SCDOT contract 0370441 bid tabulation

2025 Allendale Rehabilitation and CTC. Let by South Carolina DOT on February 11, 2025, Allendale, District 7. 2 bids received; low bid $6,571,521 by C.R. Jackson, Inc..

Owner
South Carolina DOT
Letting
11 FEB 2025
Pay items
39
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.R. Jackson, Inc.$6,571,521Low
2Blythe Construction, Inc.$6,862,069+4.0%
SCDOT contract 0370441: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.R. Jackson, Inc.2. Blythe Construction, Inc.
0010Mobilization (1031000)LS1$328,000$343,100
0020Bonds and insurance (1032010)LS1$131,000$25,000
0030Railroad insurance and flagging CSX (1071403)LS1$15,000$17,500
0040Removal & disposal of existing pavement (2023000)SY25$40.00$40.00
0050Borrow excavation (2033000)CY1,650$40.00$165.00
0060Excavation for shoulder paving (2036000)STA1,044.38$125.00$100.00
0070Hauling of excavated shoulder material (2072000)STA1,044.38$40.00$75.00
0080Maintenance stone (3059900)TON20.60$225.00$87.00
0090HMA shoulder widening course (3104000)TON5,631.71$85.00$118.00
0100Liquid asphalt binder PG64-22 (4011004)TON1,541.51$660.00$700.00
0110Aramid fiber (4011500)LB5,520$75.00$72.25
0120Full depth asph. pav. patching 4" unif. (4012040)SY1,610$92.00$60.00
0130Full depth asph. pav. patching 6" unif. (4012060)SY450$95.00$99.00
0140Milling existing asphalt pavement (variable) (4013990)SY6,600$12.00$21.25
0150Asphalt surface course type B (4040320)TON15,588.85$110.00$132.25
0160Asphalt surface course type C (4040340)TON4,120.48$105.00$125.50
0170Asphalt surface course type D (4040350)TON1,991.10$150.00$140.00
0180Driveway paving-surface type D (4047230)TON508.13$250.00$288.25
0190Traffic control (6011000)LS1$909,000$401,000
0200Permanent construction signs (ground mounted) (6051120)SF1,752$6.35$6.35
02104" white broken lines -(gaps excluded)-fast dry paint (6240005)LF16,970$0.14$0.14
02204" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF115,920$0.13$0.13
023024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF1,390$1.00$1.00
0240Railroad crossing symbols - fast dry paint (6240045)EACH2$100.00$100.00
02504" yellow broken lines(gaps exc) - fast dry paint (6240105)LF4,960$0.14$0.14
02604"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF125,660$0.13$0.13
02704" white broken lines(gaps excl.)perm.PVMT.marking (6251005)LF8,530$0.54$0.54
02804" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010)LF73,220$0.52$0.52
029024" white solid lines (stop/diag lines)- perm.PVMT.marking (6251025)LF695$9.00$9.00
0300Railroad crossing symbols - perm.PVMT.marking (6251045)EACH1$750.00$750.00
03104" yellow broken lines(gaps exc)perm.PVMT.marking (6251064)LF2,480$0.54$0.54
03204" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251074)LF62,830$0.52$0.52
0330Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH425$6.00$6.00
0340Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH383$6.00$6.00
0350Milled-in rumble strip (6321000)MI17.77$500.00$500.00
0360Detectable warning material (7204900)SF12.50$60.00$60.00
0370Pedestrian ramp construction (7209000)SY25$200.00$200.00
0380Surface applied detectable warning (7209100)SF50$75.00$75.00
0390Permanent grassing for non-permitted resurfacing projects (8100102)ACRE11.26$3,300.00$3,175.00
SCDOT contract 0370441: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy