SCDOT contract 0274970 bid tabulation

I-20 Rehab 1-5 EB and WB. Let by South Carolina DOT on October 14, 2025, Aiken, District 7. 2 bids received; low bid $10,446,414 by C.R. Jackson, Inc..

Owner
South Carolina DOT
Letting
14 OCT 2025
Pay items
28
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.R. Jackson, Inc.$10,446,414Low
2Reeves Construction Company$10,865,994+4.0%
SCDOT contract 0274970: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.R. Jackson, Inc.2. Reeves Construction Company
0010Mobilization (1031000)LS1$520,000$540,000
0020Bonds and insurance (1032010)LS1$205,000$215,000
0030Cross slope verification (1055102)LS1$500,000$370,000
0040Removal of exist. guardrail (2027801)LF16,500$1.00$1.00
0050Borrow excavation (2033000)CY2,100$75.00$78.50
0060Liquid asphalt binder PG64-22 (4011004)TON1,331.14$650.00$735.00
0070Liquid asphalt binder PG76-22 (4011008)TON962.00$750.00$950.00
0080Asphalt surface course type B (4040320)TON15,516.16$105.00$92.50
0090Asphalt surface course type E (4040360)TON7,350$110.00$123.15
0100Stone matrix asphalt surface course - 9.5 MM (4121000)TON15,516.16$140.00$99.60
0110Milling existing concrete pav.(variable) (5013990)SY5,000$35.00$35.00
0120Full depth concrete pavement patch - 10" (5021025)SY2,500$455.00$685.00
0130Traffic control (6011000)LS1$846,000$1,175,110
0140Permanent construction signs (ground mounted) (6051120)SF484$6.95$5.00
0150Construction zone electric changeable message sign (trailer (6062000)EACH2$6,000.00$4,000.00
01606" white broken lines -(gaps excluded)-fast dry paint (6240007)LF27,562$0.25$0.35
01706" white solid lines (PVT. edge lines)-fast dry paint (6240012)LF110,246$0.22$0.35
01806"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240111)LF110,246$0.22$0.35
01906" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007)LF9,187$1.02$1.50
02006" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF36,749$1.02$0.95
02106" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076)LF36,749$1.02$0.95
0220Milled-in rumble strip (6321000)MI13.92$975.00$860.00
0225Adjust catch basin (7197110)EACH1$10,000$10,000
0230MT3 leading end treatment TL3 (8051151)EACH20$2,450.00$2,450.00
0240MB trailing end treatment (8051710)EACH20$1,508.75$1,508.75
0250MGS3 GR standard shoulder (8052100)LF16,500$23.85$23.85
0260MTBBC3 MASH thrie-beam barrier connector TL3 (8053253)EACH8$2,300.00$2,300.00
0270Permanent grassing for non-permitted resurfacing projects (8100102)ACRE6.80$3,300.00$3,680.00
SCDOT contract 0274970: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy