing material (0584-0103000C)CF13$100.00$97.00$99.00$100.00$97.00$105.00
9Concrete and crack sealer (0539-0100000J)SF8,028$2.15$2.13$2.13$2.00$2.25$2.45
10Penetrating concrete sealing (0537-0101000J)SF9,617$1.00$0.97$0.97$0.90$1.00$1.05
11PG 70-28ER asphalt in level 4, 1/2 inch lime treated ACP (0745-0642100M)TON110$0.01$1.00$0.10$1.00$0.10$0.25
12Flagger station lighting (0223-0168100E)EACH4$500.00$1,000.00$900.00$100.00$1,500.00$2,000.00
13Clearing and grubbing (0320-0100000A)ACRE0.10$10,000$150,000$50,000$10,000$100,000$65,000
14Extra for salvaging and stockpiling bridge (0501-0200000A)SF170$17.65$29.41$11.76$88.24$29.41$6.47
15Reinforcement, grade 60 (0530-0104000A)LB1,880$3.72$2.66$2.93$15.96$21.28$6.81
16Control joint (0585-0300000A)LF67$44.78$26.87$26.87$29.85$52.24$29.63
17Perforated steel square tube slip base sign supports (0930-0114000A)LB220$13.64$10.91$10.91$11.36$10.91$18.86
183 tube curb mount rail, modified (0587-0106000A)LF536$317.16$345.15$382.46$373.13$326.49$351.22
19Guardrail transition (0810-0126000E)EACH4$1,500.00$1,488.00$1,488.00$1,500.00$1,488.00$3,400.00
20Remove and reinstall existing signs (0905-0101000A)LS1$2,000.00$1,850.00$1,850.00$2,000.00$1,850.00$3,950.00
21Granular structure backfill (0510-0108000A)CY57$122.81$131.58$175.44$175.44$263.16$491.23
22Removal of surfacings (0310-0103000J)SY67$40.00$90.92$50.00$20.00$66.00$38.00
23Triangular base breakaway sign supports (0930-0112000A)LB306$22.88$19.61$19.61$19.61$19.61$12.91
24Surface texturing (0540-0401000J)SY118$10.00$96.36$87.00$60.00$90.00$88.00
25Lead compliance plan (0294-0500000A)LS1$1,000.00$1,500.00$1,000.00$4,000.00$2,000.00$1,850.00
26Cold plane pavement removal, 6 1/2 inches deep (0620-0126000J)SY4,400$11.25$11.15$9.98$10.00$11.30$14.00
27Sign support footings (0920-0100000A)CY2$3,500.00$3,250.00$3,250.00$3,250.00$3,250.00$3,675.00
28Remove and patch shallow rebar and anchors (1999-9Z90000E)EACH898$22.00$20.00$32.00$15.00$20.00$35.00
29Guardrail anchors, type 1 modified (0810-0120000E)EACH4$1,300.00$1,273.00$1,273.00$1,400.00$1,273.00$1,600.00
30Concrete repair (0542-0102001J)SF29$500.00$420.00$500.00$300.00$375.00$595.00
31Precompressed foam silicone joint seal (0585-0215000A)LF63$95.24$79.37$79.37$79.37$119.05$100.00
32Extra for hand dug guardrail post holes (0810-0145000E)EACH3$400.00$377.00$377.00$400.00$377.00$305.00
33Pavement legend, type B: arrows (0867-0103000E)EACH2$600.00$600.00$600.00$600.00$600.00$620.00
34Reinforced concrete bridge approach slabs (0545-0100100J)SY152$300.00$575.00$480.00$500.00$760.00$955.00
35Temporary barricades, type III (0224-0105000E)EACH15$150.00$150.00$160.00$150.00$150.00$360.00
36Structure excavation (0510-0101000A)CY238$67.23$27.31$54.62$50.42$105.04$122.92
37Portable changeable message signs (0222-0164000E)EACH3$11,000$2,000.00$4,000.00$5,000.00$17,500$2,800.00
38Pollution control plan (0290-0100000A)LS1$1,000.00$500.00$1,000.00$1,000.00$1,000.00$1,200.00
39Locate concrete repair (0542-0100000A)LS1$2,000.00$5,000.00$1,400.00$1,000.00$5,000.00$3,600.00
40Wood sign posts (0910-0100000K)FBM88$17.00$17.00$17.00$20.00$17.00$35.00
41Midwest guardrail system, type 2A (0810-0146100F)LF362.50$33.00$32.90$33.00$35.00$33.00$25.00
42Sequential arrow signs (0222-0162000E)EACH2$500.00$1,050.00$2,000.00$2,000.00$5,000.00$1,900.00
43Pavement bar, type B (0867-0145000J)SF220$16.85$16.85$16.85$17.00$16.85$17.50
44Flaggers (0223-0168000T)HR80$100.00$58.00$85.00$90.00$70.00$88.00
45Level 4, 1/2 inch lime treated ACP (0745-0422000M)TON1,900$150.00$141.65$142.00$145.00$141.65$145.00
46General excavation (0330-0105000K)CY220$80.00$65.00$36.00$100.00$48.00$49.50
47Repair temporary impact attenuator, truck mounted (0226-0141400E)EACH1$0.01$1,500.00$1.00$1.00$1.00$1,200.00
48Class 2 preparation (0504-0100000J)SY85$0.01$295.00$330.00$400.00$50.00$300.00
49Temporary signs (0222-0102000J)SF700$20.00$20.00$20.05$20.00$20.00$32.00
50Guardrail terminals, non-flared (0810-0129000E)EACH2$3,600.00$3,540.00$3,540.00$3,500.00$3,540.00$3,400.00
51Plural component, sprayed, surface (0866-0113000F)LF9,300$0.78$0.78$0.78$0.80$0.78$0.85
52Cold plane pavement removal, 2 1/2 inches deep (0620-0120000J)SY690$5.50$9.37$7.80$10.00$8.50$12.00
53General structural concrete, class 4000 (0540-0302000A)CY5$5,000.00$3,000.00$4,400.00$2,400.00$10,000$11,258
54Temporary plastic drums (0224-0145000E)EACH300$10.00$45.00$45.00$40.00$45.00$85.00
55Sediment barrier, type 3 (0280-0115030F)LF330$10.00$7.50$3.95$5.00$7.00$7.00
56Removal of structures and obstructions (0310-0106000A)LS1$5,000.00$15,000$5,000.00$15,000$10,000$23,255
57Drainage geotextile, type 2 (0350-0101000J)SY280$4.00$5.00$3.50$20.00$3.10$5.75
58Temporary work access and containment (0253-0106000A)LS1$80,000$45,000$97,500$100,000$100,000$98,235
59Delineators, type 4 alternate 1 (0840-0104100E)EACH21$18.00$18.00$18.00$20.00$18.00$115.00
60Bridge identification markers (0842-0401000E)EACH4$200.00$200.00$200.00$350.00$200.00$575.00
61Stone embankment (0330-0126000K)CY115$90.00$75.00$75.00$80.00$113.00$105.00
62Reinforcement, ASTM A1035 CS (0530-0104300O)LB417$8.00$4.19$29.00$5.00$3.00$54.00
63Loose riprap, class 50 (0390-0105000K)CY160$100.00$165.00$90.00$200.00$130.00$145.00
64Stripe removal (0225-0154000F)LF3,800$0.95$0.95$0.95$1.00$0.95$1.00
65Aggregate base (0641-0102000M)TON290$24.00$80.00$51.00$75.00$70.00$68.00
66Extra for asphalt approaches (0749-0100000E)EACH4$1,500.00$1,000.00$1,000.00$1,000.00$1,000.00$1,100.00
67Guardrail terminals, downstream anchor terminal (0810-0132200E)EACH2$1,700.00$1,608.00$1,608.00$1,600.00$1,608.00$2,200.00
68Midwest guardrail system, type 3 (0810-0146100F)LF50$34.00$33.75$34.00$35.00$33.75$65.00
69Subgrade geotextile (0350-0105000J)SY110$4.00$5.00$3.50$12.00$5.00$9.95
ODOT contract 15632: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of December 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy