Douglas avenue: deer creek bridge (roseburg). Let by Oregon DOT on August 13, 2026, Region 3. 6 bids received.

Owner
Oregon DOT
Letting
13 AUG 2026
Pay items
147
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
6
ODOT contract 15679: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5Rank 6
1Drilled shaft reinforcement, grade 80 (0512-0104000A)LB20,200$1.98$1.49$2.72$1.63$2.23$1.98
2Sediment fence (0280-0113000F)LF291$5.00$4.00$5.00$4.00$4.35$8.00
3Temporary signs (0222-0102000J)SF359$26.00$26.00$26.00$28.00$25.00$26.00
4Concrete manholes, diversion (0470-0116000E)EACH1$15,000$20,000$14,600$24,000$13,700$20,000
512 inch storm sewer pipe, 5 FT depth (0445-035012AF)LF50$90.00$200.00$105.00$150.00$77.00$140.00
6Plastic sheeting (0280-0101000J)SY30$5.00$10.00$10.00$20.00$9.00$15.00
712 inch storm sewer pipe, 10 FT depth (0445-035012BF)LF35$125.00$250.00$123.00$240.00$210.00$200.00
8Sediment barrier, type 8 (0280-0115080F)LF1,524$9.00$9.00$5.50$7.00$9.85$10.00
918 inch subgrade stabilization (0331-0109000J)SY90$45.00$47.00$24.00$70.00$61.00$100.00
10Bridge removal work (0501-0100000A)SF6,417$28.05$23.38$35.06$21.04$45.19$19.48
11Removal of fences (0310-0112000A)LF175$2.86$11.43$0.03$11.43$8.86$5.71
12CSL tests (0512-0106000E)EACH12$2,100.00$1,582.00$1,582.00$3,000.00$1,730.00$1,600.00
13Major adjustment of manholes (0490-0121000E)EACH1$2,500.00$3,500.00$2,400.00$3,000.00$1,890.00$6,000.00
14Type "E" preformed compression joint seal (0585-0212100A)LF109$91.74$81.65$81.65$91.74$142.20$82.57
1512 inch ductile iron pipe with restrained joints and class B backfill (1140-0500000F)LF95$210.00$215.00$134.00$270.00$310.00$250.00
16Mailbox concrete collars (1070-0102000E)EACH4$75.00$75.00$75.00$100.00$82.00$75.00
17Thermoplastic, sprayed, surface, non-profiled (0865-0119600F)LF1,080$2.50$2.50$2.50$2.50$2.75$2.50
18Midwest guardrail system, type 3 (0810-0146100F)LF12.50$68.00$68.00$68.00$70.00$74.00$70.00
19Utility attachment on structure, water line (0589-0101100A)LS1$20,000$28,000$16,000$60,000$15,800$30,000
20CSL test access tubes (0512-0105000F)LF1,650$13.70$11.50$20.00$13.00$14.40$12.00
21Removal of manholes (0310-0105000E)EACH2$3,500.00$1,500.00$1,800.00$1,200.00$810.00$2,000.00
22Temporary plastic drums (0224-0145000E)EACH6$100.00$39.00$50.00$100.00$100.00$50.00
23Ductile iron pipe tees, 12 inch (1140-0610000E)EACH2$5,000.00$4,600.00$4,800.00$4,000.00$4,940.00$7,000.00
24Temporary potable water bypass system (1999-9Z90000A)LS1$70,000$55,000$38,400$25,000$76,600$150,000
25Relocate 1 inch water meter assembly (1170-0111000E)EACH1$1,300.00$1,000.00$1,100.00$1,500.00$790.00$1,500.00
26Drilled shaft excavation, 72 inch diameter (0512-0112000F)LF100$1,650.00$1,640.00$2,290.00$2,300.00$2,000.00$1,800.00
27Drilled shaft excavation, 36 inch diameter (0512-0108000F)LF242$720.00$710.00$970.00$1,000.00$900.00$800.00
28Temporary work access and containment (0253-0106000A)LS1$159,700$275,000$22,000$10,000$30,700$125,000
29Concrete manholes, with inlet type CG-3 (0470-0103000E)EACH1$9,000.00$6,500.00$8,900.00$12,000$8,160.00$10,000
3024 inch storm sewer pipe, 5 FT depth (0445-035024AF)LF90$155.00$225.00$110.00$215.00$130.00$150.00
31Clearing and grubbing (0320-0100000A)ACRE0.75$26,667$100,000$60,000$56,000$66,667$53,333
32Pollution control plan (0290-0100000A)LS1$2,000.00$500.00$500.00$100.00$3,000.00$2,500.00
33Mainline video with laser profile inspection (0415-0401000F)LF314$12.50$20.00$16.00$10.00$17.60$15.00
34Signs, standard sheeting, sheet aluminum (0940-0202000J)SF9.25$30.00$30.00$30.00$40.00$32.80$30.00
35Coated reinforcement, grade 60 (0530-0104100A)LB1,500$3.33$2.67$2.53$2.00$3.83$1.07
366 inch gas line casing pipe under bridge approach slabs (0545-0100200F)LF80$85.00$250.00$223.00$120.00$110.00$150.00
37Drilled shaft reinforcement, grade 60 (0512-0104000A)LB50,500$2.77$2.11$3.17$2.77$3.79$2.97
38Concrete curbs, curb and gutter (0759-0103000F)LF372$46.00$37.00$38.00$60.00$72.00$75.00
39Shrubs, #1 container (1040-0153000E)EACH306$65.00$65.00$6.00$65.00$71.00$6.00
40Expansion joint, 12 inch (1140-0660000E)EACH1$6,000.00$4,328.08$5,630.00$5,000.00$6,360.00$6,500.00
41Furnish drilling equipment (0512-0100000A)LS1$100,000$45,275$154,000$75,000$50,000$100,000
42Sidewalk mounted combination bridge rail (0587-0112000A)LF500$300.00$270.00$330.00$600.00$310.00$400.00
43Deciduous trees, #1 container (1040-0147000E)EACH14$65.00$65.00$10.00$65.00$10.00$10.00
44Single mailbox supports (1070-0100000E)EACH2$425.00$425.00$425.00$500.00$460.00$450.00
4512 inch ductile iron pipe with restrained joints on structure (1140-0500000F)LF213$155.00$205.66$260.00$235.00$140.00$200.00
46Inlet protection, type 10 (0280-0114100E)EACH3$200.00$100.00$54.00$200.00$98.00$105.00
47Concrete inlets, type G-2 (0470-0315000E)EACH1$6,000.00$6,000.00$3,900.00$7,000.00$3,810.00$5,000.00
48Structure excavation (0510-0101000A)CY745$33.56$50.34$25.93$87.25$87.25$100.67
49Concrete curbs, standard curb (0759-0110000F)LF17$44.00$34.00$45.00$60.00$54.00$100.00
50Inlet protection, type 4 (0280-0114040E)EACH3$200.00$85.00$100.00$200.00$77.00$200.00
51Subgrade geotextile (0350-0105000J)SY1,498$2.00$3.00$2.00$5.00$1.45$2.00
52Ductile iron pipe coupling, 12 inch (1140-0660000E)EACH4$1,700.00$1,500.00$1,500.00$1,300.00$1,310.00$1,500.00
531 inch water service connection piping (1170-0103000F)LF50$15.00$90.00$39.00$50.00$63.00$2,500.00
54Bark mulch (1040-0190000K)CY183$98.00$98.00$65.00$75.00$110.00$65.00
551 inch combination air release / air vacuum valve assembly (1150-0600000E)EACH1$7,000.00$5,314.51$8,600.00$7,000.00$6,710.00$8,000.00
56Permanent seeding (1030-0108000R)ACRE0.44$6,000.00$6,000.00$10,000$6,000.00$10,900$10,000
57Reinforced concrete bridge approach slabs (0545-0100100J)SY232$319.00$375.00$300.00$425.00$420.00$375.00
58Loose riprap, class 700 (0390-0114000K)CY500$85.00$190.00$105.00$110.00$125.00$90.00
59Minor adjustment of manholes (0490-0120000E)EACH1$1,000.00$2,000.00$1,300.00$2,000.00$1,190.00$2,500.00
60Deciduous trees, #2 container (1040-0148000E)EACH7$200.00$200.00$13.00$200.00$14.00$13.00
61Guardrail transition (0810-0126000E)EACH1$4,250.00$4,250.00$4,250.00$5,000.00$4,640.00$4,250.00
62Utility attachment on structure, gas line (0589-0101100A)LS1$25,000$22,000$5,100.00$50,000$9,280.00$30,000
63Subsurface drain outlets (0430-0101000E)EACH2$1,300.00$1,500.00$400.00$800.00$720.00$200.00
64Drainage geotextile, type 1 (0350-0100000J)SY70$7.00$5.00$4.00$5.00$5.80$6.00
65Contaminated soil disposal (0294-0200010M)TON123$100.00$165.00$124.00$25.00$150.00$125.00
66Portable changeable message signs (0222-0164000E)EACH1$15,000$5,000.00$8,000.00$20,000$9,500.00$7,500.00
67Matting, type F (0280-0105060J)SY695$7.00$7.00$4.00$7.00$7.65$5.00
68Extra for selected stone backfill material (0330-0136000K)CY117$30.00$30.00$44.00$70.00$22.45$100.00
69Midwest guardrail system, type 4 (0810-0146100F)LF31.25$180.00$180.00$180.00$200.00$200.00$180.00
708 inch drain pipe (0430-0100080F)LF105$58.00$75.00$47.00$85.00$11.30$40.00
71Guardrail anchors, type 1 modified (0810-0120000E)EACH3$875.00$875.00$875.00$1,000.00$960.00$875.00
72Guardrail end pieces, type B (0810-0122000E)EACH2$135.00$135.00$135.00$150.00$150.00$135.00
736 inch ductile iron pipe with class B backfill (1140-0400000F)LF15$150.00$260.00$105.00$300.00$230.00$300.00
7412 inch ductile iron pipe with restrained joints in casing (1140-0500000F)LF40$190.00$230.00$270.00$185.00$140.00$250.00
75Matting, type D (0280-0105040J)SY100$7.00$7.00$7.00$7.00$7.65$5.00
76Concrete washout facility (0280-0112500E)EACH2$1,200.00$1,500.00$1,000.00$1,500.00$1,640.00$3,000.00
77Riprap geotextile, type 2 (0350-0104000J)SY742$4.00$5.00$2.60$5.00$3.50$8.00
78Concrete straddle blocks (1999-9Z90000E)EACH2$2,300.00$2,750.00$2,800.00$1,200.00$550.00$3,000.00
796 inch storm sewer pipe, 5 FT depth (0445-035006AF)LF30$85.00$200.00$43.00$95.00$70.00$140.00
80Hydrant assemblies (1160-0100000E)EACH1$7,000.00$6,000.00$4,960.00$7,000.00$6,320.00$6,000.00
81Deciduous trees, #5 container (1040-0150000E)EACH10$250.00$250.00$22.00$250.00$24.05$22.00
82Sign support footings (0920-0100000A)CY0.16$2,500.00$2,500.00$2,500.00$9,375.00$2,750.00$2,500.00
83Multiple mailbox supports (1070-0101000E)EACH2$950.00$950.00$950.00$1,100.00$1,040.00$1,000.00
84Flaggers (0223-0168000T)HR80$80.00$75.00$75.00$100.00$120.00$75.00
856 inch gate valve (1150-0100000E)EACH1$2,000.00$5,000.00$5,200.00$4,500.00$2,560.00$3,000.00
8612 inch connection to 12 inch existing main (1140-0300000E)EACH2$1,400.00$6,000.00$2,800.00$2,200.00$3,060.00$800.00
87Pavement legend, type B-HS: shared lane marking (0867-0174000E)EACH1$475.00$475.00$475.00$475.00$520.00$475.00
88Extra for asphalt approaches (0749-0100000E)EACH3$1,500.00$2,250.00$2,200.00$1,500.00$1,640.00$1,500.00
89Deck BT 36 precast prestressed girders (0550-0119000F)LF1,644$910.00$975.00$1,017.00$1,030.00$1,060.00$1,100.00
90Drilled shaft concrete (0512-0101000A)CY169$710.06$591.31$934.91$828.40$968.64$887.57
91Temporary barricades, type III (0224-0105000E)EACH7$200.00$200.00$200.00$200.00$100.00$200.00
92Construction entrance, type prefabricated (0280-0110010E)EACH2$3,000.00$10,000$5,600.00$6,000.00$4,180.00$3,000.00
93Loose riprap, class 50 (0390-0105000K)CY9$150.00$300.00$110.00$110.00$100.00$250.00
9412 inch gate valve (1150-0100000E)EACH4$5,500.00$5,500.00$5,150.00$5,000.00$6,130.00$5,000.00
95Ductile iron pipe bend, 12 inch (1140-0650000E)EACH6$900.00$1,500.00$2,000.00$1,300.00$1,360.00$4,000.00
96Soil testing (1040-0100000E)EACH1$300.00$300.00$200.00$1,000.00$220.00$200.00
97Water quality seeding (1030-0118000R)ACRE0.02$60,000$60,000$10,000$60,000$10,900$1,000.00
98Concrete storm sewer manholes (0470-0101000E)EACH3$8,500.00$6,500.00$6,800.00$9,000.00$6,910.00$7,500.00
99Granular structure backfill (0510-0108000A)CY622$64.31$108.52$70.42$80.39$104.50$96.46
100Elastomeric concrete nosing material (0584-0103000C)CF31.20$190.00$138.00$138.00$140.00$230.00$175.00
101Concrete driveways (0759-0126000J)SF484$13.00$19.00$19.00$36.00$15.45$22.00
102Topsoil (1040-0101000K)CY487$25.00$25.00$58.00$25.00$63.00$58.00
103Guardrail connections (0810-0128000E)EACH1$725.00$725.00$725.00$1,000.00$790.00$725.00
104Concrete walks (0759-0128000J)SF1,479$10.00$10.00$15.00$20.00$13.85$12.00
10515 inch storm sewer pipe, 5 FT depth (0445-035015AF)LF58$120.00$200.00$128.00$175.00$110.00$140.00
106Removal of inlets (0310-0104000E)EACH1$2,000.00$1,000.00$900.00$1,000.00$810.00$1,500.00
107General excavation (0330-0105000K)CY2,950$28.00$32.00$26.00$32.00$40.00$35.00
10824 inch storm sewer pipe, 10 FT depth (0445-035024BF)LF81$230.00$250.00$123.00$345.00$240.00$300.00
109Concrete manholes, large precast (0470-0106000E)EACH1$16,000$13,000$7,800.00$18,000$13,600$15,000
110Connection to existing structures (0490-0104000E)EACH4$1,000.00$1,500.00$1,400.00$1,300.00$1,910.00$250.00
111Aggregate base (0641-0102000M)TON536$46.00$35.00$32.00$40.00$35.30$65.00
112Perforated steel square tube anchor sign supports (0930-0117000A)LB60.50$9.92$9.92$9.92$24.79$10.91$9.92
113Reconnecting existing water services, 1 inch (1170-0105000E)EACH1$3,100.00$1,250.00$900.00$1,500.00$1,690.00$2,500.00
114Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E)EACH2$450.00$450.00$450.00$450.00$490.00$450.00
115Midwest guardrail system, type 2A (0810-0146100F)LF37.50$35.00$35.00$35.00$40.00$38.25$35.00
116Erosion and sediment control manager (0280-0110000A)LS1$1,000.00$22,000$10,000$100.00$53,000$5,000.00
117Inlet protection, type 3 (0280-0114030E)EACH1$250.00$150.00$50.00$200.00$60.00$105.00
118Sediment barrier, type 3 (0280-0115030F)LF300$5.00$5.00$5.00$5.00$5.45$5.00
11920 inch waterline casing pipe under bridge approach slabs (0545-0100200F)LF39$420.00$550.00$705.00$500.00$480.00$700.00
120Constructing elastomeric concrete nosing (0584-0104000J)SF150$46.00$58.80$60.00$60.00$120.00$70.00
121Level 4, 1/2 inch ACP (0745-0402000M)TON703$155.00$149.00$133.00$147.00$160.00$149.00
122Control joint (0585-0300000A)LF435$11.49$16.96$16.96$18.39$48.51$18.39
123Water quality swale, A (1012-0100000A)LS1$20,000$19,400$12,885$22,000$17,600$25,000
124Soil conditioner (1040-0107000K)CY243$100.00$100.00$70.00$50.00$77.00$70.00
125Work containment plan (0290-0102000A)LS1$3,000.00$5,000.00$8,000.00$100.00$3,000.00$5,000.00
126Riprap geotextile, type 1 (0350-0103000J)SY35$10.00$5.00$7.00$5.00$15.75$10.00
127Straw bale (0280-0119000E)EACH5$80.00$100.00$20.00$75.00$39.60$75.00
128Temporary barricades, type II (0224-0104000E)EACH16$60.00$60.00$60.00$100.00$30.00$60.00
129Reinforcement, grade 80 (0530-0104000A)LB10,900$2.29$2.06$2.75$1.93$3.83$2.29
130Bearing devices, 18 inch wide, 7 inch long, 2.0 inch thick (0582-0020000E)EACH16$250.00$500.00$550.00$1,500.00$530.00$1,000.00
131PG 70-22ER asphalt in level 4 ACP (0745-0640100M)TON42.20$0.10$0.10$1.00$0.01$0.10$0.10
132Polymer membrane (0590-0100000J)SF7,592$3.15$4.13$4.13$5.00$3.95$4.13
133Remove existing signs (0905-0100000A)LS1$250.00$250.00$250.00$500.00$270.00$250.00
134Conifer trees, #5 container (1040-0118000E)EACH3$250.00$250.00$22.00$250.00$20.00$22.00
135Adjusting boxes (0490-0100000E)EACH1$250.00$500.00$430.00$400.00$50.00$1,000.00
136Removal of structures and obstructions (0310-0106000A)LS1$5,000.00$15,000$21,000$15,000$21,200$2,500.00
137Soil sample collection and analytical testing (0294-0700000E)EACH3$3,500.00$2,500.00$1,769.00$1,500.00$1,090.00$500.00
138Health and safety plan (0294-0100000A)LS1$2,000.00$2,500.00$1,500.00$100.00$17,200$2,500.00
139Asphalt pavement sawcutting, less than 6 inches deep (0310-0119110F)LF138$9.00$5.00$7.00$10.00$7.55$10.00
140Temporary mulching, compost (0280-0104030R)ACRE0.67$25,000$25,000$19,000$4,000.00$20,800$20,000
141General structural concrete, class TMC 4000 (0540-0302000A)CY107$1,121.50$1,728.97$1,429.91$1,542.06$982.24$186.92
142General structural concrete, class 4000 (0540-0302000A)CY307$846.91$895.77$2,028.66$1,172.64$1,465.80$1,628.66
143Foundation concrete, class TMC 4000 (0540-0102000A)CY202$594.06$915.84$742.57$965.35$767.33$990.10
144Reinforcement, grade 60 (0530-0104000A)LB79,000$1.56$1.33$1.48$1.27$1.65$1.39
145Turbidity monitoring (0290-0200000A)LS1$4,000.00$1,500.00$6,250.00$100.00$18,000$2,000.00
146Temporary water management facility at station "D" 16+00 (0245-0100000A)LS1$50,000$25,000$40,000$10,000$75,000$80,000
147Removal of pipes (0310-0100000F)LF210$24.00$15.00$18.00$35.00$64.00$30.00
ODOT contract 15679: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy